IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v51y2004i6p906-923.html
   My bibliography  Save this article

The (s, Q) inventory model with Erlang lead time and deterministic demand

Author

Listed:
  • Jeon G. Kim
  • Daewon Sun
  • Xin James He
  • Jack C. Hayya

Abstract

We develop a simple, approximately optimal solution to a model with Erlang lead time and deterministic demand. The method is robust to misspecification of the lead time and has good accuracy. We compare our approximate solution to the optimal for the case where we have prior information on the lead‐time distribution, and another where we have no information, except for computer‐generated sample data. It turns out that our solution is as easy as the EOQ's, with an accuracy rate of 99.41% when prior information on the lead‐time distribution is available and 97.54–99.09% when only computer‐generated sample information is available. Apart from supplying the inventory practitioner with an easy heuristic, we gain insights into the efficacy of stochastic lead time models and how these could be used to find the cost and a near‐optimal policy for the general model, where both demand rate and lead time are stochastic. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004

Suggested Citation

  • Jeon G. Kim & Daewon Sun & Xin James He & Jack C. Hayya, 2004. "The (s, Q) inventory model with Erlang lead time and deterministic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 906-923, September.
  • Handle: RePEc:wly:navres:v:51:y:2004:i:6:p:906-923
    DOI: 10.1002/nav.20032
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.20032
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.20032?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Xin X. He & Susan H. Xu & J. Keith Ord & Jack C. Hayya, 1998. "An Inventory Model with Order Crossover," Operations Research, INFORMS, vol. 46(3-supplem), pages 112-119, June.
    2. Ruud Heuts & Jan de Klein, 1995. "An (s, q) inventory model with stochastic and interrelated lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 839-859, August.
    3. Ranga V. Ramasesh & J. Keith Ord & Jack C. Hayya & Andrew Pan, 1991. "Sole Versus Dual Sourcing in Stochastic Lead-Time (s, Q) Inventory Models," Management Science, INFORMS, vol. 37(4), pages 428-443, April.
    4. Guillermo Gallego, 1998. "New Bounds and Heuristics for (Q, r) Policies," Management Science, INFORMS, vol. 44(2), pages 219-233, February.
    5. Georghios P. Sphicas & Farrokh Nasri, 1984. "An inventory model with finite‐range stochastic lead times," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 31(4), pages 609-616, December.
    6. Richard Ehrhardt, 1979. "The Power Approximation for Computing (s, S) Inventory Policies," Management Science, INFORMS, vol. 25(8), pages 777-786, August.
    7. Richard Ehrhardt & Charles Mosier, 1984. "A Revision of the Power Approximation for Computing (s, S) Policies," Management Science, INFORMS, vol. 30(5), pages 618-622, May.
    8. Yu-Sheng Zheng, 1992. "On Properties of Stochastic Inventory Systems," Management Science, INFORMS, vol. 38(1), pages 87-103, January.
    9. Georghios P. Sphicas, 1982. "Technical Note—On the Solution of an Inventory Model with Variable Lead Times," Operations Research, INFORMS, vol. 30(2), pages 404-410, April.
    10. Paknejad, M. Javad & Nasri, Farrokh & Affisco, John F., 1992. "Lead-time variability reduction in stochastic inventory models," European Journal of Operational Research, Elsevier, vol. 62(3), pages 311-322, November.
    11. Matthew J. Liberatore, 1979. "Technical Note—The EOQ Model under Stochastic Lead Time," Operations Research, INFORMS, vol. 27(2), pages 391-396, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Babai, M. Zied & Dai, Yong & Li, Qinyun & Syntetos, Aris & Wang, Xun, 2022. "Forecasting of lead-time demand variance: Implications for safety stock calculations," European Journal of Operational Research, Elsevier, vol. 296(3), pages 846-861.
    2. John P. Saldanha & Bradley S. Price & Douglas J. Thomas, 2023. "A nonparametric approach for setting safety stock levels," Production and Operations Management, Production and Operations Management Society, vol. 32(4), pages 1150-1168, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Thomas Wensing & Heinrich Kuhn, 2015. "Analysis of production and inventory systems when orders may cross over," Annals of Operations Research, Springer, vol. 231(1), pages 265-281, August.
    2. Kim, Taebok & Glock, Christoph H. & Kwon, Yongjang, 2014. "A closed-loop supply chain for deteriorating products under stochastic container return times," Omega, Elsevier, vol. 43(C), pages 30-40.
    3. Achin Srivastav & Sunil Agrawal, 2020. "On a single item single stage mixture inventory models with independent stochastic lead times," Operational Research, Springer, vol. 20(4), pages 2189-2227, December.
    4. Xin X. He & Susan H. Xu & J. Keith Ord & Jack C. Hayya, 1998. "An Inventory Model with Order Crossover," Operations Research, INFORMS, vol. 46(3-supplem), pages 112-119, June.
    5. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    6. Hayya, Jack C. & Bagchi, Uttarayan & Kim, Jeon G. & Sun, Daewon, 2008. "On static stochastic order crossover," International Journal of Production Economics, Elsevier, vol. 114(1), pages 404-413, July.
    7. Chatfield, Dean C. & Pritchard, Alan M., 2018. "Crossover aware base stock decisions for service-driven systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 312-330.
    8. Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
    9. Lee, Jun-Yeon & Schwarz, Leroy B., 2007. "Leadtime reduction in a (Q,r) inventory system: An agency perspective," International Journal of Production Economics, Elsevier, vol. 105(1), pages 204-212, January.
    10. Strijbosch, L.W.G. & Moors, J.J.A., 1999. "Simple Expressions for Safety Factors in Inventory Control," Discussion Paper 1999-112, Tilburg University, Center for Economic Research.
    11. Georgia Perakis & Guillaume Roels, 2008. "Regret in the Newsvendor Model with Partial Information," Operations Research, INFORMS, vol. 56(1), pages 188-203, February.
    12. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    13. Flip Klijn & Marco Slikker, 2004. "Distribution Center Consolidation Games," UFAE and IAE Working Papers 602.04, Unitat de Fonaments de l'Anàlisi Econòmica (UAB) and Institut d'Anàlisi Econòmica (CSIC).
    14. van Donselaar, Karel H. & Broekmeulen, Rob A.C.M., 2013. "Determination of safety stocks in a lost sales inventory system with periodic review, positive lead-time, lot-sizing and a target fill rate," International Journal of Production Economics, Elsevier, vol. 143(2), pages 440-448.
    15. Marcus Ang & Karl Sigman & Jing-Sheng Song & Hanqin Zhang, 2017. "Closed-Form Approximations for Optimal ( r , q ) and ( S , T ) Policies in a Parallel Processing Environment," Operations Research, INFORMS, vol. 65(5), pages 1414-1428, October.
    16. Kevin H. Shang & Jing-Sheng Song, 2007. "Serial Supply Chains with Economies of Scale: Bounds and Approximations," Operations Research, INFORMS, vol. 55(5), pages 843-853, October.
    17. Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
    18. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    19. Awi Federgruen & Min Wang, 2013. "Monotonicity properties of a class of stochastic inventory systems," Annals of Operations Research, Springer, vol. 208(1), pages 155-186, September.
    20. Roman Kapuscinski & Sridhar Tayur, 1999. "Variance vs. Standard Deviation: Variability Reduction Through Operations Reversal," Management Science, INFORMS, vol. 45(5), pages 765-767, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:51:y:2004:i:6:p:906-923. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.