Forecasting of lead-time demand variance: Implications for safety stock calculations
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2021.04.017
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hoque, M.A., 2013. "A vendor–buyer integrated production–inventory model with normal distribution of lead time," International Journal of Production Economics, Elsevier, vol. 144(2), pages 409-417.
- Johansen, Soren Glud, 2005. "Base-stock policies for the lost sales inventory system with Poisson demand and Erlangian lead times," International Journal of Production Economics, Elsevier, vol. 93(1), pages 429-437, January.
- Wang, Xun & Disney, Stephen M., 2017. "Mitigating variance amplification under stochastic lead-time: The proportional control approach," European Journal of Operational Research, Elsevier, vol. 256(1), pages 151-162.
- Hau L. Lee & Kut C. So & Christopher S. Tang, 2000. "The Value of Information Sharing in a Two-Level Supply Chain," Management Science, INFORMS, vol. 46(5), pages 626-643, May.
- Jeon G. Kim & Daewon Sun & Xin James He & Jack C. Hayya, 2004. "The (s, Q) inventory model with Erlang lead time and deterministic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(6), pages 906-923, September.
- Stephen C. Graves, 1999. "A Single-Item Inventory Model for a Nonstationary Demand Process," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 50-61.
- Prak, Dennis & Teunter, Ruud & Syntetos, Aris, 2017. "On the calculation of safety stocks when demand is forecasted," European Journal of Operational Research, Elsevier, vol. 256(2), pages 454-461.
- Everette S. Gardner, Jr., 1988. "A Simple Method of Computing Prediction Intervals for Time Series Forecasts," Management Science, INFORMS, vol. 34(4), pages 541-546, April.
- Syntetos, A.A. & Teunter, R.H. & Babai, M.Z. & Transchel, S., 2016. "On the benefits of delayed ordering," European Journal of Operational Research, Elsevier, vol. 248(3), pages 963-970.
- Johansen, Soren Glud & Thorstenson, Anders, 1993. "Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time," International Journal of Production Economics, Elsevier, vol. 30(1), pages 179-194, July.
- Boute, Robert N. & Disney, Stephen M. & Lambrecht, Marc R. & Houdt, Benny Van, 2014. "Coordinating lead times and safety stocks under autocorrelated demand," European Journal of Operational Research, Elsevier, vol. 232(1), pages 52-63.
- Bretschneider, Stuart, 1986. "Estimating forecast variance with exponential smoothing Some new results," International Journal of Forecasting, Elsevier, vol. 2(3), pages 349-355.
- Robert N. Boute & Marc R. Lambrecht & Benny Van Houdt, 2007. "Performance evaluation of a production/inventory system with periodic review and endogenous lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 462-473, June.
- Hasni, M. & Aguir, M.S. & Babai, M.Z. & Jemai, Z., 2019. "On the performance of adjusted bootstrapping methods for intermittent demand forecasting," International Journal of Production Economics, Elsevier, vol. 216(C), pages 145-153.
- Ali, Mohammad M. & Boylan, John E. & Syntetos, Aris A., 2012. "Forecast errors and inventory performance under forecast information sharing," International Journal of Forecasting, Elsevier, vol. 28(4), pages 830-841.
- Syntetos, Aris A. & Boylan, John E., 2006. "On the stock control performance of intermittent demand estimators," International Journal of Production Economics, Elsevier, vol. 103(1), pages 36-47, September.
- Disney, S.M. & Farasyn, I. & Lambrecht, M. & Towill, D.R. & de Velde, W. Van, 2006. "Taming the bullwhip effect whilst watching customer service in a single supply chain echelon," European Journal of Operational Research, Elsevier, vol. 173(1), pages 151-172, August.
- Bahman Rostami‐Tabar & M. Zied Babai & Aris Syntetos & Yves Ducq, 2013. "Demand forecasting by temporal aggregation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(6), pages 479-498, September.
- Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
- A. Shophia Lawrence & B. Sivakumar & G. Arivarignan, 2013. "A discrete time deteriorating inventory system with geometric lead time," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 18(4), pages 484-498.
- Boylan, John E. & Babai, M. Zied, 2016. "On the performance of overlapping and non-overlapping temporal demand aggregation approaches," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 136-144.
- Gardner, Everette Jr., 2006. "Exponential smoothing: The state of the art--Part II," International Journal of Forecasting, Elsevier, vol. 22(4), pages 637-666.
- K Nikolopoulos & A A Syntetos & J E Boylan & F Petropoulos & V Assimakopoulos, 2011. "An aggregate–disaggregate intermittent demand approach (ADIDA) to forecasting: an empirical proposition and analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 544-554, March.
- Bahman Rostami‐Tabar & Mohamed Zied Babai & Aris Syntetos & Yves Ducq, 2014. "A note on the forecast performance of temporal aggregation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(7), pages 489-500, October.
- Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
- Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
- He, Xin James & Kim, Jeon G. & Hayya, Jack C., 2005. "The cost of lead-time variability: The case of the exponential distribution," International Journal of Production Economics, Elsevier, vol. 97(2), pages 130-142, August.
- M. Jakšič & J.C. Fransoo & T. Tan & A.G. de Kok & B. Rusjan, 2011. "Inventory management with advance capacity information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(4), pages 355-369, June.
- Babai, M. Zied & Ali, Mohammad M. & Nikolopoulos, Konstantinos, 2012. "Impact of temporal aggregation on stock control performance of intermittent demand estimators: Empirical analysis," Omega, Elsevier, vol. 40(6), pages 713-721.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
- Jackson, Ilya & Ivanov, Dmitry, 2023. "A beautiful shock? Exploring the impact of pandemic shocks on the accuracy of AI forecasting in the beauty care industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 180(C).
- Andrea Kolková & Petr Rozehnal, 2022. "Hybrid demand forecasting models: pre-pandemic and pandemic use studies," Equilibrium. Quarterly Journal of Economics and Economic Policy, Institute of Economic Research, vol. 17(3), pages 699-725, September.
- Sarkar, Biswajit & Kar, Sumi & Basu, Kajla & Seo, Yong Won, 2023. "Is the online-offline buy-online-pickup-in-store retail strategy best among other product delivery strategies under variable lead time?," Journal of Retailing and Consumer Services, Elsevier, vol. 73(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022.
"Forecasting: theory and practice,"
International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
- Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
- Rostami-Tabar, Bahman & Babai, M. Zied & Ali, Mohammad & Boylan, John E., 2019. "The impact of temporal aggregation on supply chains with ARMA(1,1) demand processes," European Journal of Operational Research, Elsevier, vol. 273(3), pages 920-932.
- Trapero, Juan R. & Cardós, Manuel & Kourentzes, Nikolaos, 2019. "Quantile forecast optimal combination to enhance safety stock estimation," International Journal of Forecasting, Elsevier, vol. 35(1), pages 239-250.
- Babai, Zied & Boylan, John E. & Kolassa, Stephan & Nikolopoulos, Konstantinos, 2016. "Supply chain forecasting: Theory, practice, their gap and the futureAuthor-Name: Syntetos, Aris A," European Journal of Operational Research, Elsevier, vol. 252(1), pages 1-26.
- Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
- Trapero, Juan R. & Cardós, Manuel & Kourentzes, Nikolaos, 2019. "Empirical safety stock estimation based on kernel and GARCH models," Omega, Elsevier, vol. 84(C), pages 199-211.
- Michna, Zbigniew & Disney, Stephen M. & Nielsen, Peter, 2020. "The impact of stochastic lead times on the bullwhip effect under correlated demand and moving average forecasts," Omega, Elsevier, vol. 93(C).
- Rostami-Tabar, Bahman & Disney, Stephen M., 2023. "On the order-up-to policy with intermittent integer demand and logically consistent forecasts," International Journal of Production Economics, Elsevier, vol. 257(C).
- Pastore, Erica & Alfieri, Arianna & Zotteri, Giulio & Boylan, John E., 2020. "The impact of demand parameter uncertainty on the bullwhip effect," European Journal of Operational Research, Elsevier, vol. 283(1), pages 94-107.
- Syntetos, Aris A. & Zied Babai, M. & Gardner, Everette S., 2015. "Forecasting intermittent inventory demands: simple parametric methods vs. bootstrapping," Journal of Business Research, Elsevier, vol. 68(8), pages 1746-1752.
- Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
- Athanasopoulos, George & Hyndman, Rob J. & Kourentzes, Nikolaos & Panagiotelis, Anastasios, 2024.
"Forecast reconciliation: A review,"
International Journal of Forecasting, Elsevier, vol. 40(2), pages 430-456.
- George Athanasopoulos & Rob J Hyndman & Nikolaos Kourentzes & Anastasios Panagiotelis, 2023. "Forecast Reconciliation: A Review," Monash Econometrics and Business Statistics Working Papers 8/23, Monash University, Department of Econometrics and Business Statistics.
- Saoud, Patrick & Kourentzes, Nikolaos & Boylan, John E., 2022. "Approximations for the Lead Time Variance: a Forecasting and Inventory Evaluation," Omega, Elsevier, vol. 110(C).
- Nikolopoulos, Konstantinos, 2021. "We need to talk about intermittent demand forecasting," European Journal of Operational Research, Elsevier, vol. 291(2), pages 549-559.
- Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "OVAP: A strategy to implement partial information sharing among supply chain retailers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 110(C), pages 122-136.
- Ma, Yungao & Wang, Nengmin & He, Zhengwen & Lu, Jizhou & Liang, Huigang, 2015. "Analysis of the bullwhip effect in two parallel supply chains with interacting price-sensitive demands," European Journal of Operational Research, Elsevier, vol. 243(3), pages 815-825.
- Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
- Van der Auweraer, Sarah & Boute, Robert, 2019. "Forecasting spare part demand using service maintenance information," International Journal of Production Economics, Elsevier, vol. 213(C), pages 138-149.
- Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
- Jože Martin Rožanec & Blaž Fortuna & Dunja Mladenić, 2022. "Reframing Demand Forecasting: A Two-Fold Approach for Lumpy and Intermittent Demand," Sustainability, MDPI, vol. 14(15), pages 1-21, July.
More about this item
Keywords
Forecasting; Safety stocks; Demand variance; Auto-correlated demand; Lead-times;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:296:y:2022:i:3:p:846-861. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.