IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v105y2007i1p243-262.html
   My bibliography  Save this article

Reliability consideration in the design and analysis of cellular manufacturing systems

Author

Listed:
  • Das, K.
  • Lashkari, R.S.
  • Sengupta, S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Das, K. & Lashkari, R.S. & Sengupta, S., 2007. "Reliability consideration in the design and analysis of cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 105(1), pages 243-262, January.
  • Handle: RePEc:eee:proeco:v:105:y:2007:i:1:p:243-262
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(06)00113-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Logendran, Rasaratnam & Talkington, Diane, 1997. "Analysis of cellular and functional manufacturing systems in the presence of machine breakdown," International Journal of Production Economics, Elsevier, vol. 53(3), pages 239-256, December.
    2. John S. Morris & Richard J. Tersine, 1990. "A Simulation Analysis of Factors Influencing the Attractiveness of Group Technology Cellular Layouts," Management Science, INFORMS, vol. 36(12), pages 1567-1578, December.
    3. Diallo, Mohamadou & Pierreval, Henri & Quilliot, Alain, 2001. "Manufacturing cells design with flexible routing capability in presence of unreliable machines," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 175-182, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Paulo Figueroa-Torrez & Orlando Durán & Broderick Crawford & Felipe Cisternas-Caneo, 2023. "A Binary Black Widow Optimization Algorithm for Addressing the Cell Formation Problem Involving Alternative Routes and Machine Reliability," Mathematics, MDPI, vol. 11(16), pages 1-23, August.
    2. Angra, Surjit & Sehgal, Rakesh & Samsudeen Noori, Z., 2008. "Cellular manufacturing--A time-based analysis to the layout problem," International Journal of Production Economics, Elsevier, vol. 112(1), pages 427-438, March.
    3. Lin, Yi-Kuei, 2010. "System reliability of a stochastic-flow network through two minimal paths under time threshold," International Journal of Production Economics, Elsevier, vol. 124(2), pages 382-387, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. N Safaei & R Tavakkoli-Moghaddam & F Sassani, 2009. "A series—parallel redundant reliability system for cellular manufacturing design," Journal of Risk and Reliability, , vol. 223(3), pages 233-250, September.
    2. Hassan, Mohsen M. D., 1995. "Layout design in group technology manufacturing," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 173-188, March.
    3. D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan, 2000. "Production variability and shop configuration: An experimental analysis," International Journal of Production Economics, Elsevier, vol. 68(1), pages 43-57, October.
    4. Plaquin, Marie-France & Pierreval, Henri, 2000. "Cell formation using evolutionary algorithms with certain constraints," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 267-278, March.
    5. Kannan, V. R. & Ghosh, S., 1995. "Using dynamic cellular manufacturing to simplify scheduling in cell based production systems," Omega, Elsevier, vol. 23(4), pages 443-452, August.
    6. Balakrishnan, Jaydeep & Cheng, Chun Hung, 2007. "Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions," European Journal of Operational Research, Elsevier, vol. 177(1), pages 281-309, February.
    7. Garavelli, A. Claudio, 2001. "Performance analysis of a batch production system with limited flexibility," International Journal of Production Economics, Elsevier, vol. 69(1), pages 39-48, January.
    8. Logendran, Rasaratnam & Talkington, Diane, 1997. "Analysis of cellular and functional manufacturing systems in the presence of machine breakdown," International Journal of Production Economics, Elsevier, vol. 53(3), pages 239-256, December.
    9. Tharanga Rajapakshe & Milind Dawande & Chelliah Sriskandarajah, 2011. "Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 440-454, April.
    10. Agarwal, Atul, 2008. "Partitioning bottleneck work center for cellular manufacturing: An integrated performance and cost model," International Journal of Production Economics, Elsevier, vol. 111(2), pages 635-647, February.
    11. Lee, Shine-Der & Chiang, Chih-Ping, 2002. "Cell formations in the uni-directional loop material handling environment," European Journal of Operational Research, Elsevier, vol. 137(2), pages 401-420, March.
    12. Jing, Hao & Sheng, Lijuan & Luo, Chaorui & Kwak, Choonjong, 2021. "Statistical analysis of family based dispatching rules and preemption," International Journal of Production Economics, Elsevier, vol. 240(C).
    13. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
    14. Tsarouhas, Panagiotis H., 2009. "Classification and calculation of primary failure modes in bread production line," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 551-557.
    15. Shambu, Girish & Suresh, Nallan C., 2000. "Performance of hybrid cellular manufacturing systems: A computer simulation investigation," European Journal of Operational Research, Elsevier, vol. 120(2), pages 436-458, January.
    16. Jensen, John B., 2000. "The impact of resource flexibility and staffing decisions on cellular and departmental shop performance," European Journal of Operational Research, Elsevier, vol. 127(2), pages 279-296, December.
    17. Albino, Vito & Claudio Garavelli, A., 1999. "Limited flexibility in cellular manufacturing systems: A simulation study," International Journal of Production Economics, Elsevier, vol. 60(1), pages 447-455, April.
    18. Shafer, S. M. & Meredith, J. R. & Marsh, R. F., 1995. "A taxonomy for alternative equipment groupings in batch environments," Omega, Elsevier, vol. 23(4), pages 361-376, August.
    19. Shanker, Ravi & Vrat, Prem, 1998. "Post design modeling for cellular manufacturing system with cost uncertainty," International Journal of Production Economics, Elsevier, vol. 55(1), pages 97-109, June.
    20. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:105:y:2007:i:1:p:243-262. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.