IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v68y2000i3p287-306.html
   My bibliography  Save this article

Integration of assembly and fabrication for make-to-order production

Author

Listed:
  • Kolisch, R.

Abstract

No abstract is available for this item.

Suggested Citation

  • Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
  • Handle: RePEc:eee:proeco:v:68:y:2000:i:3:p:287-306
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(99)00011-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. A. Alan B. Pritsker & Lawrence J. Waiters & Philip M. Wolfe, 1969. "Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach," Management Science, INFORMS, vol. 16(1), pages 93-108, September.
    2. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    3. Boaz Ronen & Dan Trietsch, 1988. "A Decision Support System for Purchasing Management of Large Projects," Operations Research, INFORMS, vol. 36(6), pages 882-890, December.
    4. Cattrysse, Dirk & Maes, Johan & Van Wassenhove, Luk N., 1990. "Set partitioning and column generation heuristics for capacitated dynamic lotsizing," European Journal of Operational Research, Elsevier, vol. 46(1), pages 38-47, May.
    5. Gu[diaeresis]nther, H.O., 1987. "Planning lot sizes and capacity requirements in a single stage production system," European Journal of Operational Research, Elsevier, vol. 31(2), pages 223-231, August.
    6. Sprecher, Arno & Kolisch, Rainer & Drexl, Andreas, 1995. "Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 80(1), pages 94-102, January.
    7. יעקב צדקה, 1991. "משפחתונים לקשישים בטבריה," Working Papers 80, National Insurance Institute of Israel.
    8. BARANY, Imre & VAN ROY, Tony J. & WOLSEY, Laurence A., 1984. "Strong formulations for multi-item capacitated lot sizing," LIDAM Reprints CORE 590, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    9. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1986. "Heuristics for Multilevel Lot-Sizing with a Bottleneck," Management Science, INFORMS, vol. 32(8), pages 989-1006, August.
    10. Gary D. Eppen & R. Kipp Martin, 1987. "Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition," Operations Research, INFORMS, vol. 35(6), pages 832-848, December.
    11. Rainer Kolisch & Arno Sprecher & Andreas Drexl, 1995. "Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems," Management Science, INFORMS, vol. 41(10), pages 1693-1703, October.
    12. Kirca, Omer & Kokten, Melih, 1994. "A new heuristic approach for the multi-item dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 75(2), pages 332-341, June.
    13. Lee, Jae Kyu & Lee, Kyoung Jun & Park, Hung Kook & Hong, June Seok & Lee, Jung Seung, 1997. "Developing scheduling systems for Daewoo Shipbuilding: DAS project," European Journal of Operational Research, Elsevier, vol. 97(2), pages 380-395, March.
    14. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    15. Sprecher, Arno & Drexl, Andreas, 1998. "Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm," European Journal of Operational Research, Elsevier, vol. 107(2), pages 431-450, June.
    16. Imre Barany & Tony J. Van Roy & Laurence A. Wolsey, 1984. "Strong Formulations for Multi-Item Capacitated Lot Sizing," Management Science, INFORMS, vol. 30(10), pages 1255-1261, October.
    17. אסתר טולידנו, 1991. "מקבלי דמי אבטלה בשנת 1990," Working Papers 514, National Insurance Institute of Israel.
    18. Dauzere-Peres, Stephane & Lasserre, Jean-Bernard, 1994. "Integration of lotsizing and scheduling decisions in a job-shop," European Journal of Operational Research, Elsevier, vol. 75(2), pages 413-426, June.
    19. Horst Tempelmeier & Matthias Derstroff, 1996. "A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times," Management Science, INFORMS, vol. 42(5), pages 738-757, May.
    20. Tempelmeier, Horst & Helber, Stefan, 1994. "A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures," European Journal of Operational Research, Elsevier, vol. 75(2), pages 296-311, June.
    21. Unknown, 1986. "Letters," Choices: The Magazine of Food, Farm, and Resource Issues, Agricultural and Applied Economics Association, vol. 1(4), pages 1-9.
    22. Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
    23. דבי עובדיה, 1991. "קו חירום לנשים מוכות," Working Papers 203, National Insurance Institute of Israel.
    24. רבקה פריאור, 1991. "גמלאות נפגעי עבודה, 1989," Working Papers 496, National Insurance Institute of Israel.
    25. J. B. Lasserre, 1992. "An Integrated Model for Job-Shop Planning and Scheduling," Management Science, INFORMS, vol. 38(8), pages 1201-1211, August.
    26. אסתר טולידנו, 1994. "מקבלי דמי אבטלה בשנת 1993," Working Papers 439, National Insurance Institute of Israel.
    27. Donald Erlenkotter, 1990. "Ford Whitman Harris and the Economic Order Quantity Model," Operations Research, INFORMS, vol. 38(6), pages 937-946, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lee, Ik Sun & Sung, C.S., 2008. "Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed," European Journal of Operational Research, Elsevier, vol. 186(3), pages 931-952, May.
    2. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    3. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    4. Pamela C. Nolz, 2021. "Optimizing construction schedules and material deliveries in city logistics: a case study from the building industry," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 846-878, September.
    5. de Kruijff, Joost T. & Hurkens, Cor A.J. & de Kok, Ton G., 2018. "Integer programming models for mid-term production planning for high-tech low-volume supply chains," European Journal of Operational Research, Elsevier, vol. 269(3), pages 984-997.
    6. Schneeweiss, Christoph & Zimmer, Kirstin, 2004. "Hierarchical coordination mechanisms within the supply chain," European Journal of Operational Research, Elsevier, vol. 153(3), pages 687-703, March.
    7. Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
    8. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    9. Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
    10. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    2. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    3. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    4. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    5. Ozdamar, Linet & Birbil, Sevket Ilker, 1998. "Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions," European Journal of Operational Research, Elsevier, vol. 110(3), pages 525-547, November.
    6. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    7. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    8. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    9. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    10. Avkiran, Necmi K., 2001. "Investigating technical and scale efficiencies of Australian Universities through data envelopment analysis," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 57-80, March.
    11. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    12. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    13. Berden, Thijs P. J. & Brombacher, Aarnout C. & Sander, Peter C., 2000. "The building bricks of product quality: An overview of some basic concepts and principles," International Journal of Production Economics, Elsevier, vol. 67(1), pages 3-15, August.
    14. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
    15. Kavusturucu, Ayse & Gupta, Surendra M., 1999. "Manufacturing systems with machine vacations, arbitrary topology and finite buffers," International Journal of Production Economics, Elsevier, vol. 58(1), pages 1-15, January.
    16. Kangasharju, Aki & Nijkamp, Peter, 2001. "Innovation dynamics in space: local actors and local factors," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 31-56, March.
    17. Hempel, Paul S., 1996. "Human-resource-based models of production systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 239-249, June.
    18. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
    19. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    20. Bunn, Kevin A. & Ventura, José A., 2023. "A dynamic programming approach for the two-product capacitated lot-sizing problem with concave costs," European Journal of Operational Research, Elsevier, vol. 307(1), pages 116-129.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:68:y:2000:i:3:p:287-306. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.