IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v122y2009i2p639-655.html
   My bibliography  Save this article

Critical material planning for TFT-LCD production industry

Author

Listed:
  • Lin, James T.
  • Chen, Tzu-Li
  • Lin, Yen-Ting

Abstract

This research focuses on the material planning problem in the thin-film transistor liquid crystal display (TFT-LCD) manufacturing industry. With the growth in TFT-LCD display applications, TFT-LCD manufacturing has become the new high-technology industry after semiconductor manufacturing. The final process of the TFT-LCD industry, the module process, is a material-oriented assembly production system that fabricates the panels produced from the preceding process and critical materials such as integrated circuit (IC), printed circuit board (PCB), and backlight (BL) into customized TFT-LCD products according to different customer requirements. In addition, there are many specific characteristics such as alternative bill of material (ABOM), customer preference for ABOM, and purchase quantity ratio occurring in the TFT-LCD industry. However, because of the uniqueness of the TFT-LCD industry, material planning called critical material planning (CMP) must use a feasible and optimal purchase plan under these specific characteristics and constraints; also, the traditional material requirement planning (MRP) mechanism is no longer enough to deal with its planning problems. In response to this challenge, the current paper formulates a single-period and multi-period CMP problem as nonlinear programming models represented by the network graph. The purpose of this is to optimize the purchase quantity from suppliers while satisfying demand under the existence of specific characteristics. Additionally, we illustrate a numerical example from a real TFT-LCD manufacturer to clarify the multi-period CMP model; the managerial implications of the customer preference factors and the purchase quantity ratio are also correspondingly discussed.

Suggested Citation

  • Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
  • Handle: RePEc:eee:proeco:v:122:y:2009:i:2:p:639-655
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00219-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
    2. Murthy, D.N.P. & Ma, L., 1991. "MRP with uncertainty: a review and some extensions," International Journal of Production Economics, Elsevier, vol. 25(1-3), pages 51-64.
    3. Shin-Lian Lo & Fu-Kwun Wang & James T. Lin, 2008. "Forecasting for the LCD monitor market," Journal of Forecasting, John Wiley & Sons, Ltd., vol. 27(4), pages 341-356.
    4. Mohebbi, E. & Choobineh, F. & Pattanayak, A., 2007. "Capacity-driven vs. demand-driven material procurement systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 451-466, June.
    5. Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
    6. Bertrand, J. W. M. & Zuijderwijk, M. & Hegge, H. M. H., 2000. "Using hierarchical pseudo bills of material for customer order acceptance and optimal material replenishment in assemble to order manufacturing of non-modular products," International Journal of Production Economics, Elsevier, vol. 66(2), pages 171-184, June.
    7. Segerstedt, Anders, 1996. "Formulas of MRP," International Journal of Production Economics, Elsevier, vol. 46(1), pages 127-136, December.
    8. Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
    9. Plenert, Gerhard, 1999. "Focusing material requirements planning (MRP) towards performance," European Journal of Operational Research, Elsevier, vol. 119(1), pages 91-99, November.
    10. Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.
    11. Peter Lyon & R. John Milne & Robert Orzell & Robert Rice, 2001. "Matching Assets with Demand in Supply-Chain Management at IBM Microelectronics," Interfaces, INFORMS, vol. 31(1), pages 108-124, February.
    12. Enns, S. T., 2002. "MRP performance effects due to forecast bias and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 138(1), pages 87-102, April.
    13. van Donselaar, K. & van den Nieuwenhof, J. & Visschers, J., 2000. "The impact of material coordination concepts on planning stability in supply chains," International Journal of Production Economics, Elsevier, vol. 68(2), pages 169-176, November.
    14. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    15. Casimir, Rommert J., 1999. "Lot-bucket MRP," International Journal of Production Economics, Elsevier, vol. 58(2), pages 173-181, January.
    16. Robert C. Leachman & Robert F. Benson & Chihwei Liu & Dale J. Raar, 1996. "IMPReSS: An Automated Production-Planning and Delivery-Quotation System at Harris Corporation—Semiconductor Sector," Interfaces, INFORMS, vol. 26(1), pages 6-37, February.
    17. van Donselaar, K. H. & Gubbels, B. J., 2002. "How to release orders in order to minimise system inventory and system nervousness?," International Journal of Production Economics, Elsevier, vol. 78(3), pages 335-343, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chou, Jui-Sheng & Tai, Yian & Chang, Lian-Ji, 2010. "Predicting the development cost of TFT-LCD manufacturing equipment with artificial intelligence models," International Journal of Production Economics, Elsevier, vol. 128(1), pages 339-350, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mohebbi, E. & Choobineh, F. & Pattanayak, A., 2007. "Capacity-driven vs. demand-driven material procurement systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 451-466, June.
    2. Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
    3. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    4. Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
    5. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    6. Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
    7. Alfred Degbotse & Brian T. Denton & Kenneth Fordyce & R. John Milne & Robert Orzell & Chi-Tai Wang, 2013. "IBM Blends Heuristics and Optimization to Plan Its Semiconductor Supply Chain," Interfaces, INFORMS, vol. 43(2), pages 130-141, April.
    8. Raphael Herding & Lars Mönch, 2024. "A rolling horizon planning approach for short-term demand supply matching," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 32(3), pages 865-896, September.
    9. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    10. Manuel Díaz-Madroñero & Josefa Mula & Mariano Jiménez & David Peidro, 2017. "A rolling horizon approach for material requirement planning under fuzzy lead times," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2197-2211, April.
    11. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
    12. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    13. Habibi, M.K. Khakim & Battaïa, Olga & Cung, Van-Dat & Dolgui, Alexandre, 2017. "Collection-disassembly problem in reverse supply chain," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 334-344.
    14. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    15. Borodin, Valeria & Dolgui, Alexandre & Hnaien, Faicel & Labadie, Nacima, 2016. "Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 79-86.
    16. Mehmet Talha Dulman & Surendra M. Gupta, 2018. "Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops," Logistics, MDPI, vol. 2(1), pages 1-22, January.
    17. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    18. Metzker Soares, Paula & Thevenin, Simon & Adulyasak, Yossiri & Dolgui, Alexandre, 2024. "Adaptive robust optimization for lot-sizing under yield uncertainty," European Journal of Operational Research, Elsevier, vol. 313(2), pages 513-526.
    19. Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
    20. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:122:y:2009:i:2:p:639-655. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.