IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v36y1988i6p882-890.html
   My bibliography  Save this article

A Decision Support System for Purchasing Management of Large Projects

Author

Listed:
  • Boaz Ronen

    (Tel Aviv University, Tel Aviv, Israel)

  • Dan Trietsch

    (Naval Postgraduate School, Monterey, California)

Abstract

This paper describes a model based Decision Support System (DSS) for purchasing materials and components for large projects. The DSS may be used under two scenarios. Under the first scenario, we have a project to execute, and we are looking for a good way to manage the purchasing to minimize the expected costs. The decisions under our control are when and from whom to order each item. Under the other scenario, we are bidding for the project, and wish to assess the costs associated with the purchasing decisions which we should consider before making our bid. In both cases, we take into account expected out of pocket costs as well as lateness and/or expediting penalties. The DSS is designed to help choose the best supplier for each item and schedule the placement of the orders—decisions which are very difficult to make well without such a model based DSS.

Suggested Citation

  • Boaz Ronen & Dan Trietsch, 1988. "A Decision Support System for Purchasing Management of Large Projects," Operations Research, INFORMS, vol. 36(6), pages 882-890, December.
  • Handle: RePEc:inm:oropre:v:36:y:1988:i:6:p:882-890
    DOI: 10.1287/opre.36.6.882
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.36.6.882
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.36.6.882?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hsu, C.-H. & Wang, Fu-Kwun & Tzeng, Gwo-Hshiung, 2012. "The best vendor selection for conducting the recycled material based on a hybrid MCDM model combining DANP with VIKOR," Resources, Conservation & Recycling, Elsevier, vol. 66(C), pages 95-111.
    2. Joseph G. Davis & Eswaran Subrahmanian & Arthur W. Westerberg, 1999. "SCOPE: a blackboard model‐based decision support system for crude‐oil trading," Intelligent Systems in Accounting, Finance and Management, John Wiley & Sons, Ltd., vol. 8(2), pages 89-104, June.
    3. B. De Reyck & Y. Grushka-Cockayne & R. Leus, 2007. "A New Challenge in Project Scheduling. The Incorporation of Activity Failures," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(3), pages 410-435.
    4. Degraeve, Zeger & Labro, Eva & Roodhooft, Filip, 2000. "An evaluation of vendor selection models from a total cost of ownership perspective," European Journal of Operational Research, Elsevier, vol. 125(1), pages 34-58, August.
    5. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    6. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    7. Yuangao Chen & Shuo Wang & Jianrong Yao & Yixiao Li & Shuiqing Yang, 2018. "Socially responsible supplier selection and sustainable supply chain development: A combined approach of total interpretive structural modeling and fuzzy analytic network process," Business Strategy and the Environment, Wiley Blackwell, vol. 27(8), pages 1708-1719, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:36:y:1988:i:6:p:882-890. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.