IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v231y2015i1p79-10410.1007-s10479-012-1201-7.html
   My bibliography  Save this article

Continuous material flow systems: analysis of marine ports handling bulk materials

Author

Listed:
  • Ünsal Özdoğru
  • Tayfur Altiok

Abstract

Continuous material flow systems operating in bulk port marine terminals give rise to networks of mineral flows through nodes experiencing random stoppages. Material arrives at the system via trains and departs from the system via ships. Operational aspects of the material flow are quite varied and complicated. Therefore, a decomposition approximation method is proposed to study the steady-state behavior of the system to produce performance measures such as the long run pile levels, down time probabilities and the system throughput. Pseudo failure and repair rates of the subsystems are obtained and the subsystems are studied within an iterative algorithm. Numerical examples are provided. Copyright Springer Science+Business Media, LLC 2015

Suggested Citation

  • Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
  • Handle: RePEc:spr:annopr:v:231:y:2015:i:1:p:79-104:10.1007/s10479-012-1201-7
    DOI: 10.1007/s10479-012-1201-7
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s10479-012-1201-7
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s10479-012-1201-7?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yeralan, Sencer & Franck, Wallace E. & Quasem, Mohammad A., 1986. "A continuous materials flow production line model with station breakdown," European Journal of Operational Research, Elsevier, vol. 27(3), pages 289-300, December.
    2. Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.
    3. Barış Tan & Stanley Gershwin, 2011. "Modelling and analysis of Markovian continuous flow systems with a finite buffer," Annals of Operations Research, Springer, vol. 182(1), pages 5-30, January.
    4. Tayfur Altiok, 2000. "Tandem queues in bulk port operations," Annals of Operations Research, Springer, vol. 93(1), pages 1-14, January.
    5. Stanley B. Gershwin, 1987. "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking," Operations Research, INFORMS, vol. 35(2), pages 291-305, April.
    6. Stefan Helber & Hanifa Jusić, 2004. "A New Decomposition Approach for Non-Cyclic Continuous Material Flow Lines with a Merging Flow of Material," Annals of Operations Research, Springer, vol. 125(1), pages 117-139, January.
    7. Hervé Le Bihan & Yves Dallery, 2000. "A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers," Annals of Operations Research, Springer, vol. 93(1), pages 265-297, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Barış Tan & Stanley Gershwin, 2011. "Modelling and analysis of Markovian continuous flow systems with a finite buffer," Annals of Operations Research, Springer, vol. 182(1), pages 5-30, January.
    2. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
    3. Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi, 2015. "The two-machine one-buffer continuous time model with restart policy," Annals of Operations Research, Springer, vol. 231(1), pages 33-64, August.
    4. Marcello Colledani & Stanley Gershwin, 2013. "A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines," Annals of Operations Research, Springer, vol. 209(1), pages 5-40, October.
    5. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    6. Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.
    7. Andrea Matta & Francesca Simone, 2016. "Analysis of two-machine lines with finite buffer, operation-dependent and time-dependent failure modes," International Journal of Production Research, Taylor & Francis Journals, vol. 54(6), pages 1850-1862, March.
    8. Kolb, Oliver & Göttlich, Simone, 2015. "A continuous buffer allocation model using stochastic processes," European Journal of Operational Research, Elsevier, vol. 242(3), pages 865-874.
    9. Zhang, Ning & Qi, Faqun & Zhang, Chengjie & Zhou, Hongming, 2022. "Joint optimization of condition-based maintenance policy and buffer capacity for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    10. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha & Gershwin, Stanley B., 2017. "Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 61-72.
    11. Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
    12. Shi, Chuan & Gershwin, Stanley B., 2016. "Part sojourn time distribution in a two-machine line," European Journal of Operational Research, Elsevier, vol. 248(1), pages 146-158.
    13. Yifan Zhou & Chao Yuan & Tian Ran Lin & Lin Ma, 2021. "Maintenance policy structure investigation and optimisation of a complex production system with intermediate buffers," Journal of Risk and Reliability, , vol. 235(3), pages 458-473, June.
    14. Beixin Xia & Binghai Zhou & Ci Chen & Lifeng Xi, 2016. "A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 765-779, August.
    15. Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
    16. Alain Patchong & Thierry Lemoine & Gilles Kern, 2003. "Improving Car Body Production at PSA Peugeot Citroën," Interfaces, INFORMS, vol. 33(1), pages 36-49, February.
    17. Eva K. Lee & Siddhartha Maheshwary & Jacquelyn Mason & William Glisson, 2006. "Large-Scale Dispensing for Emergency Response to Bioterrorism and Infectious-Disease Outbreak," Interfaces, INFORMS, vol. 36(6), pages 591-607, December.
    18. Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
    19. Cigdem Gurgur, 2013. "Optimal configuration of a decentralized, market-driven production/inventory system," Annals of Operations Research, Springer, vol. 209(1), pages 139-157, October.
    20. Sorensen, Kenneth & Janssens, Gerrit K., 2001. "Buffer allocation and required availability in a transfer line with unreliable machines," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 163-173, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:231:y:2015:i:1:p:79-104:10.1007/s10479-012-1201-7. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.