IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v105y2007i1p204-212.html
   My bibliography  Save this article

Leadtime reduction in a (Q,r) inventory system: An agency perspective

Author

Listed:
  • Lee, Jun-Yeon
  • Schwarz, Leroy B.

Abstract

No abstract is available for this item.

Suggested Citation

  • Lee, Jun-Yeon & Schwarz, Leroy B., 2007. "Leadtime reduction in a (Q,r) inventory system: An agency perspective," International Journal of Production Economics, Elsevier, vol. 105(1), pages 204-212, January.
  • Handle: RePEc:eee:proeco:v:105:y:2007:i:1:p:204-212
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(06)00108-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Charles J. Corbett & Deming Zhou & Christopher S. Tang, 2004. "Designing Supply Contracts: Contract Type and Information Asymmetry," Management Science, INFORMS, vol. 50(4), pages 550-559, April.
    2. Awi Federgruen & Yu-Sheng Zheng, 1992. "An Efficient Algorithm for Computing an Optimal (r, Q) Policy in Continuous Review Stochastic Inventory Systems," Operations Research, INFORMS, vol. 40(4), pages 808-813, August.
    3. Gerchak, Yigal & Parlar, Mahmut, 1991. "Investing in reducing lead-time randomness in continuous-review inventory models," Engineering Costs and Production Economics, Elsevier, vol. 21(2), pages 191-197, May.
    4. Kamran Moinzadeh & Steven Nahmias, 1988. "A Continuous Review Model for an Inventory System with Two Supply Modes," Management Science, INFORMS, vol. 34(6), pages 761-773, June.
    5. Guillermo Gallego, 1998. "New Bounds and Heuristics for (Q, r) Policies," Management Science, INFORMS, vol. 44(2), pages 219-233, February.
    6. John R. Grout & David P. Christy, 1999. "A Model of Supplier Responses to Just-In-Time Delivery Requirements," Group Decision and Negotiation, Springer, vol. 8(2), pages 139-156, March.
    7. Paul Zipkin, 1986. "Inventory Service-Level Measures: Convexity and Approximation," Management Science, INFORMS, vol. 32(8), pages 975-981, August.
    8. David P. Herron, 1967. "Inventory Management for Minimum Cost," Management Science, INFORMS, vol. 14(4), pages 219-235, December.
    9. van Beek, Paul & van Putten, Cornelis, 1987. "OR contributions to flexibility improvement in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 31(1), pages 52-60, July.
    10. Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal, 2000. "Continuous review inventory models where random lead time depends on lot size and reserved capacity," International Journal of Production Economics, Elsevier, vol. 68(3), pages 217-228, December.
    11. Erica L. Plambeck & Stefanos A. Zenios, 2000. "Performance-Based Incentives in a Dynamic Principal-Agent Model," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 240-263, April.
    12. M A Hariga, 2000. "Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(11), pages 1340-1345, November.
    13. Steven Nahmias & Shan Shan Wang, 1979. "A Heuristic Lot Size Reorder Point Model for Decaying Inventories," Management Science, INFORMS, vol. 25(1), pages 90-97, January.
    14. Evan L. Porteus & Seungjin Whang, 1991. "On Manufacturing/Marketing Incentives," Management Science, INFORMS, vol. 37(9), pages 1166-1181, September.
    15. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    16. Holmstrom, Bengt & Milgrom, Paul, 1987. "Aggregation and Linearity in the Provision of Intertemporal Incentives," Econometrica, Econometric Society, vol. 55(2), pages 303-328, March.
    17. Rajiv Lal & V. Srinivasan, 1993. "Compensation Plans for Single- and Multi-Product Salesforces: An Application of the Holmstrom-Milgrom Model," Management Science, INFORMS, vol. 39(7), pages 777-793, July.
    18. Johansen, Soren Glud & Thorstenson, Anders, 1998. "An inventory model with Poisson demands and emergency orders," International Journal of Production Economics, Elsevier, vol. 56(1), pages 275-289, September.
    19. Erica L. Plambeck & Stefanos A. Zenios, 2003. "Incentive Efficient Control of a Make-to-Stock Production System," Operations Research, INFORMS, vol. 51(3), pages 371-386, June.
    20. David E. Platt & Lawrence W. Robinson & Robert B. Freund, 1997. "Tractable (Q, R) Heuristic Models for Constrained Service Levels," Management Science, INFORMS, vol. 43(7), pages 951-965, July.
    21. Yu-Sheng Zheng, 1992. "On Properties of Stochastic Inventory Systems," Management Science, INFORMS, vol. 38(1), pages 87-103, January.
    22. Hill, Roger M. & Johansen, Soren Glud, 2006. "Optimal and near-optimal policies for lost sales inventory models with at most one replenishment order outstanding," European Journal of Operational Research, Elsevier, vol. 169(1), pages 111-132, February.
    23. Paknejad, M. Javad & Nasri, Farrokh & Affisco, John F., 1992. "Lead-time variability reduction in stochastic inventory models," European Journal of Operational Research, Elsevier, vol. 62(3), pages 311-322, November.
    24. Jan A. Van Mieghem, 1999. "Coordinating Investment, Production, and Subcontracting," Management Science, INFORMS, vol. 45(7), pages 954-971, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yang, Jian & Qi, Xiangtong, 2009. "On the design of coordinating contracts," International Journal of Production Economics, Elsevier, vol. 122(2), pages 581-594, December.
    2. Pu, Xujin & Zhang, Shiming & Ji, Bowen & Han, Guanghua, 2021. "Online channel strategies under different offline channel power structures," Journal of Retailing and Consumer Services, Elsevier, vol. 60(C).
    3. Wu, Zhengping & Zhai, Xin & Liu, Zhongyi, 2015. "The inventory billboard effect on the lead-time decision," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 45-53.
    4. Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
    5. Xiao, Tiaojun & Yang, Danqin, 2008. "Price and service competition of supply chains with risk-averse retailers under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 114(1), pages 187-200, July.
    6. Hariga, Moncer A., 2010. "A single-item continuous review inventory problem with space restriction," International Journal of Production Economics, Elsevier, vol. 128(1), pages 153-158, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vipul Agrawal & Sridhar Seshadri, 2000. "Distribution free bounds for service constrained (Q, r) inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(8), pages 635-656, December.
    2. Marcus Ang & Karl Sigman & Jing-Sheng Song & Hanqin Zhang, 2017. "Closed-Form Approximations for Optimal ( r , q ) and ( S , T ) Policies in a Parallel Processing Environment," Operations Research, INFORMS, vol. 65(5), pages 1414-1428, October.
    3. Hariga, Moncer A., 2010. "A single-item continuous review inventory problem with space restriction," International Journal of Production Economics, Elsevier, vol. 128(1), pages 153-158, November.
    4. Awi Federgruen & Min Wang, 2013. "Monotonicity properties of a class of stochastic inventory systems," Annals of Operations Research, Springer, vol. 208(1), pages 155-186, September.
    5. Tamer Boyacı & Guillermo Gallego, 2002. "Managing waiting times of backordered demands in single‐stage (Q, r) inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(6), pages 557-573, September.
    6. Halkos, George & Kevork, Ilias & Tziourtzioumis, Chris, 2014. "Optimal inventory policies with an exact cost function under large demand uncertainty," MPRA Paper 60545, University Library of Munich, Germany.
    7. Ang, Marcus & Song, Jing-Sheng & Wang, Mingzheng & Zhang, Hanqin, 2013. "On properties of discrete (r, q) and (s, T) inventory systems," European Journal of Operational Research, Elsevier, vol. 229(1), pages 95-105.
    8. Wang, Yulan & Zipkin, Paul, 2009. "Agents' incentives under buy-back contracts in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 120(2), pages 525-539, August.
    9. Johansen, Søren Glud & Thorstenson, Anders, 2014. "Emergency orders in the periodic-review inventory system with fixed ordering costs and compound Poisson demand," International Journal of Production Economics, Elsevier, vol. 157(C), pages 147-157.
    10. Erica L. Plambeck & Stefanos A. Zenios, 2003. "Incentive Efficient Control of a Make-to-Stock Production System," Operations Research, INFORMS, vol. 51(3), pages 371-386, June.
    11. Robert A. Shumsky & Edieal J. Pinker, 2003. "Gatekeepers and Referrals in Services," Management Science, INFORMS, vol. 49(7), pages 839-856, July.
    12. Tang, Shaolong & Wang, Wenjie & Cho, Stella & Yan, Hong, 2018. "Reducing emissions in transportation and inventory management: (R, Q) Policy with considerations of carbon reduction," European Journal of Operational Research, Elsevier, vol. 269(1), pages 327-340.
    13. Duran, Alfonso & Gutierrez, Gil & Zequeira, Romulo I., 2004. "A continuous review inventory model with order expediting," International Journal of Production Economics, Elsevier, vol. 87(2), pages 157-169, January.
    14. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    15. Jeon G. Kim & Daewon Sun & Xin James He & Jack C. Hayya, 2004. "The (s, Q) inventory model with Erlang lead time and deterministic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 906-923, September.
    16. Johansen, Søren Glud, 2019. "Emergency orders in the periodic-review inventory system with fixed ordering costs and stochastic lead times for normal orders," International Journal of Production Economics, Elsevier, vol. 209(C), pages 205-214.
    17. Sean X. Zhou & Chaolin Yang, 2016. "Continuous-Review ( R, nQ ) Policies for Inventory Systems with Dual Delivery Modes," Operations Research, INFORMS, vol. 64(6), pages 1302-1319, December.
    18. Fangruo Chen, 1999. "94%-Effective Policies for a Two-Stage Serial Inventory System with Stochastic Demand," Management Science, INFORMS, vol. 45(12), pages 1679-1696, December.
    19. Uday S. Rao, 2003. "Properties of the Periodic Review (R, T) Inventory Control Policy for Stationary, Stochastic Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 37-53, February.
    20. Hao Zhang & Mahesh Nagarajan & Greys Sošić, 2010. "Dynamic Supplier Contracts Under Asymmetric Inventory Information," Operations Research, INFORMS, vol. 58(5), pages 1380-1397, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:105:y:2007:i:1:p:204-212. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.