Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
November 2006, Volume 104, Issue 1
- 62-73 Uncertainty and global sensitivity analysis in the evaluation of investment projects
by Borgonovo, E. & Peccati, L.
- 74-84 Generic POLCA--A production and materials flow control mechanism for quick response manufacturing
by Fernandes, Nuno Octavio & do Carmo-Silva, Silvio
- 85-99 District's manufacturing performances: A comparison among large, small-to-medium-sized and district enterprises
by Grando, Alberto & Belvedere, Valeria
- 100-112 Strategic venture partner selection for collaborative innovation in production systems: A decision support system-based approach
by Hacklin, Fredrik & Marxt, Christian & Fahrni, Fritz
- 113-124 Quantification in manufacturing strategy: A methodology and illustration
by Hallgren, Mattias & Olhager, Jan
- 125-142 Grouping machines for effective workload control
by Henrich, Peter & Land, Martin & Gaalman, Gerard
- 143-153 A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies
by Herron, Colin & Braiden, Paul M.
- 154-163 Dispatching rules for production scheduling in the capital goods industry
by Hicks, Christian & Pongcharoen, Pupong
- 164-178 Specifications and supplier development in the UK electrical transmission and distribution equipment industry
by McGovern, Tom & Hicks, Christian
- 179-190 An intelligent decision support system for manufacturing technology investments
by Hua Tan, Kim & Peng Lim, Chee & Platts, Ken & Shen Koay, Hooi
- 191-200 Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items
by Kampf, M. & Kochel, P.
- 201-213 Investment decision-making in supplier networks: Management of risk
by Ojala, Mika & Hallikas, Jukka
- 214-229 An empirical investigation on the relationship between business and maintenance strategies
by Pinjala, Srinivas Kumar & Pintelon, Liliane & Vereecke, Ann
- 230-248 A framework and tool for supply network strategy operationalisation
by Yee, C.L. & Platts, K.W.
October 2006, Volume 103, Issue 2
- 451-488 Perspectives in supply chain risk management
by Tang, Christopher S.
- 489-508 Economic analysis of paper recycling vis-a-vis wood as raw material
by Pati, Rupesh Kumar & Vrat, Prem & Kumar, Pradeep
- 509-526 The comparative productivity efficiency for global telecoms
by Tsai, Hsiang-Chih & Chen, Chun-Mei & Tzeng, Gwo-Hshiung
- 527-534 Optimal ordering policy in a distribution system
by Li, Jing-An & Wu, Yue & Lai, Kin Keung & Liu, Ke
- 535-550 The effects of manufacturing control strategies on the cash conversion cycle in manufacturing systems
by Ozbayrak, M. & Akgun, M.
- 551-564 A case-injected genetic algorithm for single machine scheduling problems with release time
by Chang, Pei-Chann & Hsieh, Jih-Chang & Liu, Chen-Hao
- 565-571 Process capability monitoring chart with an application in the silicon-filler manufacturing process
by Chen, K.S. & Yu, K.T. & Sheu, S.H.
- 572-584 Two-machine flowshop scheduling to minimize mean flow time under linear deterioration
by Wu, Chin-Chia & Lee, Wen-Chiung
- 585-599 Strategic management of logistics service: A fuzzy QFD approach
by Bottani, Eleonora & Rizzi, Antonio
- 600-609 Balancing of parallel assembly lines
by Gokcen, Hadi & Agpak, Kursad & Benzer, Recep
- 610-615 Productivity outcomes of teamwork as an effect of information technology and team size
by Tohidi, Hamid & Tarokh, Mohammad Jafar
- 616-632 Evaluation of the conversion from central storage to decentralized storages in cellular manufacturing environments using activity-based costing
by Satoglu, Sule Itir & Durmusoglu, M. Bulent & Dogan, Ibrahim
- 633-647 Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times
by Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer
- 648-655 The optimal frozen period in a dynamic production model
by Lian, Zhaotong & Deshmukh, Abhijit & Wang, Jin
- 656-666 On the validity of aggregate models in designing supply chain contracts
by Kremer, Mirko & Schneeweiss, Christoph & Zimmermann, Michael
- 667-679 Managing the trade-off implications of global supply
by Stratton, Roy & Warburton, Roger D.H.
- 680-693 A comparative analysis of storage and retrieval equipment at a container terminal
by Vis, Iris F.A.
- 694-706 International sourcing: Empirical evidence from a sample of Italian firms
by Nassimbeni, Guido
- 707-714 Optimal order policy for deteriorating items with inflation induced demand
by Jaggi, Chandra K. & Aggarwal, K.K. & Goel, S.K.
- 715-725 Cyclic production-inventory planning and control in the pre-Deco industry: A case study
by Ashayeri, J. & Heuts, R.J.M. & Lansdaal, H.G.L. & Strijbosch, L.W.G.
- 726-741 A hybrid approach to the valuation of RFID/MEMS technology applied to ordnance inventory
by Doerr, Kenneth H. & Gates, William R. & Mutty, John E.
- 742-754 An empirical comparison of Tabu Search, Simulated Annealing, and Genetic Algorithms for facilities location problems
by Arostegui, Marvin Jr. & Kadipasaoglu, Sukran N. & Khumawala, Basheer M.
- 755-766 A supplier allocation model considering delivery failure, maintenance and supplier cycle costs
by Ruiz-Torres, Alex J. & Mahmoodi, Farzad
- 767-783 A comprehensive mathematical model for the design of cellular manufacturing systems
by Defersha, Fantahun M. & Chen, Mingyuan
- 784-797 A variant of the Hungarian inventory control model
by Noyan, Nilay & Prekopa, Andras
- 798-809 A master scheduling model with skilled and unskilled temporary workers
by Techawiboonwong, Atthawit & Yenradee, Pisal & Das, Sanchoy K.
- 810-825 Generating Pareto schedules with outsource and internal parallel resources
by Ruiz-Torres, Alex J. & Ho, Johnny C. & Lopez, Francisco J.
- 826-840 Carrier-mode logistics optimization of inbound supply chains for electronics manufacturing
by Cochran, Jeffery K. & Ramanujam, Balaji
- 841-862 A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems
by Yavuz, Mesut & Tufekci, Suleyman
- 863-872 Productivity of production labor, non-production labor, and capital: An international study
by Wacker, John G. & Yang, Chen-Lung & Sheu, Chwen
- 873-881 A new approach for buffer allocation in unreliable production lines
by Nahas, Nabil & Ait-Kadi, Daoud & Nourelfath, Mustapha
- 882-891 Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms
by Damodaran, Purushothaman & Kumar Manjeshwar, Praveen & Srihari, Krishnaswami
- 892-892 A note on: Optimal ordering policies in response to a discount offer
by Goyal, S.K.
- 893-894 Erratum to: "Incorporating transport cost in the lot size and pricing decisions with downward sloping demand": [International Journal of Production Economics 95, 297-305]
by Abad, P.L. & Aggarwal, Vijay
- 895-895 Erratum to "Optimal ordering policies in response to discount offer" [International Journal of Production Economics 100 (2006) 195-211]
by Sarker, Bhaba R. & Al Kindi, Mahmood
- 896-896 Erratum to: "Lot size effects on process lead time, lead time demand, and safety stock": [International Journal of Production Economics 100 (2006) 1-9]
by Vaughan, T.S.
September 2006, Volume 103, Issue 1
- 3-9 Rotational allocation of tasks to multifunctional workers in a service industry
by Corominas, Albert & Pastor, Rafael & Rodriguez, Ericka
- 10-16 Little's Law in a continuous setting
by Jodlbauer, Herbert & Stocher, Wolfgang
- 17-35 Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering
by H'mida, Fehmi & Martin, Patrick & Vernadat, Francois
- 36-47 On the stock control performance of intermittent demand estimators
by Syntetos, Aris A. & Boylan, John E.
- 48-63 Temporal technical and profit efficiency measurement: Definitions, duality and aggregation results
by Briec, Walter & Comes, Christine & Kerstens, Kristiaan
- 64-86 Financial risk management in the planning of refinery operations
by Pongsakdi, Arkadej & Rangsunvigit, Pramoch & Siemanond, Kitipat & Bagajewicz, Miguel J.
- 87-89 A note on "a hybrid genetic algorithm for the dynamic plant layout problem"
by Balakrishnan, Jaydeep & Cheng, Chun Hung
- 90-103 Integrated project evaluation and selection using multiple-attribute decision-making technique
by Dey, Prasanta Kumar
- 104-116 Two-echelon supply chain models: Considering duopolistic retailers' different competitive behaviors
by Yang, Shan-Lin & Zhou, Yong-Wu
- 117-130 Optimization-based decision support for order promising in supply chain networks
by Venkatadri, Uday & Srinivasan, Ashok & Montreuil, Benoit & Saraswat, Ashish
- 131-148 Implementation of Deming's style of quality management: An action research study in a plastics company
by Hales, Douglas N. & Chakravorty, Satya S.
- 149-165 So many factors, so little time...Simulation experiments in the frequency domain
by Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J.
- 166-184 Disruption management for machine scheduling: The case of SPT schedules
by Qi, Xiangtong & Bard, Jonathan F. & Yu, Gang
- 185-198 Mixed-variable fuzzy clustering approach to part family and machine cell formation for GT applications
by Yang, Miin-Shen & Hung, Wen-Liang & Cheng, Fu-Chou
- 199-208 Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system
by Kim, Taebok & Hong, Yushin & Chang, Soo Young
- 209-229 Integrating direct and indirect sales channels under decentralized decision-making
by Seifert, Ralf W. & Thonemann, Ulrich W. & Sieke, Marcel A.
- 230-245 An algorithm for minimizing weighted earliness penalty in assembly job shops
by Pathumnakul, Supachai & Egbelu, Pius J.
- 246-251 On optimal payment time for a retailer under permitted delay of payment by the wholesaler
by Song, Xiping & Cai, Xiaoqiang
- 252-270 Activity-based costing as a method for assessing the economics of modularization--A case study and beyond
by Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian
- 271-285 Models for production planning under uncertainty: A review
by Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C.
- 286-307 Product development practices and performance: A structural equation modeling-based multi-group analysis
by Koufteros, Xenophon & Marcoulides, George A.
- 308-315 Equipment management strategy under machine capacity loss
by Sheu, D. Daniel & Lin, Jeff
- 316-331 Synchronization in common cycle lot size scheduling for a multi-product serial supply chain
by Hoque, M.A. & Kingsman, B.G.
- 332-346 A DSS approach to managing customer enquiries for SMEs at the customer enquiry stage
by Xiong, M.H. & Tor, S.B. & Bhatnagar, Rohit & Khoo, L.P. & Venkat, S.
- 347-361 A coordination mechanism for a supply chain with demand information updating
by Chen, Haoya & Chen, Jian & Chen, Youhua (Frank)
- 362-370 Two-warehouse partial backlogging inventory models for deteriorating items under inflation
by Yang, Hui-Ling
- 371-385 Raw material release time control for complex make-to-order products with stochastic processing times
by Song, Dong-Ping
- 386-400 Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
by Allahverdi, Ali
- 401-419 Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments
by Jeunet, Jully
- 420-437 The impact of information sharing and forecasting in capacitated industrial supply chains: A case study
by Byrne, P.J. & Heavey, Cathal
- 438-448 Industry evidence of enhanced production stability since 1984
by Bivin, David G.
- 449-450 Note on: Concurrent pricing and lot sizing for make-to-order contract production
by Cardenas-Barron, Leopoldo Eduardo
August 2006, Volume 102, Issue 2
- 183-198 Time-phased creation of hybrid manufacturing systems
by Ioannou, George
- 199-216 Uncapacitated production and location planning models with demand fulfillment flexibility
by Merzifonluoglu, Yasemin & Geunes, Joseph
- 217-225 A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer
by Hoque, Mohammad A. & Goyal, Suresh K.
- 226-243 A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
by Gamberini, Rita & Grassi, Andrea & Rimini, Bianca
- 244-254 Cost evaluation of a two-echelon inventory system with lost sales and approximately Poisson demand
by Seifbarghy, Mehdi & Jokar, Mohammad Reza Akbari
- 255-264 Decentralized inventory control in a two-component assembly system
by Chu, Hongsheng & Wang, Jingchun & Jin, Yihui & Suo, Hansheng
- 265-288 A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
by Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung
- 289-301 A fuzzy approach for supplier evaluation and selection in supply chain management
by Chen, Chen-Tung & Lin, Ching-Torng & Huang, Sue-Fn
- 302-316 Joint economic lot size in distribution system with multiple shipment policy
by Siajadi, Hans & Ibrahim, Raafat N. & Lochert, Paul B.
- 317-332 A flow-network approach for equilibrium of material requirements planning
by Yenisey, Mehmet Mutlu
- 333-343 Response surface analysis of a multi-product batch processing facility using a simulation metamodel
by Noguera, Jose H. & Watson, Edward F.
- 344-357 A Lagrangean relaxation algorithm for multi-item lot-sizing problems with joint piecewise linear resource costs
by Rizk, Nafee & Martel, Alain & Ramudhin, Amar
- 358-378 Designing logistics networks in divergent process industries: A methodology and its application to the lumber industry
by Vila, Didier & Martel, Alain & Beauregard, Robert
- 379-392 An examination of the impact of coordinating supply chain policies and price markdowns on short lifecycle product retail performance
by Nair, Anand & Closs, David J.
July 2006, Volume 102, Issue 1
- 1-21 A group genetic algorithm for the machine cell formation problem
by Vila Goncalves Filho, Eduardo & Jose Tiberti, Alexandre
- 22-36 Cost characterizations of supply chain delivery performance
by Guiffrida, Alfred L. & Nagi, Rakesh
- 37-50 A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand
by Xie, Ying & Petrovic, Dobrila & Burnham, Keith
- 51-65 Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph
by Li, Jing Rong & Khoo, Li Pheng & Tor, Shu Beng
- 66-86 Sequence-dependent group scheduling problems in flexible flow shops
by Logendran, Rasaratnam & deSzoeke, Paula & Barnard, Faith
- 87-94 Single item optimal lot sizing under continuous unit cost decrease
by Khouja, Moutaz & Goyal, Suresh
- 95-107 Determination of price and warranty length for a normal lifetime distributed product
by Wu, Chin-Chun & Lin, Pei-Chun & Chou, Chao-Yu
- 108-131 Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
by Ding, Fong-Yuen & Zhu, Jin & Sun, Hui
- 132-142 Scheduling of multi-buyer joint replenishments
by Chan, Chi Kin & Yuk-on Li, Leon & To Ng, Chi & Kin-sion Cheung, Bernard & Langevin, Andre
- 143-148 Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost
by Li, Wenhua & Yuan, Jinjiang
- 149-166 Time-bounds for production networks
by Gibson, Glenn A. & Alawneh, John Y.
- 167-180 EOQ, JIT and fixed costs in the ready-mixed concrete industry
by Min, Wu & Sui Pheng, Low
June 2006, Volume 101, Issue 2
- 213-229 Time-based manufacturing improves business performance--results from a survey
by Nahm, Abraham Y. & Vonderembse, Mark A. & Subba Rao, S. & Ragu-Nathan, T.S.
- 230-245 Welfare maximization, pricing, and allocation with a product performance or environmental quality standard: Illustration for the gasoline and additives market
by Gallagher, Paul W. & Shapouri, Hosein & Price, Jeffrey
- 246-258 Overtime vs. regular shift planning decisions in packing shops
by Lagodimos, A.G. & Mihiotis, A.N.
- 259-272 An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops
by Gajpal, Yuvraj & Rajendran, Chandrasekharan
- 273-285 A fuzzy programming approach for vendor selection problem in a supply chain
by Kumar, Manoj & Vrat, Prem & Shankar, Ravi
- 286-297 Cumulative count of conforming chart with variable sampling intervals
by Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H.
- 298-311 The importance of assumptions in investment evaluation
by Borgonovo, E. & Peccati, L.
- 312-328 Meta-heuristics from nature for the loop layout design problem
by Nearchou, Andreas C.
- 329-352 Similarity coefficient methods applied to the cell formation problem: A taxonomy and review
by Yin, Yong & Yasuda, Kazuhiko
- 353-368 Agility evaluation using fuzzy logic
by Lin, Ching-Torng & Chiu, Hero & Tseng, Yi-Hong
- 369-384 An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging
by Wu, Kun-Shan & Ouyang, Liang-Yuh & Yang, Chih-Te
May 2006, Volume 101, Issue 1
- 1-1 Integrated enterprise and supply chain management
by O'Brien, Christopher & Tang, Ou
- 2-18 On bullwhip in supply chains--historical review, present practice and expected future impact
by Geary, S. & Disney, S.M. & Towill, D.R.
- 19-29 A heuristic job-shop scheduling algorithm to minimize the total holding cost of completed and in-process products subject to no tardy jobs
by Ohta, Hiroshi & Nakatani, Toshihiro
- 30-52 Supply contract with bidirectional options: The buyer's perspective
by Wang, Qunzhi & Tsao, De-bi
- 53-62 Multi-level, multi-stage capacity-constrained production-inventory systems in discrete time with non-zero lead times using MRP theory
by Grubbstrom, Robert W. & Thu Thuy Huynh, Thi
- 63-88 Coordinating the resource investment decision for a two-market, price-setting firm
by Bish, Ebru K. & Hong, Seong J.
- 89-98 Supply chain coordination with quantity discount policy
by Li, Jianli & Liu, Liwen
- 99-108 A multiple attribute utility theory approach to lean and green supply chain management
by Kainuma, Yasutaka & Tawara, Nobuhiko
- 109-127 Managing uncertainty in ERP-controlled manufacturing environments in SMEs
by Koh, S.C. Lenny & Saad, Sameh M.
- 128-139 Modeling of B2B mobile commerce processes
by Stender, Michael & Ritz, Thomas
- 140-149 Scenario-based planning for lot-sizing and scheduling with uncertain processing times
by Beraldi, Patrizia & Ghiani, Gianpaolo & Guerriero, Emanuela & Grieco, Antonio
- 150-158 Chaotic behavior in manufacturing systems
by Alfaro, Miguel D. & Sepulveda, Juan M.
- 159-171 A framework for group decision support systems: An application in the evaluation of information technology for logistics firms
by Kengpol, Athakorn & Tuominen, Markku
- 172-184 Controllable, observable and stable state space representations of a generalized order-up-to policy
by Lalwani, Chandra S. & Disney, Stephen M. & Towill, Denis R.
- 185-193 Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times
by Chen, Chen-Tung & Huang, Sue-Fen
- 194-208 On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains
by Disney, Stephen M. & Towill, Denis R. & Warburton, Roger D.H.
April 2006, Volume 100, Issue 2
- 183-194 Supplier coalitions in on-line reverse auctions: Validity requirements and profit distribution scheme
by Jin, Mingzhou & Wu, S. David
- 195-211 Optimal ordering policies in response to a discount offer
by Sarker, Bhaba R. & Al Kindi, Mahmood
- 212-222 Vendor performance with supply risk: A chance-constrained DEA approach
by Talluri, Srinivas & Narasimhan, Ram & Nair, Anand
- 223-238 Designing supply chains: Towards theory development
by Vonderembse, Mark A. & Uppal, Mohit & Huang, Samuel H. & Dismukes, John P.
- 239-252 Setting operating policies for supply hubs
by Shah, Janat & Goh, Mark
- 253-267 User-oriented design for the optimal combination on product design
by Lai, Hsin-Hsi & Lin, Yang-Cheng & Yeh, Chung-Hsing & Wei, Chien-Hung
- 268-284 Impact of demand uncertainty on supply chain cooperation of single-period products
by Hua, Zhongsheng & Li, Sijie & Liang, Liang
- 285-299 Agility index in the supply chain
by Lin, Ching-Torng & Chiu, Hero & Chu, Po-Young
- 300-313 A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility--a case study
by Nazzal, Dima & Mollaghasemi, Mansooreh & Anderson, Dave
- 314-321 A comparison of product costing practices in discrete-part and assembly manufacturing and continuous production process manufacturing
by Brierley, John A. & Cowton, Christopher J. & Drury, Colin
- 322-334 Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
by Jin, Zhihong & Yang, Zan & Ito, Takahiro
- 335-347 Inventory of differential items selling from two shops under a single management with periodically increasing demand over a finite time-horizon
by Dey, Jayanta Kumar & Kar, Samarjit & Kumar Bhuina, Ashok & Maiti, Manoranjan
- 348-359 Applying fuzzy linguistic quantifier to select supply chain partners at different phases of product life cycle
by Chang, Sheng-Lin & Wang, Reay-Chen & Wang, Shih-Yuan
March 2006, Volume 100, Issue 1
- 1-9 Lot size effects on process lead time, lead time demand, and safety stock
by Vaughan, Timothy S.
- 10-29 MCDM in a fuzzy setting: Investment projects assessment application
by Dimova, L. & Sevastianov, P. & Sevastianov, D.
- 30-43 Order-planning model and algorithm for manufacturing steel sheets
by Liu, Shixin & Tang, Jiafu & Song, Jianhai
- 44-58 Sequencing precedence-related jobs on two machines to minimize the weighted completion time
by Ramachandra, Girish & Elmaghraby, Salah E.
- 59-64 EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus
by Sphicas, Georghios P.
- 65-75 Multi-attribute responsive dispatching strategies for automated guided vehicles
by Bilge, Umit & Esenduran, Gokce & Varol, Nebibe & Ozturk, Zeynep & AydIn, Burcu & Alp, Aysun
- 76-86 Analysis of an inventory system with exponential partial backordering
by San José, L.A. & Sicilia, J. & Garcia-Laguna, J.
- 87-100 Operation management in reconfigurable manufacturing systems: Reconfiguration for error handling
by Bruccoleri, Manfredi & Pasek, Zbigniew J. & Koren, Yoram
- 101-115 An approximate periodic model for fixed-life perishable products in a two-echelon inventory-distribution system
by Kanchanasuntorn, Kanchana & Techanitisawad, Anulark
- 116-130 The optimal ordering policy in a DCF analysis for deteriorating items when trade credit depends on the order quantity
by Chung, Kun-Jen & Liao, Jui-Jung
- 131-147 University library benchmarking: An international comparison using DEA
by Reichmann, Gerhard & Sommersguter-Reichmann, Margit
- 148-154 Economic ordering quantity models for items with imperfect quality
by Papachristos, S. & Konstantaras, I.
- 155-167 Modeling decision making and control in manufacturing simulation
by van der Zee, D.J.
- 168-179 New exact method to solve the Pm/rj/[summation operator]Cj schedule problem
by Yalaoui, F. & Chu, C.
February 2006, Volume 99, Issue 1-2
- 1-3 Control and management of productive systems
by Artiba, Abdelhakim & Gourgand, Michel
- 4-15 Flow shop scheduling problem with limited machine availability: A heuristic approach
by Aggoune, Riad & Portmann, Marie-Claude
- 16-27 Scheduling of a two-machine flowshop with availability constraints on the first machine
by Allaoui, H. & Artiba, A. & Elmaghraby, S.E. & Riane, F.
- 28-40 A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
by Framinan, Jose M. & Leisten, Rainer
- 41-51 Stochastic algorithms: Using the worst to reach the best
by Baptiste, Pierre
- 52-62 Operating rooms scheduling
by Jebali, AIda & Hadj Alouane, Atidel B. & Ladet, Pierre
- 63-73 A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
by Nait Tahar, Djamel & Yalaoui, Farouk & Chu, Chengbin & Amodeo, Lionel
- 74-87 Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
by SubaI, Corinne & Baptiste, Pierre & Niel, Eric
- 88-101 Throughput maximization in serial production lines with worksharing
by Chen, Jiaqiong & Askin, Ronald G.
- 102-116 Dynamic card controlling in a Conwip system
by Framinan, Jose M. & Gonzalez, Pedro L. & Ruiz-Usano, Rafael
- 117-130 Comparison of negotiation protocols in dynamic agent-based manufacturing systems
by Reaidy, Jihad & Massotte, Pierre & Diep, Daniel
- 131-143 Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level
by Chelbi, Anis & Rezg, Nidhal
- 144-155 Optimal design of work-in-process buffers
by Faria, Jose & Matos, Manuel & Nunes, Eusebio
- 156-176 Urban traffic systems modelling methodology
by Chabrol, Michelle & Sarramia, David & Tchernev, Nikolay
- 177-185 A sequential heuristic procedure for the two-dimensional cutting-stock problem
by Suliman, S.M.A.
- 186-201 Value and risk assessment of supply chain management improvement projects
by Brun, Alessandro & Caridi, Maria & Fahmy Salama, Kamal & Ravelli, Ivan
- 202-221 An investigation into the use of ERP systems in the service sector
by Botta-Genoulaz, Valerie & Millet, Pierre-Alain
- 222-235 Scalable enterprise systems: Quality management issues
by Temponi, Cecilia
- 236-246 Adaptive control charts: A Markovian approach for processes subject to independent disturbances
by De Magalhaes, Maysa S. & B. Costa, Antonio F. & Moura Neto, Francisco D.
December 2005, Volume 98, Issue 3
- 273-289 Flexibility of manufacturing systems, strategic change and performance
by Llorens, F. Javier & Molina, Luis M. & Verdu, Antonio J.
- 290-300 Optimal inventory policy with noninstantaneous receipt under trade credit
by Ouyang, Liang-Yuh & Teng, Jinn-Tsair & Chuang, Kai-Wayne & Chuang, Bor-Ren
- 301-314 The role of elasticity in supply chain performance
by Hull, Bradley
- 315-327 Suppliers capability and price analysis chart
by Chen, K.L. & Chen, K.S. & Li, R.K.
- 328-341 Applying possibilistic linear programming to aggregate production planning
by Wang, Reay-Chen & Liang, Tien-Fu
November 2005, Volume 98, Issue 2
- 113-113 Foreword
by Ceroni, Jose A. & Nof, Shimon Y.
- 114-128 Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem
by Anussornnitisarn, Pornthep & Nof, Shimon Y. & Etzion, Opher
- 129-135 Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate
by Hop, Nguyen Van & Tabucanon, Mario T.
- 136-142 An integrated distribution routing model in multi-supply center system
by Hwang, Heung-Suk
- 143-149 Costing RAM design and test analysis model for production facility
by Hwang, Heung-Suk
- 150-161 A distributed dispatching method for the brokerage of truckload freights
by Kim, Kap Hwan & Jun Chung, Woo & Hwang, Hark & Seong Ko, Chang
- 162-171 An analysis of the end-of-aisle order picking system: Multi-aisle served by a single order picker
by Koh, Shie-Gheun & Kwon, Hyuck-Moo & Kim, Young-Jin
- 172-178 Optimal design of rack structure with modular cell in AS/RS
by Lee, Young Hae & Hwan Lee, Moon & Hur, Sun
- 179-188 Architectures, methods and tools for enterprise engineering
by Mertins, K. & Jochem, R.
- 189-203 Achievement assessment for enterprise resource planning (ERP) system implementations based on critical success factors (CSFs)
by Sun, Albert Y.T. & Yazdani, Abe & Overend, John D.
- 204-214 A heuristic algorithm for a multi-product dynamic lot-sizing and shipping problem
by Lee, Woon-Seek & Han, Jong-Han & Cho, Sung-Jin
- 215-226 Economic statistical process control for multivariate quality characteristics under Weibull shock model
by Yang, S.F. & Rahim, M.A.