IDEAS home Printed from https://ideas.repec.org/p/hal/journl/hal-05030212.html
   My bibliography  Save this paper

Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution

Author

Listed:
  • Ahmed Senoussi

    (Batna 2 - Université de Batna 2 - Mostefa Ben Boulaid)

  • Youcef Boutarfa

    (Batna 2 - Université de Batna 2 - Mostefa Ben Boulaid)

  • Nadjib Brahimi

    (ESC [Rennes] - ESC Rennes School of Business)

  • Tarik Aouam

    (UGENT - Universiteit Gent = Ghent University = Université de Gand)

Abstract

This study considers the planning decisions in a production facility that receives returned products as a contribution to sustainability through the reduction in waste from used products. It involves three processes: the refurbishing and disassembly of returned items and the manufacturing of new items. The process is driven by the demands of new items and collected secondhand items. In this study, we consider a downward substitution, in which new items could be used to meet the demand for secondhand items. The objective is to determine the best production planning schedule to satisfy all demands while minimizing the total costs of production and inventory. We propose and analyze different configurations distinguished by their level of integration and whether they allow substitution. Integration is mainly achieved through the sharing of the inventory of returns between the refurbishing line and the disassembly line, which responsible for feeding the manufacturing process with "as good as new" parts. The best configuration is identified based on the total cost and environmental impact. Four heuristics based on combining relax-and-fix and fix-and-optimize approaches are proposed. Numerical experiments have shown that the heuristics are very efficient, achieving gaps of less than 1% from the optimum in short CPU times for most instances. Numerical experiments have also shown that integration through the sharing of returns inventories leads to considerable cost and environmental benefits.

Suggested Citation

  • Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Post-Print hal-05030212, HAL.
  • Handle: RePEc:hal:journl:hal-05030212
    DOI: 10.3390/su16177353
    Note: View the original document on HAL open archive server: https://hal.science/hal-05030212v1
    as

    Download full text from publisher

    File URL: https://hal.science/hal-05030212v1/document
    Download Restriction: no

    File URL: https://libkey.io/10.3390/su16177353?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Mathijn Retel Helmrich & Raf Jans & Wilco van den Heuvel & Albert Wagelmans, 2014. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," IISE Transactions, Taylor & Francis Journals, vol. 46(1), pages 67-86.
    2. William W. Trigeiro & L. Joseph Thomas & John O. McClain, 1989. "Capacitated Lot Sizing with Setup Times," Management Science, INFORMS, vol. 35(3), pages 353-366, March.
    3. Stadtler, Hartmut & Sahling, Florian, 2013. "A lot-sizing and scheduling model for multi-stage flow lines with zero lead times," European Journal of Operational Research, Elsevier, vol. 225(3), pages 404-419.
    4. Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
    5. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    6. Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
    7. Barry A. Pasternack & Zvi Drezner, 1991. "Optimal inventory policies for substitutable commodities with stochastic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 221-240, April.
    8. Richter, Knut & Weber, Jens, 2001. "The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 447-456, May.
    9. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
    10. Zakaria Chekoubi & Wajdi Trabelsi & Nathalie Sauer & Ilias Majdouline, 2022. "The Integrated Production-Inventory-Routing Problem with Reverse Logistics and Remanufacturing: A Two-Phase Decomposition Heuristic," Sustainability, MDPI, vol. 14(20), pages 1-30, October.
    11. Hartmut Stadtler, 2003. "Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows," Operations Research, INFORMS, vol. 51(3), pages 487-502, June.
    12. Absi, Nabil & van den Heuvel, Wilco, 2019. "Worst case analysis of Relax and Fix heuristics for lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 279(2), pages 449-458.
    13. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    14. AkartunalI, Kerem & Miller, Andrew J., 2009. "A heuristic approach for big bucket multi-level production planning problems," European Journal of Operational Research, Elsevier, vol. 193(2), pages 396-411, March.
    15. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    16. Shin, Hojung & Park, Soohoon & Lee, Euncheol & Benton, W.C., 2015. "A classification of the literature on the planning of substitutable products," European Journal of Operational Research, Elsevier, vol. 246(3), pages 686-699.
    17. Yves Pochet & Laurence A. Wolsey, 1991. "Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes," Management Science, INFORMS, vol. 37(1), pages 53-67, January.
    18. Li, Yongjian & Chen, Jian & Cai, Xiaoqiang, 2007. "Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 105(2), pages 301-317, February.
    19. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    20. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
    21. Angad Mann & Prateek Saxena & Mohamed Almanei & Okechukwu Okorie & Konstantinos Salonitis, 2022. "Environmental Impact Assessment of Different Strategies for the Remanufacturing of User Electronics," Energies, MDPI, vol. 15(7), pages 1-17, March.
    22. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
    23. Stadtler, Hartmut, 2003. "Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 20204, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    24. Inderfurth, Karl, 2004. "Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," International Journal of Production Economics, Elsevier, vol. 90(3), pages 325-343, August.
    25. Y. Boutarfa & A. Senoussi & N. Brahimi & T. Aouam, 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," Post-Print hal-04699008, HAL.
    26. Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
    2. Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
    3. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    4. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
    5. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
    6. Nadjib Brahimi & Tarik Aouam, 2016. "Multi-item production routing problem with backordering: a MILP approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1076-1093, February.
    7. Tao Wu, 2022. "Predictive Search for Capacitated Multi-Item Lot Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 34(1), pages 385-406, January.
    8. Wei, Mingyuan & Qi, Mingyao & Wu, Tao & Zhang, Canrong, 2019. "Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials," European Journal of Operational Research, Elsevier, vol. 277(2), pages 521-541.
    9. Attila, Öykü Naz & Agra, Agostinho & Akartunalı, Kerem & Arulselvan, Ashwin, 2021. "Robust formulations for economic lot-sizing problem with remanufacturing," European Journal of Operational Research, Elsevier, vol. 288(2), pages 496-510.
    10. Absi, Nabil & van den Heuvel, Wilco, 2019. "Worst case analysis of Relax and Fix heuristics for lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 279(2), pages 449-458.
    11. Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2024. "Managing flexibility in stochastic multi-level lot sizing problem with service level constraints," Omega, Elsevier, vol. 122(C).
    12. Wu, Tao & Shi, Leyuan & Geunes, Joseph & AkartunalI, Kerem, 2011. "An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging," European Journal of Operational Research, Elsevier, vol. 214(2), pages 428-441, October.
    13. Chen, Haoxun, 2015. "Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems," Omega, Elsevier, vol. 56(C), pages 25-36.
    14. Rowshannahad, Mehdi & Absi, Nabil & Dauzère-Pérès, Stéphane & Cassini, Bernard, 2018. "Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products," International Journal of Production Economics, Elsevier, vol. 198(C), pages 25-37.
    15. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    16. Lang, Jan Christian & Shen, Zuo-Jun Max, 2011. "Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions," European Journal of Operational Research, Elsevier, vol. 214(3), pages 595-605, November.
    17. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
    18. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    19. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
    20. Guido, Rosita & Groccia, Maria Carmela & Conforti, Domenico, 2018. "An efficient matheuristic for offline patient-to-bed assignment problems," European Journal of Operational Research, Elsevier, vol. 268(2), pages 486-503.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-05030212. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.