Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Working papers

  1. Schnabel, André & Kellenbrink, Carolin & Helber, Stefan, 2017. "Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints," Hannover Economic Papers (HEP) dp-593, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.

  2. Helber, Stefan & Böhme, Daniel & Oucherif, Farid & Lagershausen, Svenja & Kasper, Steffen, 2014. "A hierarchical facility layout planning approach for large and complex hospitals," Hannover Economic Papers (HEP) dp-527, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Abdelahad Chraibi & Ibrahim H. Osman & Said Kharraja, 2019. "Adaptive layout for operating theatre in hospitals: different mathematical models for optimal layouts," Annals of Operations Research, Springer, vol. 272(1), pages 493-527, January.
    2. I. Jerin Leno & S. Saravana Sankar & S. G. Ponnambalam, 2018. "MIP model and elitist strategy hybrid GA–SA algorithm for layout design," Journal of Intelligent Manufacturing, Springer, vol. 29(2), pages 369-387, February.
    3. Farouq Halawa & Sreenath Chalil Madathil & Alice Gittler & Mohammad T. Khasawneh, 2020. "Advancing evidence-based healthcare facility design: a systematic literature review," Health Care Management Science, Springer, vol. 23(3), pages 453-480, September.
    4. Feng, Yanling & Li, Guo & Sethi, Suresh P., 2018. "A three-layer chromosome genetic algorithm for multi-cell scheduling with flexible routes and machine sharing," International Journal of Production Economics, Elsevier, vol. 196(C), pages 269-283.
    5. T. G. Pradeepmon & Vinay V. Panicker & R. Sridharan, 2021. "A variable neighbourhood search enhanced estimation of distribution algorithm for quadratic assignment problems," OPSEARCH, Springer;Operational Research Society of India, vol. 58(1), pages 203-233, March.
    6. Alexander Hübner & Heinrich Kuhn & Manuel Walther, 2018. "Combining clinical departments and wards in maximum-care hospitals," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 679-709, July.

  3. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Hendrik Butemann & Katja Schimmelpfeng, 2020. "Long-term electricity production planning of a flexible biogas plant considering wear and tear," Journal of Business Economics, Springer, vol. 90(9), pages 1289-1313, November.

  4. Kellenbrink, Carolin & Helber, Stefan, 2013. "Scheduling resource-constrained projects with a flexible project structure," Hannover Economic Papers (HEP) dp-511, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. André Schnabel & Carolin Kellenbrink & Stefan Helber, 2018. "Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints," Business Research, Springer;German Academic Association for Business Research, vol. 11(2), pages 329-356, September.
    2. Ben Issa, Samer & Patterson, Raymond A. & Tu, Yiliu, 2021. "Solving resource-constrained multi-project environment under different activity assumptions," International Journal of Production Economics, Elsevier, vol. 232(C).
    3. Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.
    4. Hongbo Li & Linwen Zheng & Hanyu Zhu, 2023. "Resource leveling in projects with flexible structures," Annals of Operations Research, Springer, vol. 321(1), pages 311-342, February.
    5. Servranckx, Tom & Vanhoucke, Mario, 2019. "Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules," European Journal of Operational Research, Elsevier, vol. 279(1), pages 38-53.
    6. Farida Saleem & Imran Murtaza & Shabir Hyder & Muhammad Imran Malik, 2020. "Public Health and Project Management: Do Projects Deliver?," IJERPH, MDPI, vol. 17(19), pages 1-11, October.
    7. Servranckx, Tom & Vanhoucke, Mario, 2019. "A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs," European Journal of Operational Research, Elsevier, vol. 273(3), pages 841-860.
    8. Luise-Sophie Hoffmann & Carolin Kellenbrink & Stefan Helber, 2020. "Simultaneous structuring and scheduling of multiple projects with flexible project structures," Journal of Business Economics, Springer, vol. 90(5), pages 679-711, June.
    9. Kellenbrink, Carolin & Helber, Stefan, 2014. "Quality- and profit-oriented scheduling of flexible resource-constrained projects," Hannover Economic Papers (HEP) dp-549, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    10. Masoud Arjmand & Amir Abbas Najafi & Majid Ebrahimzadeh, 2020. "Evolutionary algorithms for multi-objective stochastic resource availability cost problem," OPSEARCH, Springer;Operational Research Society of India, vol. 57(3), pages 935-985, September.
    11. Ripon K. Chakrabortty & Ruhul A. Sarker & Daryl L. Essam, 2020. "Single mode resource constrained project scheduling with unreliable resources," Operational Research, Springer, vol. 20(3), pages 1369-1403, September.

  5. Helber, Stefan & Sahling, Florian & Schimmelpfeng, Katja, 2011. "Dynamic capacitated lot sizing with random demand and dynamic safety stocks," Hannover Economic Papers (HEP) dp-465, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Julian Englberger & Frank Herrmann & Michael Manitz, 2016. "Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6192-6215, October.
    2. Sahling, Florian & Kayser, Ariane, 2016. "Strategic supply network planning with vendor selection under consideration of risk and demand uncertainty," Omega, Elsevier, vol. 59(PB), pages 201-214.
    3. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    4. Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
    5. Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
    6. Sazvar, Z. & Mirzapour Al-e-hashem, S.M.J. & Govindan, K. & Bahli, B., 2016. "A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 232-261.
    7. Rafiei, Rezvan & Nourelfath, Mustapha & Gaudreault, Jonathan & De Santa-Eulalia, Luis Antonio & Bouchard, Mathieu, 2015. "Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study," International Journal of Production Economics, Elsevier, vol. 165(C), pages 90-99.
    8. Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
    9. Rossi, Roberto & Kilic, Onur A. & Tarim, S. Armagan, 2015. "Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing," Omega, Elsevier, vol. 50(C), pages 126-140.

  6. Schimmelpfeng, Katja & Helber, Stefan & Kasper, Steffen, 2010. "Decision support for rehabilitation hospital scheduling," Hannover Economic Papers (HEP) dp-458, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Gartner, Daniel & Kolisch, Rainer, 2014. "Scheduling the hospital-wide flow of elective patients," European Journal of Operational Research, Elsevier, vol. 233(3), pages 689-699.
    2. Marynissen, Joren & Demeulemeester, Erik, 2019. "Literature review on multi-appointment scheduling problems in hospitals," European Journal of Operational Research, Elsevier, vol. 272(2), pages 407-419.
    3. Lizhong Zhao & Chen-Fu Chien & Mitsuo Gen, 2018. "A bi-objective genetic algorithm for intelligent rehabilitation scheduling considering therapy precedence constraints," Journal of Intelligent Manufacturing, Springer, vol. 29(5), pages 973-988, June.

  7. Sahling, Florian & Buschkühl, Lisbeth & Tempelmeier, Horst & Helber, Stefan, 2008. "Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic," Hannover Economic Papers (HEP) dp-400, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Li, Yantong & Chu, Feng & Côté, Jean-François & Coelho, Leandro C. & Chu, Chengbin, 2020. "The multi-plant perishable food production routing with packaging consideration," International Journal of Production Economics, Elsevier, vol. 221(C).
    2. Liang, Zhe & He, Yan & Wu, Tao & Zhang, Canrong, 2015. "An informative column generation and decomposition method for a production planning and facility location problem," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 88-96.
    3. Camargo, Victor C.B. & Toledo, Franklina M.B. & Almada-Lobo, Bernardo, 2014. "HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 266-277.
    4. Muller, Laurent Flindt & Spoorendonk, Simon & Pisinger, David, 2012. "A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times," European Journal of Operational Research, Elsevier, vol. 218(3), pages 614-623.
    5. Sahling, Florian & Hahn, Gerd J., 2019. "Dynamic lot sizing in biopharmaceutical manufacturing," International Journal of Production Economics, Elsevier, vol. 207(C), pages 96-106.
    6. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2013. "Pricing, relaxing and fixing under lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 230(2), pages 399-411.
    7. Li, Yantong & Chu, Feng & Chu, Chengbin & Zhu, Zhanguo, 2019. "An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 914-927.
    8. Lang, Jan Christian & Shen, Zuo-Jun Max, 2011. "Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions," European Journal of Operational Research, Elsevier, vol. 214(3), pages 595-605, November.

  8. Helber, Stefan & Schimmelpfeng, Katja & Stolletz, Raik & Lagershausen, Svenja, 2008. "Using linear programming to analyze and optimize stochastic flow lines," Hannover Economic Papers (HEP) dp-389, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Wai Kin Victor Chan, 2016. "Linear Programming Formulation of Idle Times for Single-Server Discrete-Event Simulation Models," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(05), pages 1-17, October.
    2. Ziwei Lin & Nicla Frigerio & Andrea Matta & Shichang Du, 2021. "Multi-fidelity surrogate-based optimization for decomposed buffer allocation problems," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 223-253, March.
    3. Khayyati, Siamak & Tan, Barış, 2020. "Data-driven control of a production system by using marking-dependent threshold policy," International Journal of Production Economics, Elsevier, vol. 226(C).
    4. George Liberopoulos, 2020. "Comparison of optimal buffer allocation in flow lines under installation buffer, echelon buffer, and CONWIP policies," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 297-365, June.
    5. Helber, Stefan & Schimmelpfeng, Katja & Stolletz, Raik, 2009. "Setting inventory levels of CONWIP flow lines via linear programming," Hannover Economic Papers (HEP) dp-436, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    6. S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
    7. Kolb, Oliver & Göttlich, Simone, 2015. "A continuous buffer allocation model using stochastic processes," European Journal of Operational Research, Elsevier, vol. 242(3), pages 865-874.

  9. Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Rowshannahad, Mehdi & Absi, Nabil & Dauzère-Pérès, Stéphane & Cassini, Bernard, 2018. "Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products," International Journal of Production Economics, Elsevier, vol. 198(C), pages 25-37.
    2. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    3. Coindreau, Marc-Antoine & Gallay, Olivier & Zufferey, Nicolas & Laporte, Gilbert, 2021. "Inbound and outbound flow integration for cross-docking operations," European Journal of Operational Research, Elsevier, vol. 294(3), pages 1153-1163.
    4. Sahling, Florian & Buschkühl, Lisbeth & Tempelmeier, Horst & Helber, Stefan, 2008. "Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic," Hannover Economic Papers (HEP) dp-400, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    5. Neves-Moreira, Fábio & Pereira da Silva, Diogo & Guimarães, Luís & Amorim, Pedro & Almada-Lobo, Bernardo, 2018. "The time window assignment vehicle routing problem with product dependent deliveries," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 116(C), pages 163-183.
    6. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    7. Cunha, Jesus O. & Melo, Rafael A., 2021. "Valid inequalities, preprocessing, and an effective heuristic for the uncapacitated three-level lot-sizing and replenishment problem with a distribution structure," European Journal of Operational Research, Elsevier, vol. 295(3), pages 874-892.
    8. Stadtler, Hartmut, 2011. "Multi-level single machine lot-sizing and scheduling with zero lead times," European Journal of Operational Research, Elsevier, vol. 209(3), pages 241-252, March.
    9. Jing, Fuying & Chao, Xiangrui, 2022. "Forecast horizons for a two-echelon dynamic lot-sizing problem," Omega, Elsevier, vol. 110(C).
    10. Thevenin, Simon & Ben-Ammar, Oussama & Brahimi, Nadjib, 2022. "Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1199-1215.
    11. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    12. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    13. Alexander Franz & Julia Rieck & Jürgen Zimmermann, 2019. "Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages," Annals of Operations Research, Springer, vol. 274(1), pages 241-265, March.
    14. Marcos Mansano Furlan & Maristela Oliveira Santos, 2017. "BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 929-944, April.
    15. Hadi Farhangi, 2021. "Multi-Echelon Supply Chains with Lead Times and Uncertain Demands," SN Operations Research Forum, Springer, vol. 2(3), pages 1-25, September.
    16. Neves-Moreira, Fábio & Veldman, Jasper & Teunter, Ruud H., 2021. "Service operation vessels for offshore wind farm maintenance: Optimal stock levels," Renewable and Sustainable Energy Reviews, Elsevier, vol. 146(C).
    17. Absi, Nabil & van den Heuvel, Wilco, 2019. "Worst case analysis of Relax and Fix heuristics for lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 279(2), pages 449-458.
    18. Karla B. Freitas & Márcio S. Arantes & Claudio F. M. Toledo & Alexandre C. B. Delbem, 2020. "MIQP model and improvement heuristic for power loss minimization in distribution system with network reconfiguration," Journal of Heuristics, Springer, vol. 26(1), pages 59-81, February.
    19. Al-Shihabi, Sameh, 2021. "A Novel Core-Based Optimization Framework for Binary Integer Programs- the Multidemand Multidimesional Knapsack Problem as a Test Problem," Operations Research Perspectives, Elsevier, vol. 8(C).
    20. Stefan Helber & Daniel Böhme & Farid Oucherif & Svenja Lagershausen & Steffen Kasper, 2016. "A hierarchical facility layout planning approach for large and complex hospitals," Flexible Services and Manufacturing Journal, Springer, vol. 28(1), pages 5-29, June.
    21. Camargo, Victor C.B. & Toledo, Franklina M.B. & Almada-Lobo, Bernardo, 2014. "HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 266-277.
    22. Yongjian Li & Xiaoqiang Cai & Lei Xu & Wenxia Yang, 2016. "Heuristic approach on dynamic lot-sizing model for durable products with end-of-use constraints," Annals of Operations Research, Springer, vol. 242(2), pages 265-283, July.
    23. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
    24. Taillard, Éric D. & Helsgaun, Keld, 2019. "POPMUSIC for the travelling salesman problem," European Journal of Operational Research, Elsevier, vol. 272(2), pages 420-429.
    25. Chen, Haoxun, 2015. "Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems," Omega, Elsevier, vol. 56(C), pages 25-36.
    26. Neves-Moreira, Fábio & Amorim-Lopes, Mário & Amorim, Pedro, 2020. "The multi-period vehicle routing problem with refueling decisions: Traveling further to decrease fuel cost?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 133(C).
    27. Sahling, Florian & Hahn, Gerd J., 2019. "Dynamic lot sizing in biopharmaceutical manufacturing," International Journal of Production Economics, Elsevier, vol. 207(C), pages 96-106.
    28. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
    29. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
    30. Wei, Mingyuan & Qi, Mingyao & Wu, Tao & Zhang, Canrong, 2019. "Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials," European Journal of Operational Research, Elsevier, vol. 277(2), pages 521-541.
    31. Yajaira Cardona-Valdés & Samuel Nucamendi-Guillén & Rodrigo E. Peimbert-García & Gustavo Macedo-Barragán & Eduardo Díaz-Medina, 2020. "A New Formulation for the Capacitated Lot Sizing Problem with Batch Ordering Allowing Shortages," Mathematics, MDPI, vol. 8(6), pages 1-16, June.
    32. Correa, Renata Naoko & Scarpin, Cassius Tadeu & Ferrari, Linamara Smaniotto & Arce, Julio Eduardo, 2020. "Application of relax-and-fix heuristic in the aggregation of stands for tactical forest scheduling," Forest Policy and Economics, Elsevier, vol. 119(C).
    33. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    34. Soares, Ricardo & Marques, Alexandra & Amorim, Pedro & Rasinmäki, Jussi, 2019. "Multiple vehicle synchronisation in a full truck-load pickup and delivery problem: A case-study in the biomass supply chain," European Journal of Operational Research, Elsevier, vol. 277(1), pages 174-194.
    35. Junqueira, Rogerio de Ávila Ribeiro & Morabito, Reinaldo, 2019. "Modeling and solving a sugarcane harvest front scheduling problem," International Journal of Production Economics, Elsevier, vol. 213(C), pages 150-160.
    36. Markus Mickein & Matthes Koch & Knut Haase, 2022. "A Decision Support System for Brewery Production Planning at Feldschlösschen," Interfaces, INFORMS, vol. 52(2), pages 158-172, March.
    37. Horst Tempelmeier & Karina Copil, 2016. "Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 819-847, October.
    38. Stadtler, Hartmut & Sahling, Florian, 2013. "A lot-sizing and scheduling model for multi-stage flow lines with zero lead times," European Journal of Operational Research, Elsevier, vol. 225(3), pages 404-419.
    39. Diego Fiorotto & Silvio Araujo, 2014. "Reformulation and a Lagrangian heuristic for lot sizing problem on parallel machines," Annals of Operations Research, Springer, vol. 217(1), pages 213-231, June.
    40. Franco Basso & Juan Pablo Contreras & Raúl Pezoa & Alejandro Troncozo & Mauricio Varas, 2023. "Optimizing the wine transportation process from bottling plants to ports," Operational Research, Springer, vol. 23(2), pages 1-28, June.
    41. Campelo, Pedro & Neves-Moreira, Fábio & Amorim, Pedro & Almada-Lobo, Bernardo, 2019. "Consistent vehicle routing problem with service level agreements: A case study in the pharmaceutical distribution sector," European Journal of Operational Research, Elsevier, vol. 273(1), pages 131-145.
    42. Neves-Moreira, Fábio & Almada-Lobo, Bernardo & Cordeau, Jean-François & Guimarães, Luís & Jans, Raf, 2019. "Solving a large multi-product production-routing problem with delivery time windows," Omega, Elsevier, vol. 86(C), pages 154-172.
    43. Lang, Jan Christian & Shen, Zuo-Jun Max, 2011. "Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions," European Journal of Operational Research, Elsevier, vol. 214(3), pages 595-605, November.
    44. Dumez, Dorian & Tilk, Christian & Irnich, Stefan & Lehuédé, Fabien & Olkis, Katharina & Péton, Olivier, 2023. "A matheuristic for a 2-echelon vehicle routing problem with capacitated satellites and reverse flows," European Journal of Operational Research, Elsevier, vol. 305(1), pages 64-84.
    45. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    46. Dávid Gyulai & András Pfeiffer & László Monostori, 2017. "Robust production planning and control for multi-stage systems with flexible final assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 55(13), pages 3657-3673, July.
    47. Neves-Moreira, F. & Amorim, P. & Guimarães, L. & Almada-Lobo, B., 2016. "A long-haul freight transportation problem: Synchronizing resources to deliver requests passing through multiple transshipment locations," European Journal of Operational Research, Elsevier, vol. 248(2), pages 487-506.
    48. Rasmus Ø. Mikkelsen & Dennis S. Holm, 2022. "A parallelized matheuristic for the International Timetabling Competition 2019," Journal of Scheduling, Springer, vol. 25(4), pages 429-452, August.
    49. Michael Jahr, 2022. "Teaching Mathematical Modelling and Programming with GAMS in Dual Management Master Curricula Using Flipped Classrooms and Open Book Exams," SN Operations Research Forum, Springer, vol. 3(3), pages 1-12, September.

  10. Helber, Stefan & Henken, Kirsten, 2007. "Profit-oriented shift scheduling of inbound contact centers with skills-based routing, impatient customers, and retrials," Hannover Economic Papers (HEP) dp-379, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Cited by:

    1. Helber, Stefan & Schimmelpfeng, Katja & Stolletz, Raik & Lagershausen, Svenja, 2008. "Using linear programming to analyze and optimize stochastic flow lines," Hannover Economic Papers (HEP) dp-389, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    2. Jerome Niyirora & Jamol Pender, 2016. "Optimal staffing in nonstationary service centers with constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(8), pages 615-630, December.
    3. Abdulaziz Ahmed & Elizabeth Frohn, 2021. "A predictive and prescriptive analytical framework for scheduling language medical interpreters," Health Care Management Science, Springer, vol. 24(3), pages 531-550, September.
    4. Jaime Miranda & Pablo A. Rey & Antoine Sauré & Richard Weber, 2018. "Metro Uses a Simulation-Optimization Approach to Improve Fare-Collection Shift Scheduling," Interfaces, INFORMS, vol. 48(6), pages 529-542, November.
    5. Örmeci, E. Lerzan & Salman, F. Sibel & Yücel, Eda, 2014. "Staff rostering in call centers providing employee transportation," Omega, Elsevier, vol. 43(C), pages 41-53.
    6. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    7. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    8. Oyku Ahipasaoglu & Nesim Erkip & Oya Ekin Karasan, 2019. "The venue management problem: setting staffing levels, shifts and shift schedules at concession stands," Journal of Scheduling, Springer, vol. 22(1), pages 69-83, February.
    9. Benjamin Legros & Sihan Ding & Rob Mei & Oualid Jouini, 2017. "Call centers with a postponed callback offer," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(4), pages 1097-1125, October.

Articles

  1. Justine Broihan & Inka Nozinski & Niklas Pöch & Stefan Helber, 2022. "Designing Dynamic Inductive Charging Infrastructures for Airport Aprons with Multiple Vehicle Types," Energies, MDPI, vol. 15(11), pages 1-24, June.

    Cited by:

    1. Niklas Pöch & Inka Nozinski & Justine Broihan & Stefan Helber, 2022. "Numerical Study on Planning Inductive Charging Infrastructures for Electric Service Vehicles on Airport Aprons," Energies, MDPI, vol. 15(18), pages 1-25, September.

  2. Stefan Helber & Ton Kok & Heinrich Kuhn & Michael Manitz & Andrea Matta & Raik Stolletz, 2019. "Quantitative approaches in production management," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 867-870, December.

    Cited by:

    1. Changwen Li & Bin Cao & Yong-Wu Zhou & T. C. Edwin Cheng, 2023. "Pricing, coalition stability, and profit allocation in the pull assembly supply chains under competition," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 45(3), pages 977-1011, September.

  3. André Schnabel & Carolin Kellenbrink & Stefan Helber, 2018. "Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints," Business Research, Springer;German Academic Association for Business Research, vol. 11(2), pages 329-356, September.
    See citations under working paper version above.
  4. Stefan Helber & Justine Broihan & Young Jae Jang & Peter Hecker & Thomas Feuerle, 2018. "Location Planning for Dynamic Wireless Charging Systems for Electric Airport Passenger Buses," Energies, MDPI, vol. 11(2), pages 1-16, January.

    Cited by:

    1. Niklas Pöch & Inka Nozinski & Justine Broihan & Stefan Helber, 2022. "Numerical Study on Planning Inductive Charging Infrastructures for Electric Service Vehicles on Airport Aprons," Energies, MDPI, vol. 15(18), pages 1-25, September.
    2. Alwesabi, Yaseen & Liu, Zhaocai & Kwon, Soongeol & Wang, Yong, 2021. "A novel integration of scheduling and dynamic wireless charging planning models of battery electric buses," Energy, Elsevier, vol. 230(C).
    3. Yuping Lin & Kai Zhang & Zuo-Jun Max Shen & Lixin Miao, 2019. "Charging Network Planning for Electric Bus Cities: A Case Study of Shenzhen, China," Sustainability, MDPI, vol. 11(17), pages 1-27, August.
    4. Liu, Zhaocai & Wang, Qichao & Sigler, Devon & Kotz, Andrew & Kelly, Kenneth J. & Lunacek, Monte & Phillips, Caleb & Garikapati, Venu, 2023. "Data-driven simulation-based planning for electric airport shuttle systems: A real-world case study," Applied Energy, Elsevier, vol. 332(C).
    5. Schwerdfeger, Stefan & Bock, Stefan & Boysen, Nils & Briskorn, Dirk, 2022. "Optimizing the electrification of roads with charge-while-drive technology," European Journal of Operational Research, Elsevier, vol. 299(3), pages 1111-1127.
    6. Alwesabi, Yaseen & Wang, Yong & Avalos, Raul & Liu, Zhaocai, 2020. "Electric bus scheduling under single depot dynamic wireless charging infrastructure planning," Energy, Elsevier, vol. 213(C).
    7. Justine Broihan & Inka Nozinski & Niklas Pöch & Stefan Helber, 2022. "Designing Dynamic Inductive Charging Infrastructures for Airport Aprons with Multiple Vehicle Types," Energies, MDPI, vol. 15(11), pages 1-24, June.
    8. Bogdan Cristian Florea & Dragos Daniel Taralunga, 2020. "Blockchain IoT for Smart Electric Vehicles Battery Management," Sustainability, MDPI, vol. 12(10), pages 1-25, May.
    9. Kayhan Alamatsaz & Sadam Hussain & Chunyan Lai & Ursula Eicker, 2022. "Electric Bus Scheduling and Timetabling, Fast Charging Infrastructure Planning, and Their Impact on the Grid: A Review," Energies, MDPI, vol. 15(21), pages 1-39, October.

  5. Bekir Yildiz & Peter Förster & Thomas Feuerle & Peter Hecker & Stefan Bugow & Stefan Helber, 2018. "A Generic Approach to Analyze the Impact of a Future Aircraft Design on the Boarding Process," Energies, MDPI, vol. 11(2), pages 1-12, January.

    Cited by:

    1. Camelia Delcea & Liviu-Adrian Cotfas & Mostafa Salari & R. John Milne, 2018. "Investigating the Random Seat Boarding Method without Seat Assignments with Common Boarding Practices Using an Agent-Based Modeling," Sustainability, MDPI, vol. 10(12), pages 1-28, December.

  6. Carolin Kellenbrink & Stefan Helber, 2016. "Quality- and profit-oriented scheduling of resource-constrained projects with flexible project structure via a genetic algorithm," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 10(5), pages 574-595.

    Cited by:

    1. André Schnabel & Carolin Kellenbrink & Stefan Helber, 2018. "Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints," Business Research, Springer;German Academic Association for Business Research, vol. 11(2), pages 329-356, September.
    2. Luise-Sophie Hoffmann & Carolin Kellenbrink & Stefan Helber, 2020. "Simultaneous structuring and scheduling of multiple projects with flexible project structures," Journal of Business Economics, Springer, vol. 90(5), pages 679-711, June.

  7. Stefan Helber & Daniel Böhme & Farid Oucherif & Svenja Lagershausen & Steffen Kasper, 2016. "A hierarchical facility layout planning approach for large and complex hospitals," Flexible Services and Manufacturing Journal, Springer, vol. 28(1), pages 5-29, June.
    See citations under working paper version above.
  8. Kellenbrink, Carolin & Helber, Stefan, 2015. "Scheduling resource-constrained projects with a flexible project structure," European Journal of Operational Research, Elsevier, vol. 246(2), pages 379-391.
    See citations under working paper version above.
  9. Stefan Helber & Katja Schimmelpfeng & Raik Stolletz & Svenja Lagershausen, 2011. "Using linear programming to analyze and optimize stochastic flow lines," Annals of Operations Research, Springer, vol. 182(1), pages 193-211, January.
    See citations under working paper version above.
  10. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    See citations under working paper version above.
  11. Stefan Helber & Hanifa Jusić, 2004. "A New Decomposition Approach for Non-Cyclic Continuous Material Flow Lines with a Merging Flow of Material," Annals of Operations Research, Springer, vol. 125(1), pages 117-139, January.

    Cited by:

    1. Barış Tan & Stanley Gershwin, 2011. "Modelling and analysis of Markovian continuous flow systems with a finite buffer," Annals of Operations Research, Springer, vol. 182(1), pages 5-30, January.
    2. Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
    3. Marcello Colledani & Stanley Gershwin, 2013. "A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines," Annals of Operations Research, Springer, vol. 209(1), pages 5-40, October.
    4. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
    5. Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.

  12. Stefan Helber, 2000. "Approximate analysis of unreliable transfer lines with splits in the flow of material," Annals of Operations Research, Springer, vol. 93(1), pages 217-243, January.

    Cited by:

    1. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.

  13. Helber, Stefan, 1998. "Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times," European Journal of Operational Research, Elsevier, vol. 109(1), pages 24-42, August.

    Cited by:

    1. Michael Manitz, 2015. "Analysis of assembly/disassembly queueing networks with blocking after service and general service times," Annals of Operations Research, Springer, vol. 226(1), pages 417-441, March.
    2. Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
    3. Beixin Xia & Binghai Zhou & Ci Chen & Lifeng Xi, 2016. "A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 765-779, August.
    4. Kiesmüller, G.P. & Sachs, F.E., 2020. "Spare parts or buffer? How to design a transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 284(1), pages 121-134.
    5. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.

  14. Tempelmeier, Horst & Helber, Stefan, 1994. "A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures," European Journal of Operational Research, Elsevier, vol. 75(2), pages 296-311, June.

    Cited by:

    1. Sahling, Florian & Buschkühl, Lisbeth & Tempelmeier, Horst & Helber, Stefan, 2008. "Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic," Hannover Economic Papers (HEP) dp-400, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    2. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    3. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    4. Hartmut Stadtler, 2000. "Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem," Management Science, INFORMS, vol. 46(2), pages 318-326, February.
    5. Almeder, Christian, 2010. "A hybrid optimization approach for multi-level capacitated lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 200(2), pages 599-606, January.
    6. Kimms, Alf, 1996. "A genetic algorithm for multi-level, multi-machine lot sizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 415, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    7. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
    8. Hadi Farhangi, 2021. "Multi-Echelon Supply Chains with Lead Times and Uncertain Demands," SN Operations Research Forum, Springer, vol. 2(3), pages 1-25, September.
    9. Hartmut Stadtler, 2003. "Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows," Operations Research, INFORMS, vol. 51(3), pages 487-502, June.
    10. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
    11. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    12. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
    13. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Ozdamar, Linet & Barbarosoglu, Gulay, 2000. "An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 68(3), pages 319-331, December.
    15. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    16. Kimms, Alf, 1996. "Improved lower bounds for the proportional lot sizing and scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 414, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Kuhn, Heinrich, 1997. "A dynamic lot sizing model with exponential machine breakdowns," European Journal of Operational Research, Elsevier, vol. 100(3), pages 514-536, August.
    18. Ozdamar, Linet & Birbil, Sevket Ilker, 1998. "Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions," European Journal of Operational Research, Elsevier, vol. 110(3), pages 525-547, November.
    19. Drexl, Andreas & Haase, Knut, 1993. "Sequential-analysis-based randomized-regret-methods for lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 323, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    21. Gruson, Matthieu & Cordeau, Jean-François & Jans, Raf, 2021. "Benders decomposition for a stochastic three-level lot sizing and replenishment problem with a distribution structure," European Journal of Operational Research, Elsevier, vol. 291(1), pages 206-217.
    22. Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
    23. Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    24. Kimms, Alf & Drexl, Andreas, 1996. "Proportional lot sizing and scheduling: Some extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 407, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    25. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    26. Drexl, Andreas & Haase, Knut, 1997. "Vorbeugende Instandhaltung und Eilaufträge in der Produktionsplanung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 450, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    27. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    28. Stefan Helber & Ton Kok & Heinrich Kuhn & Michael Manitz & Andrea Matta & Raik Stolletz, 2019. "Quantitative approaches in production management," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 867-870, December.
    29. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    30. Gansterer, Margaretha & Födermayr, Patrick & Hartl, Richard F., 2021. "The capacitated multi-level lot-sizing problem with distributed agents," International Journal of Production Economics, Elsevier, vol. 235(C).
    31. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.

Chapters

  1. Stefan Helber, 2006. "Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity," Springer Books, in: George Liberopoulos & Chrissoleon T. Papadopoulos & Barış Tan & J. M. Smith & Stanley B. Gershwin (ed.), Stochastic Modeling of Manufacturing Systems, pages 55-76, Springer.

    Cited by:

Books

  1. Stefan Helber & Michael Breitner & Daniel Rösch & Cornelia Schön & Johann-Matthias Graf von der Schu (ed.), 2014. "Operations Research Proceedings 2012," Operations Research Proceedings, Springer, edition 127, number 978-3-319-00795-3, June.

    Cited by:

    1. Bierwirth, Christian & Meisel, Frank, 2015. "A follow-up survey of berth allocation and quay crane scheduling problems in container terminals," European Journal of Operational Research, Elsevier, vol. 244(3), pages 675-689.
    2. Schwarz, Hannes & Bertsch, Valentin & Fichtner, Wolf, 2015. "Two-stage stochastic, large-scale optimization of a decentralized energy system - a residential quarter as case study," Working Paper Series in Production and Energy 10, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
    3. Bertsch, Valentin & Geldermann, Jutta & Lühn, Tobias, 2017. "What drives the profitability of household PV investments, self-consumption and self-sufficiency?," MPRA Paper 78644, University Library of Munich, Germany.
    4. Goeke, Dominik, 2019. "Granular tabu search for the pickup and delivery problem with time windows and electric vehicles," European Journal of Operational Research, Elsevier, vol. 278(3), pages 821-836.
    5. Goeke, D. & Schneider, M., 2015. "Routing a Mixed Fleet of Electric and Conventional Vehicles," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 65939, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. Goeke, Dominik & Schneider, Michael, 2015. "Routing a mixed fleet of electric and conventional vehicles," European Journal of Operational Research, Elsevier, vol. 245(1), pages 81-99.
    7. Pelletier, Samuel & Jabali, Ola & Laporte, Gilbert & Veneroni, Marco, 2017. "Battery degradation and behaviour for electric vehicles: Review and numerical analyses of several models," Transportation Research Part B: Methodological, Elsevier, vol. 103(C), pages 158-187.
    8. Dahlbeck, Mirko, 2021. "A mixed-integer linear programming approach for the T-row and the multi-bay facility layout problem," European Journal of Operational Research, Elsevier, vol. 295(2), pages 443-462.
    9. Esther Mohr & Robert Dochow, 2017. "Risk management strategies for finding universal portfolios," Annals of Operations Research, Springer, vol. 256(1), pages 129-147, September.