IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v120y2009i2p437-451.html
   My bibliography  Save this article

Coordinated supply chain scheduling

Author

Listed:
  • Sawik, Tadeusz

Abstract

A mixed integer programming approach is proposed for a long-term, integrated scheduling of material manufacturing, material supply and product assembly in a customer driven supply chain. The supply chain consists of three distinct stages: manufacturer/supplier of product-specific materials (parts), producer where finished products are assembled according to customer orders and a set of customers who generate final demand for the products. The manufacturing stage consists of identical production lines in parallel and the producer stage is a flexible assembly line. The overall problem is how to coordinate manufacturing and supply of parts and assembly of products such that the total supply chain inventory holding cost and the production line start-up and parts shipping costs are minimized. A monolithic approach, where the manufacturing, supply and assembly schedules are determined simultaneously, is compared with a hierarchical approach. Numerical examples modeled after a real-world integrated scheduling in a customer driven supply chain in the electronics industry are presented and some computational results are reported.

Suggested Citation

  • Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
  • Handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:437-451
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00019-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. van der Vaart, Taco & van Donk, Dirk Pieter, 2008. "A critical review of survey-based research in supply chain integration," International Journal of Production Economics, Elsevier, vol. 111(1), pages 42-55, January.
    2. Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
    3. Grubbstrom, Robert W. & Wang, Zhiping, 2003. "A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 483-494, January.
    4. Chauhan, Satyaveer S. & Gordon, Valery & Proth, Jean-Marie, 2007. "Scheduling in supply chain environment," European Journal of Operational Research, Elsevier, vol. 183(3), pages 961-970, December.
    5. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    6. Kolisch, Rainer, 2000. "Integration of assembly and fabrication for make-to-order production," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 335, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    7. Schneeweiss, Christoph & Zimmer, Kirstin, 2004. "Hierarchical coordination mechanisms within the supply chain," European Journal of Operational Research, Elsevier, vol. 153(3), pages 687-703, March.
    8. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    9. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    10. Liao, Zhiying & Rittscher, Jens, 2007. "Integration of supplier selection, procurement lot sizing and carrier selection under dynamic demand conditions," International Journal of Production Economics, Elsevier, vol. 107(2), pages 502-510, June.
    11. Valentini, Giovanni & Zavanella, Lucio, 2003. "The consignment stock of inventories: industrial case and performance analysis," International Journal of Production Economics, Elsevier, vol. 81(1), pages 215-224, January.
    12. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    13. Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
    14. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    15. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    16. Goyal, S. K. & Deshmukh, S. G., 1992. "Integrated procurement-production systems: A review," European Journal of Operational Research, Elsevier, vol. 62(1), pages 1-10, October.
    17. Arshinder & Kanda, Arun & Deshmukh, S.G., 2008. "Supply chain coordination: Perspectives, empirical studies and research directions," International Journal of Production Economics, Elsevier, vol. 115(2), pages 316-335, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. B.‐Y. Cheng & J.Y.‐T. Leung & K. Li & S.‐L. Yang, 2015. "Single batch machine scheduling with deliveries," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(6), pages 470-482, September.
    2. Wang, Gang & Gunasekaran, Angappa & Ngai, Eric W.T. & Papadopoulos, Thanos, 2016. "Big data analytics in logistics and supply chain management: Certain investigations for research and applications," International Journal of Production Economics, Elsevier, vol. 176(C), pages 98-110.
    3. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
    4. Wolfgang Albrecht & Martin Steinrücke, 2020. "Continuous-time scheduling of production, distribution and sales in photovoltaic supply chains with declining prices," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 629-667, September.
    5. F. Tao & Y. Cheng & L. Zhang & A. Y. C. Nee, 2017. "Advanced manufacturing systems: socialization characteristics and trends," Journal of Intelligent Manufacturing, Springer, vol. 28(5), pages 1079-1094, June.
    6. Behl, Abhishek & Gaur, Jighyasu & Pereira, Vijay & Yadav, Rambalak & Laker, Benjamin, 2022. "Role of big data analytics capabilities to improve sustainable competitive advantage of MSME service firms during COVID-19 – A multi-theoretical approach," Journal of Business Research, Elsevier, vol. 148(C), pages 378-389.
    7. Wang, Gang & Lei, Lei, 2012. "Polynomial-time solvable cases of the capacitated multi-echelon shipping network scheduling problem with delivery deadlines," International Journal of Production Economics, Elsevier, vol. 137(2), pages 263-271.
    8. Woo, Hong Seng & Saghiri, Soroosh, 2011. "Order assignment considering buyer, third-party logistics provider, and suppliers," International Journal of Production Economics, Elsevier, vol. 130(2), pages 144-152, April.
    9. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
    10. Yeung, Wing-Kwan & Choi, Tsan-Ming & Cheng, T.C.E., 2011. "Supply chain scheduling and coordination with dual delivery modes and inventory storage cost," International Journal of Production Economics, Elsevier, vol. 132(2), pages 223-229, August.
    11. Tülin İnkaya & Mehmet Akansel, 2017. "Coordinated scheduling of the transfer lots in an assembly-type supply chain: a genetic algorithm approach," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 1005-1015, April.
    12. Cheng, Ba-Yi & Leung, Joseph Y-T. & Li, Kai, 2017. "Integrated scheduling on a batch machine to minimize production, inventory and distribution costs," European Journal of Operational Research, Elsevier, vol. 258(1), pages 104-112.
    13. Jordi Pereira & Mariona Vilà, 2016. "A new model for supply chain network design with integrated assembly line balancing decisions," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2653-2669, May.
    14. Rapine, Christophe & Penz, Bernard & Gicquel, Céline & Akbalik, Ayse, 2018. "Capacity acquisition for the single-item lot sizing problem under energy constraints," Omega, Elsevier, vol. 81(C), pages 112-122.
    15. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    16. Sancak, Emre & Salman, F. Sibel, 2011. "Multi-item dynamic lot-sizing with delayed transportation policy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 595-603, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    2. Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
    3. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    4. Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
    5. Tülin İnkaya & Mehmet Akansel, 2017. "Coordinated scheduling of the transfer lots in an assembly-type supply chain: a genetic algorithm approach," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 1005-1015, April.
    6. Acar, Yavuz & Atadeniz, Sukran Nilvana, 2015. "Comparison of integrated and local planning approaches for the supply network of a globally-dispersed enterprise," International Journal of Production Economics, Elsevier, vol. 167(C), pages 204-219.
    7. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang, 2014. "Coordination of production and interstage batch delivery with outsourced distribution," European Journal of Operational Research, Elsevier, vol. 238(1), pages 130-142.
    8. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    9. Esaignani Selvarajah & Rui Zhang, 2014. "Supply chain scheduling to minimize holding costs with outsourcing," Annals of Operations Research, Springer, vol. 217(1), pages 479-490, June.
    10. B.‐Y. Cheng & J.Y.‐T. Leung & K. Li & S.‐L. Yang, 2015. "Single batch machine scheduling with deliveries," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(6), pages 470-482, September.
    11. Averbakh, Igor, 2010. "On-line integrated production-distribution scheduling problems with capacitated deliveries," European Journal of Operational Research, Elsevier, vol. 200(2), pages 377-384, January.
    12. Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
    13. Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.
    14. Xiuli Wang & T. C. Edwin Cheng, 2007. "Machine scheduling with an availability constraint and job delivery coordination," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 11-20, February.
    15. Sawik, Tadeusz, 2014. "Joint supplier selection and scheduling of customer orders under disruption risks: Single vs. dual sourcing," Omega, Elsevier, vol. 43(C), pages 83-95.
    16. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    17. Jang, Wooseung & Kim, Daeki & Park, Kwangtae, 2013. "Inventory allocation and shipping when demand temporarily exceeds production capacity," European Journal of Operational Research, Elsevier, vol. 227(3), pages 464-470.
    18. Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
    19. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    20. Wang, Xiuli & Cheng, T.C.E., 2009. "Logistics scheduling to minimize inventory and transport costs," International Journal of Production Economics, Elsevier, vol. 121(1), pages 266-273, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:437-451. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.