IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v102y2006i2p317-332.html
   My bibliography  Save this article

A flow-network approach for equilibrium of material requirements planning

Author

Listed:
  • Yenisey, Mehmet Mutlu

Abstract

No abstract is available for this item.

Suggested Citation

  • Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
  • Handle: RePEc:eee:proeco:v:102:y:2006:i:2:p:317-332
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(05)00082-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chu, Sydney C. K., 1995. "A mathematical programming approach towards optimized master production scheduling," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 269-279, March.
    2. Grubbstrom, Robert W. & Wang, Zhiping, 2003. "A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 483-494, January.
    3. van Donselaar, K. H. & Gubbels, B. J., 2002. "How to release orders in order to minimise system inventory and system nervousness?," International Journal of Production Economics, Elsevier, vol. 78(3), pages 335-343, August.
    4. Gayialis, Sotiris P. & Tatsiopoulos, Ilias P., 2004. "Design of an IT-driven decision support system for vehicle routing and scheduling," European Journal of Operational Research, Elsevier, vol. 152(2), pages 382-398, January.
    5. McBride, Richard D., 1985. "Solving embedded generalized network problems," European Journal of Operational Research, Elsevier, vol. 21(1), pages 82-92, July.
    6. Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
    7. Plenert, Gerhard, 1999. "Focusing material requirements planning (MRP) towards performance," European Journal of Operational Research, Elsevier, vol. 119(1), pages 91-99, November.
    8. Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.
    9. Ali, Agha Iqbal & Kennington, Jeff & Shetty, Bala, 1988. "The equal flow problem," European Journal of Operational Research, Elsevier, vol. 36(1), pages 107-115, July.
    10. Jorjani, S & Lamar, BW, 1994. "Cash flow management network models with quantity discounting," Omega, Elsevier, vol. 22(2), pages 149-155, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
    2. Mohebbi, E. & Choobineh, F. & Pattanayak, A., 2007. "Capacity-driven vs. demand-driven material procurement systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 451-466, June.
    3. Kraft, Edwin R., 2002. "Scheduling railway freight delivery appointments using a bid price approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(2), pages 145-165, February.
    4. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    5. Michal Košíček & Radek Tesař & František Dařena & Roman Malo & Arnošt Motyčka, 2012. "Route planning module as a part of Supply Chain Management system," Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis, Mendel University Press, vol. 60(2), pages 135-142.
    6. Lee, L. H. & Chew, E. P. & Ng, T. S., 2005. "Production planning with approved vendor matrices for a hard-disk drive manufacturer," European Journal of Operational Research, Elsevier, vol. 162(2), pages 310-324, April.
    7. Steven A. Gabriel & Supat Kiet & Jifang Zhuang, 2005. "A Mixed Complementarity-Based Equilibrium Model of Natural Gas Markets," Operations Research, INFORMS, vol. 53(5), pages 799-818, October.
    8. Antonio G. Martín & Manuel Díaz-Madroñero & Josefa Mula, 2020. "Master production schedule using robust optimization approaches in an automobile second-tier supplier," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(1), pages 143-166, March.
    9. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
    10. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    11. Partanen, Jari & Haapasalo, Harri, 2004. "Fast production for order fulfillment: Implementing mass customization in electronics industry," International Journal of Production Economics, Elsevier, vol. 90(2), pages 213-222, July.
    12. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    13. ÇalIskan, Cenk, 2011. "A specialized network simplex algorithm for the constrained maximum flow problem," European Journal of Operational Research, Elsevier, vol. 210(2), pages 137-147, April.
    14. M. A. Venkataramana & John J. Dinkel & John Mote, 1991. "Vector processing approach to constrained network problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(1), pages 71-85, February.
    15. Garg, Manish & Smith, J. Cole, 2008. "Models and algorithms for the design of survivable multicommodity flow networks with general failure scenarios," Omega, Elsevier, vol. 36(6), pages 1057-1071, December.
    16. M. Shourian & S. Mousavi & A. Tahershamsi, 2008. "Basin-wide Water Resources Planning by Integrating PSO Algorithm and MODSIM," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 22(10), pages 1347-1366, October.
    17. Fontes, Dalila B.M.M. & Hadjiconstantinou, Eleni & Christofides, Nicos, 2006. "A dynamic programming approach for solving single-source uncapacitated concave minimum cost network flow problems," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1205-1219, October.
    18. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    19. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1997. "Stochastic network project scheduling with non-consumable limited resources," International Journal of Production Economics, Elsevier, vol. 48(1), pages 29-37, January.
    20. Ng, T.S. & Lee, L.H. & Chew, E.P., 2006. "Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1117-1140, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:102:y:2006:i:2:p:317-332. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.