Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design

Author

Listed:
  • Liang Tang

    (College of Transportation Engineering, Dalian Maritime University)

  • Zhihong Jin

    (College of Transportation Engineering, Dalian Maritime University)

  • Xuwei Qin

    (Northeastern University)

  • Ke Jing

    (Dalian Maritime University)

Abstract

In collaborative manufacturing, the supply chain scheduling problem becomes more complex according to both multiple product demands and multiple production modes. Aiming to obtain a reasonable solution to this complexity, we analyze the characteristics of collaborative manufacturing and design some elements, including production parameters, order parameters, and network parameters. We propose four general types of collaborative manufacturing networks and then construct a supply chain scheduling model composed of the processing costs, inventory costs, and two penalty costs of the early completion costs and tardiness costs. In our model, by considering the urgency of different orders, we design a delivery time window based on the least production time and slack time. Additionally, due to the merit of continuously processing orders belonging to the same product type, we design a production cost function by using a piecewise function. To solve our model efficiently, we present a hybrid ant colony optimization (HACO) algorithm. More specifically, the Monte Carlo algorithm is incorporated into our HACO algorithm to improve the solution quality. We also design a moving window award mechanism and dynamic pheromone update strategy to improve the search efficiency and solution performance. Computational tests are conducted to evaluate the performance of the proposed method.

Suggested Citation

  • Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
  • Handle: RePEc:spr:annopr:v:275:y:2019:i:2:d:10.1007_s10479-018-2976-y
    DOI: 10.1007/s10479-018-2976-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-018-2976-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-018-2976-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang, 2014. "Coordination of production and interstage batch delivery with outsourced distribution," European Journal of Operational Research, Elsevier, vol. 238(1), pages 130-142.
    2. Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
    3. Sawik, Tadeusz, 2014. "Joint supplier selection and scheduling of customer orders under disruption risks: Single vs. dual sourcing," Omega, Elsevier, vol. 43(C), pages 83-95.
    4. Shen, Liji & Dauzère-Pérès, Stéphane & Neufeld, Janis S., 2018. "Solving the flexible job shop scheduling problem with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 265(2), pages 503-516.
    5. Yeung, Wing-Kwan & Choi, Tsan-Ming & Cheng, T.C.E., 2011. "Supply chain scheduling and coordination with dual delivery modes and inventory storage cost," International Journal of Production Economics, Elsevier, vol. 132(2), pages 223-229, August.
    6. Thiruvady, Dhananjay & Singh, Gaurav & Ernst, Andreas T. & Meyer, Bernd, 2013. "Constraint-based ACO for a shared resource constrained scheduling problem," International Journal of Production Economics, Elsevier, vol. 141(1), pages 230-242.
    7. Mor, Baruch & Mosheiov, Gur, 2010. "Scheduling problems with two competing agents to minimize minmax and minsum earliness measures," European Journal of Operational Research, Elsevier, vol. 206(3), pages 540-546, November.
    8. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    9. Huang, Rong-Hwa & Yang, Chang-Lin & Cheng, Wei-Che, 2013. "Flexible job shop scheduling with due window—a two-pheromone ant colony approach," International Journal of Production Economics, Elsevier, vol. 141(2), pages 685-697.
    10. Rossi, Andrea, 2014. "Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships," International Journal of Production Economics, Elsevier, vol. 153(C), pages 253-267.
    11. Kolisch, Rainer & Heß, K., 2000. "Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 7010, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    12. Tolga Aydinliyim & George L. Vairaktarakis, 2010. "Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(2), pages 236-255, January.
    13. Kolisch, Rainer, 2000. "Integration of assembly and fabrication for make-to-order production," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 335, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    14. Allesandro Agnetis & Pitu B. Mirchandani & Dario Pacciarelli & Andrea Pacifici, 2004. "Scheduling Problems with Two Competing Agents," Operations Research, INFORMS, vol. 52(2), pages 229-242, April.
    15. Zhang, Rui & Song, Shiji & Wu, Cheng, 2013. "A hybrid artificial bee colony algorithm for the job shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 141(1), pages 167-178.
    16. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    17. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    18. Wang, Du-Juan & Yin, Yunqiang & Xu, Jianyou & Wu, Wen-Hsiang & Cheng, Shuenn-Ren & Wu, Chin-Chia, 2015. "Some due date determination scheduling problems with two agents on a single machine," International Journal of Production Economics, Elsevier, vol. 168(C), pages 81-90.
    19. Xu, Rui & Chen, Huaping & Li, Xueping, 2013. "A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 371-386.
    20. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    21. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    22. Averbakh, Igor, 2010. "On-line integrated production-distribution scheduling problems with capacitated deliveries," European Journal of Operational Research, Elsevier, vol. 200(2), pages 377-384, January.
    23. Selvarajah, Esaignani & Zhang, Rui, 2014. "Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 117-124.
    24. Sawik, Tadeusz, 2002. "Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line," European Journal of Operational Research, Elsevier, vol. 143(1), pages 115-124, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sabrina Backs & Hermann Jahnke & Lars Lüpke & Mareike Stücken & Christian Stummer, 2021. "Traditional versus fast fashion supply chains in the apparel industry: an agent-based simulation approach," Annals of Operations Research, Springer, vol. 305(1), pages 487-512, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    2. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    3. B.‐Y. Cheng & J.Y.‐T. Leung & K. Li & S.‐L. Yang, 2015. "Single batch machine scheduling with deliveries," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(6), pages 470-482, September.
    4. Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
    5. Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
    6. Ali Gharaei & Fariborz Jolai, 2021. "A Pareto approach for the multi-factory supply chain scheduling and distribution problem," Operational Research, Springer, vol. 21(4), pages 2333-2364, December.
    7. Cheng, Ba-Yi & Leung, Joseph Y-T. & Li, Kai, 2017. "Integrated scheduling on a batch machine to minimize production, inventory and distribution costs," European Journal of Operational Research, Elsevier, vol. 258(1), pages 104-112.
    8. Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
    9. Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
    10. Xin Feng & Yongxi Cheng & Feifeng Zheng & Yinfeng Xu, 2016. "Online integrated production–distribution scheduling problems without preemption," Journal of Combinatorial Optimization, Springer, vol. 31(4), pages 1569-1585, May.
    11. Liu, Weihua & Wang, Qian & Mao, Qiaomei & Wang, Shuqing & Zhu, Donglei, 2015. "A scheduling model of logistics service supply chain based on the mass customization service and uncertainty of FLSP’s operation time," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 83(C), pages 189-215.
    12. Zeynep Ceylan & Hakan Tozan & Serol Bulkan, 2021. "A coordinated scheduling problem for the supply chain in a flexible job shop machine environment," Operational Research, Springer, vol. 21(2), pages 875-900, June.
    13. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    14. Sun, X.T. & Chung, S.H. & Chan, Felix T.S., 2015. "Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 79(C), pages 110-127.
    15. Benjamin C. Shelbourne & Maria Battarra & Chris N. Potts, 2017. "The Vehicle Routing Problem with Release and Due Dates," INFORMS Journal on Computing, INFORMS, vol. 29(4), pages 705-723, November.
    16. Nicholas G. Hall & Zhixin Liu, 2010. "Capacity Allocation and Scheduling in Supply Chains," Operations Research, INFORMS, vol. 58(6), pages 1711-1725, December.
    17. Lixin Tang & Feng Li & Jiyin Liu, 2015. "Integrated scheduling of loading and transportation with tractors and semitrailers separated," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 416-433, August.
    18. Qi, Xiangtong, 2011. "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Elsevier, vol. 129(1), pages 43-50, January.
    19. Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
    20. Cheng, Shuenn-Ren, 2014. "Some new problems on two-agent scheduling to minimize the earliness costs," International Journal of Production Economics, Elsevier, vol. 156(C), pages 24-30.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:275:y:2019:i:2:d:10.1007_s10479-018-2976-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.