A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sawik, Tadeusz, 1998. "A lexicographic approach to bi-objective loading of a flexible assembly system," European Journal of Operational Research, Elsevier, vol. 107(3), pages 656-668, June.
- Wallace J. Hopp & Seyed M. R. Iravani & Biying Shou, 2005. "Serial Agile Production Systems with Automation," Operations Research, INFORMS, vol. 53(5), pages 852-866, October.
- James R. Bradley & Bruce C. Arntzen, 1999. "The Simultaneous Planning of Production, Capacity, and Inventory in Seasonal Demand Environments," Operations Research, INFORMS, vol. 47(6), pages 795-806, December.
- Kolisch, Rainer, 2000. "Integration of assembly and fabrication for make-to-order production," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 335, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Robert C. Leachman & Robert F. Benson & Chihwei Liu & Dale J. Raar, 1996. "IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation—Semiconductor Sector," Interfaces, INFORMS, vol. 26(1), pages 6-37, February.
- Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
- Markland, R. E. & Darby-Dowman, K. H. & Minor, E. D., 1990. "Coordinated production scheduling for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 155-176, April.
- Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
- Neumann, K. & Zimmermann, J., 1999. "Resource levelling for projects with schedule-dependent time windows," European Journal of Operational Research, Elsevier, vol. 117(3), pages 591-605, September.
- Nicholas G. Hall & Marc E. Posner & Chris N. Potts, 1998. "Scheduling with Finite Capacity Output Buffers," Operations Research, INFORMS, vol. 46(3-supplem), pages 84-97, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Sawik, Tadeusz, 2014. "Joint supplier selection and scheduling of customer orders under disruption risks: Single vs. dual sourcing," Omega, Elsevier, vol. 43(C), pages 83-95.
- Son Duy Dao & Kazem Abhary & Romeo Marian, 2018. "An innovative model for resource scheduling in VCIM systems," Operational Research, Springer, vol. 18(1), pages 33-54, April.
- Angelo Aliano Filho & Antonio Carlos Moretti & Margarida Vaz Pato & Washington Alves Oliveira, 2021. "An exact scalarization method with multiple reference points for bi-objective integer linear optimization problems," Annals of Operations Research, Springer, vol. 296(1), pages 35-69, January.
- Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
- Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
- Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
- Schneeweiss, Christoph & Zimmer, Kirstin, 2004. "Hierarchical coordination mechanisms within the supply chain," European Journal of Operational Research, Elsevier, vol. 153(3), pages 687-703, March.
- de Kruijff, Joost T. & Hurkens, Cor A.J. & de Kok, Ton G., 2018. "Integer programming models for mid-term production planning for high-tech low-volume supply chains," European Journal of Operational Research, Elsevier, vol. 269(3), pages 984-997.
- Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
- Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
- Pamela C. Nolz, 2021. "Optimizing construction schedules and material deliveries in city logistics: a case study from the building industry," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 846-878, September.
- Lee, Ik Sun & Sung, C.S., 2008. "Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed," European Journal of Operational Research, Elsevier, vol. 186(3), pages 931-952, May.
- Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
- S Eom & E Kim, 2006. "A survey of decision support system applications (1995–2001)," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(11), pages 1264-1278, November.
- Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
- Hongbo Li & Linwen Zheng & Hanyu Zhu, 2023. "Resource leveling in projects with flexible structures," Annals of Operations Research, Springer, vol. 321(1), pages 311-342, February.
- Cappanera, Paola & Visintin, Filippo & Banditori, Carlo, 2014. "Comparing resource balancing criteria in master surgical scheduling: A combined optimisation-simulation approach," International Journal of Production Economics, Elsevier, vol. 158(C), pages 179-196.
- Kreter, Stefan & Schutt, Andreas & Stuckey, Peter J. & Zimmermann, Jürgen, 2018. "Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems," European Journal of Operational Research, Elsevier, vol. 266(2), pages 472-486.
- Singer, Marcos & Donoso, Patricio, 2008. "Empirical validation of an activity-based optimization system," International Journal of Production Economics, Elsevier, vol. 113(1), pages 335-345, May.
- Marta Gomes & Luís Cavique & Isabel Themido, 2006. "The crew timetabling problem: An extension of the crew scheduling problem," Annals of Operations Research, Springer, vol. 144(1), pages 111-132, April.
- Rainer Kolisch & Christian Heimerl, 2012. "An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(2), pages 111-127, March.
- Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
- Karel H. van Donselaar & Vishal Gaur & Tom van Woensel & Rob A. C. M. Broekmeulen & Jan C. Fransoo, 2010. "Ordering Behavior in Retail Stores and Implications for Automated Replenishment," Management Science, INFORMS, vol. 56(5), pages 766-784, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:180:y:2007:i:3:p:1060-1075. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.