IDEAS home Printed from https://ideas.repec.org/e/pin116.html
   My authors  Follow this author

Ching-Kang Ing

Personal Details

First Name:Ching-Kang
Middle Name:
Last Name:Ing
Suffix:
RePEc Short-ID:pin116
http://mx.nthu.edu.tw/~cking/

Affiliation

國立清華大學統計學研究所 (Institute of Statistics, National Tsing Hua University)

http://stat.web.nthu.edu.tw/bin/home.php
Taiwan, Hsinchu

Research output

as
Jump to: Working papers Articles

Working papers

  1. HONDA, Toshio & ING, Ching-Kang & WU, Wei-Ying, 2017. "Adaptively weighted group Lasso for semiparametric quantile regression models," Discussion Papers 2017-04, Graduate School of Economics, Hitotsubashi University.
  2. Ching-Kang Ing & Ching-Zong Wei, 2005. "A maximal moment inequality for long range dependent time series with applications to estimation and model selection," Econometrics 0508009, University Library of Munich, Germany.
  3. Ching-Kang Ing, 2005. "Accumulated Prediction Errors, Information Criteria And Optimal Forecasting For Autoregressive Time Series," Econometrics 0503020, University Library of Munich, Germany.

Articles

  1. Ngai Hang Chan & Ching-Kang Ing & Yuanbo Li & Chun Yip Yau, 2017. "Threshold Estimation via Group Orthogonal Greedy Algorithm," Journal of Business & Economic Statistics, Taylor & Francis Journals, vol. 35(2), pages 334-345, April.
  2. Cheng, Tzu-Chang F. & Ing, Ching-Kang & Yu, Shu-Hui, 2015. "Toward optimal model averaging in regression models with time series errors," Journal of Econometrics, Elsevier, vol. 189(2), pages 321-334.
  3. Ching-Kang Ing & Chiao-Yi Yang, 2014. "Predictor Selection for Positive Autoregressive Processes," Journal of the American Statistical Association, Taylor & Francis Journals, vol. 109(505), pages 243-253, March.
  4. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2012. "Model selection for integrated autoregressive processes of infinite order," Journal of Multivariate Analysis, Elsevier, vol. 106(C), pages 57-71.
  5. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2010. "Prediction Errors In Nonstationary Autoregressions Of Infinite Order," Econometric Theory, Cambridge University Press, vol. 26(3), pages 774-803, June.
  6. Ing, Ching-Kang & Wei, Ching-Zong, 2003. "On same-realization prediction in an infinite-order autoregressive process," Journal of Multivariate Analysis, Elsevier, vol. 85(1), pages 130-155, April.
  7. Ching‐Kang Ing & Shu‐Hui Yu, 2003. "On Estimating Conditional Mean‐Squared Prediction Error in Autoregressive Models," Journal of Time Series Analysis, Wiley Blackwell, vol. 24(4), pages 401-422, July.
  8. Ing, Ching-Kang, 2003. "Multistep Prediction In Autoregressive Processes," Econometric Theory, Cambridge University Press, vol. 19(2), pages 254-279, April.

Citations

Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Working papers

  1. Ching-Kang Ing, 2005. "Accumulated Prediction Errors, Information Criteria And Optimal Forecasting For Autoregressive Time Series," Econometrics 0503020, University Library of Munich, Germany.

    Cited by:

    1. Hansen, Bruce E., 2008. "Least-squares forecast averaging," Journal of Econometrics, Elsevier, vol. 146(2), pages 342-350, October.

Articles

  1. Cheng, Tzu-Chang F. & Ing, Ching-Kang & Yu, Shu-Hui, 2015. "Toward optimal model averaging in regression models with time series errors," Journal of Econometrics, Elsevier, vol. 189(2), pages 321-334.

    Cited by:

    1. Yicong Lin & Hanno Reuvers, 2019. "Efficient Estimation by Fully Modified GLS with an Application to the Environmental Kuznets Curve," Papers 1908.02552, arXiv.org, revised Aug 2020.
    2. Shiqing Ling & Michael McAleer & Howell Tong, 2015. "Frontiers in Time Series and Financial Econometrics: An Overview," Tinbergen Institute Discussion Papers 15-026/III, Tinbergen Institute.
    3. Gao, Yan & Zhang, Xinyu & Wang, Shouyang & Chong, Terence Tai Leung & Zou, Guohua, 2017. "Frequentist model averaging for threshold models," MPRA Paper 92036, University Library of Munich, Germany.
    4. Liao, Jun & Zong, Xianpeng & Zhang, Xinyu & Zou, Guohua, 2019. "Model averaging based on leave-subject-out cross-validation for vector autoregressions," Journal of Econometrics, Elsevier, vol. 209(1), pages 35-60.
    5. Verdejo, Humberto & Awerkin, Almendra & Becker, Cristhian & Olguin, Gabriel, 2017. "Statistic linear parametric techniques for residential electric energy demand forecasting. A review and an implementation to Chile," Renewable and Sustainable Energy Reviews, Elsevier, vol. 74(C), pages 512-521.
    6. Cintya Lanchimba & Josef Windsperger & Muriel Fadairo, 2018. "Entrepreneurial orientation, risk and incentives: the case of franchising," Small Business Economics, Springer, vol. 50(1), pages 163-180, January.
    7. Ling, S. & McAleer, M.J. & Tong, H., 2015. "Frontiers in Time Series and Financial Econometrics," Econometric Institute Research Papers EI 2015-07, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

  2. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2012. "Model selection for integrated autoregressive processes of infinite order," Journal of Multivariate Analysis, Elsevier, vol. 106(C), pages 57-71.

    Cited by:

    1. Chor-yiu Sin & Shu-Hui Yu, 2019. "Order selection for possibly infinite-order non-stationary time series," AStA Advances in Statistical Analysis, Springer;German Statistical Society, vol. 103(2), pages 187-216, June.

  3. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2010. "Prediction Errors In Nonstationary Autoregressions Of Infinite Order," Econometric Theory, Cambridge University Press, vol. 26(3), pages 774-803, June.

    Cited by:

    1. Chor-yiu Sin & Shu-Hui Yu, 2019. "Order selection for possibly infinite-order non-stationary time series," AStA Advances in Statistical Analysis, Springer;German Statistical Society, vol. 103(2), pages 187-216, June.
    2. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2012. "Model selection for integrated autoregressive processes of infinite order," Journal of Multivariate Analysis, Elsevier, vol. 106(C), pages 57-71.

  4. Ing, Ching-Kang & Wei, Ching-Zong, 2003. "On same-realization prediction in an infinite-order autoregressive process," Journal of Multivariate Analysis, Elsevier, vol. 85(1), pages 130-155, April.

    Cited by:

    1. Hansen, Bruce E., 2010. "Averaging estimators for autoregressions with a near unit root," Journal of Econometrics, Elsevier, vol. 158(1), pages 142-155, September.
    2. Moiseev, Nikita & Volodin, Andrei, 2019. "Increasing the accuracy of macroeconomic time series forecast by incorporating functional and correlational dependencies between them," Applied Econometrics, Publishing House "SINERGIA PRESS", vol. 53, pages 119-137.
    3. Liu, Chu-An & Tao, Jing, 2016. "Model selection and model averaging in nonparametric instrumental variables models," MPRA Paper 69492, University Library of Munich, Germany.
    4. Hwang, Eunju & Shin, Dong Wan, 2014. "Infinite-order, long-memory heterogeneous autoregressive models," Computational Statistics & Data Analysis, Elsevier, vol. 76(C), pages 339-358.
    5. Yongmiao Hong & Tae-Hwy Lee & Yuying Sun & Shouyang Wang & Xinyu Zhang, 2017. "Time-varying Model Averaging," Working Papers 202001, University of California at Riverside, Department of Economics.
    6. Ng, Serena, 2013. "Variable Selection in Predictive Regressions," Handbook of Economic Forecasting, in: G. Elliott & C. Granger & A. Timmermann (ed.),Handbook of Economic Forecasting, edition 1, volume 2, chapter 0, pages 752-789, Elsevier.
    7. Massimo Guidolin & Manuela Pedio, 2020. "Distilling Large Information Sets to Forecast Commodity Returns: Automatic Variable Selection or HiddenMarkov Models?," BAFFI CAREFIN Working Papers 20140, BAFFI CAREFIN, Centre for Applied Research on International Markets Banking Finance and Regulation, Universita' Bocconi, Milano, Italy.
    8. Jirak, Moritz, 2014. "Simultaneous confidence bands for sequential autoregressive fitting," Journal of Multivariate Analysis, Elsevier, vol. 124(C), pages 130-149.
    9. Greenaway-McGrevy, Ryan, 2015. "Evaluating panel data forecasts under independent realization," Journal of Multivariate Analysis, Elsevier, vol. 136(C), pages 108-125.
    10. Schorfheide, Frank, 2005. "VAR forecasting under misspecification," Journal of Econometrics, Elsevier, vol. 128(1), pages 99-136, September.
    11. Zhang, Xinyu & Wan, Alan T.K. & Zou, Guohua, 2013. "Model averaging by jackknife criterion in models with dependent data," Journal of Econometrics, Elsevier, vol. 174(2), pages 82-94.
    12. Cheng, Tzu-Chang F. & Ing, Ching-Kang & Yu, Shu-Hui, 2015. "Toward optimal model averaging in regression models with time series errors," Journal of Econometrics, Elsevier, vol. 189(2), pages 321-334.
    13. Jennifer Castle & Jurgen Doornik & David Hendry, 2018. "Selecting a Model for Forecasting," Economics Series Working Papers 861, University of Oxford, Department of Economics.
    14. Hansen, Bruce E., 2008. "Least-squares forecast averaging," Journal of Econometrics, Elsevier, vol. 146(2), pages 342-350, October.
    15. Ing, Ching-Kang & Sin, Chor-yiu & Yu, Shu-Hui, 2012. "Model selection for integrated autoregressive processes of infinite order," Journal of Multivariate Analysis, Elsevier, vol. 106(C), pages 57-71.

  5. Ching‐Kang Ing & Shu‐Hui Yu, 2003. "On Estimating Conditional Mean‐Squared Prediction Error in Autoregressive Models," Journal of Time Series Analysis, Wiley Blackwell, vol. 24(4), pages 401-422, July.

    Cited by:

    1. Ng, Serena, 2013. "Variable Selection in Predictive Regressions," Handbook of Economic Forecasting, in: G. Elliott & C. Granger & A. Timmermann (ed.),Handbook of Economic Forecasting, edition 1, volume 2, chapter 0, pages 752-789, Elsevier.

  6. Ing, Ching-Kang, 2003. "Multistep Prediction In Autoregressive Processes," Econometric Theory, Cambridge University Press, vol. 19(2), pages 254-279, April.

    Cited by:

    1. Fearghal Kearney & Han Lin Shang & Lisa Sheenan, 2019. "Implied volatility surface predictability: the case of commodity markets," Papers 1909.11009, arXiv.org.
    2. Massimiliano Marcellino & James Stock & Mark Watson, 2005. "A Comparison of Direct and Iterated Multistep AR Methods for Forecasting Macroeconomic Time Series," Working Papers 285, IGIER (Innocenzo Gasparini Institute for Economic Research), Bocconi University.
    3. Hansen, Bruce E., 2010. "Averaging estimators for autoregressions with a near unit root," Journal of Econometrics, Elsevier, vol. 158(1), pages 142-155, September.
    4. Proietti, Tommaso, 2011. "The Multistep Beveridge-Nelson Decomposition," Working Papers 09/2011, University of Sydney Business School, Discipline of Business Analytics.
    5. Pincheira, Pablo M. & West, Kenneth D., 2016. "A comparison of some out-of-sample tests of predictability in iterated multi-step-ahead forecasts," Research in Economics, Elsevier, vol. 70(2), pages 304-319.
    6. Eliana González Molano & Luis Fernando Melo Velandia & Anderson Grajales Olarte, 2007. "Pronósticos directos de la inflación colombiana," Borradores de Economia 458, Banco de la Republica de Colombia.
    7. Alfred A. Haug & Christie Smith, 2007. "Local linear impulse responses for a small open economy," Working Papers 0707, University of Otago, Department of Economics, revised Apr 2007.
    8. M. Hashem Pesaran & Andreas Pick & Allan Timmermann, 2010. "Variable Selection, Estimation and Inference for Multi-period Forecasting Problems," DNB Working Papers 250, Netherlands Central Bank, Research Department.
    9. Clark, Todd E. & West, Kenneth D., 2006. "Using out-of-sample mean squared prediction errors to test the martingale difference hypothesis," Journal of Econometrics, Elsevier, vol. 135(1-2), pages 155-186.
    10. Todd E. Clark & Kenneth D. West, 2005. "Using Out-of-Sample Mean Squared Prediction Errors to Test the Martingale Difference," NBER Technical Working Papers 0305, National Bureau of Economic Research, Inc.
    11. M. Hashem Pesaran & Andreas Pick & Allan Timmermann, 2009. "Variable Selection and Inference for Multi-period Forecasting Problems," CESifo Working Paper Series 2543, CESifo.
    12. Òscar Jordà, 2005. "Estimation and Inference of Impulse Responses by Local Projections," American Economic Review, American Economic Association, vol. 95(1), pages 161-182, March.
    13. Hännikäinen, Jari, 2014. "Multi-step forecasting in the presence of breaks," MPRA Paper 55816, University Library of Munich, Germany.
    14. Moiseev, Nikita & Volodin, Andrei, 2019. "Increasing the accuracy of macroeconomic time series forecast by incorporating functional and correlational dependencies between them," Applied Econometrics, Publishing House "SINERGIA PRESS", vol. 53, pages 119-137.
    15. Proietti, Tommaso, 2008. "Direct and iterated multistep AR methods for difference stationary processes," MPRA Paper 10859, University Library of Munich, Germany.
    16. West, Kenneth D., 2006. "Forecast Evaluation," Handbook of Economic Forecasting, in: G. Elliott & C. Granger & A. Timmermann (ed.),Handbook of Economic Forecasting, edition 1, volume 1, chapter 3, pages 99-134, Elsevier.
    17. Kenneth D. West & Todd Clark, 2006. "Approximately Normal Tests for Equal Predictive Accuracy in Nested Models," NBER Technical Working Papers 0326, National Bureau of Economic Research, Inc.
    18. Nicholas Apergis & Panagiotis G. Artikis, 2016. "Foreign Exchange Risk, Equity Risk Factors and Economic Growth," Atlantic Economic Journal, Springer;International Atlantic Economic Society, vol. 44(4), pages 425-445, December.
    19. Ching-Kang Ing & Chiao-Yi Yang, 2014. "Predictor Selection for Positive Autoregressive Processes," Journal of the American Statistical Association, Taylor & Francis Journals, vol. 109(505), pages 243-253, March.
    20. Thomas Flavin & Ekaterini Panopoulou & Theologos Pantelidis, 2009. "Forecasting growth and inflation in an enlarged euro area," Journal of Forecasting, John Wiley & Sons, Ltd., vol. 28(5), pages 405-425.
    21. Euler Pereira G. de Mello & Francisco Marcos R. Figueiredo, 2014. "Assessing the Short-term Forecasting Power of Confidence Indices," Working Papers Series 371, Central Bank of Brazil, Research Department.
    22. Alexander Chudik & Valerie Grossman & M. Hashem Pesaran, 2014. "A multi-country approach to forecasting output growth using PMIs," Globalization Institute Working Papers 213, Federal Reserve Bank of Dallas, revised 01 Nov 2014.
    23. Chevillon, Guillaume, 2016. "Multistep forecasting in the presence of location shifts," International Journal of Forecasting, Elsevier, vol. 32(1), pages 121-137.
    24. Chevillon, Guillaume, 2017. "Robustness of Multistep Forecasts and Predictive Regressions at Intermediate and Long Horizons," ESSEC Working Papers WP1710, ESSEC Research Center, ESSEC Business School.
    25. Wu, Jyh-Lin & Lee, Chingnun & Wang, Tzu-Wei, 2011. "A re-examination on dissecting the purchasing power parity puzzle," Journal of International Money and Finance, Elsevier, vol. 30(3), pages 572-586, April.
    26. Chevillon, Guillaume, 2009. "Multi-step forecasting in emerging economies: An investigation of the South African GDP," International Journal of Forecasting, Elsevier, vol. 25(3), pages 602-628, July.
    27. João Henrique Gonçalves Mazzeu & Esther Ruiz & Helena Veiga, 2018. "Uncertainty And Density Forecasts Of Arma Models: Comparison Of Asymptotic, Bayesian, And Bootstrap Procedures," Journal of Economic Surveys, Wiley Blackwell, vol. 32(2), pages 388-419, April.
    28. David Hendry & Guillaume Chevillon, 2004. "Non-Parametric Direct Multi-step Estimation for Forecasting Economic Processes," Economics Series Working Papers 196, University of Oxford, Department of Economics.
    29. Stuart, Rebecca, 2020. "Monetary regimes, the term structure and business cycles in Ireland, 1972-2018," QUCEH Working Paper Series 2020-03, Queen's University Belfast, Queen's University Centre for Economic History.
    30. Guillaume Chevillon, 2005. "Direct multi-step estimation and forecasting," Documents de Travail de l'OFCE 2005-10, Observatoire Francais des Conjonctures Economiques (OFCE).
    31. Greenaway-McGrevy, Ryan, 2015. "Evaluating panel data forecasts under independent realization," Journal of Multivariate Analysis, Elsevier, vol. 136(C), pages 108-125.
    32. Ching-Kang Ing, 2005. "Accumulated Prediction Errors, Information Criteria And Optimal Forecasting For Autoregressive Time Series," Econometrics 0503020, University Library of Munich, Germany.
    33. Schorfheide, Frank, 2005. "VAR forecasting under misspecification," Journal of Econometrics, Elsevier, vol. 128(1), pages 99-136, September.
    34. White, Halbert, 2006. "Time-series estimation of the effects of natural experiments," Journal of Econometrics, Elsevier, vol. 135(1-2), pages 527-566.
    35. Hansen, Bruce E., 2006. "Interval forecasts and parameter uncertainty," Journal of Econometrics, Elsevier, vol. 135(1-2), pages 377-398.
    36. Matthias Burgert & Stephane Dees, 2009. "Forecasting World Trade: Direct Versus “Bottom-Up” Approaches," Open Economies Review, Springer, vol. 20(3), pages 385-402, July.
    37. Ing, Ching-Kang & Wei, Ching-Zong, 2003. "On same-realization prediction in an infinite-order autoregressive process," Journal of Multivariate Analysis, Elsevier, vol. 85(1), pages 130-155, April.
    38. John Haywood & Granville Tunnicliffe Wilson, 2009. "A test for improved multi‐step forecasting," Journal of Time Series Analysis, Wiley Blackwell, vol. 30(6), pages 682-707, November.
    39. Hansen, Bruce E., 2008. "Least-squares forecast averaging," Journal of Econometrics, Elsevier, vol. 146(2), pages 342-350, October.

More information

Research fields, statistics, top rankings, if available.

Statistics

Access and download statistics for all items

Co-authorship network on CollEc

NEP Fields

NEP is an announcement service for new working papers, with a weekly report in each of many fields. This author has had 3 papers announced in NEP. These are the fields, ordered by number of announcements, along with their dates. If the author is listed in the directory of specialists for this field, a link is also provided.
  1. NEP-ECM: Econometrics (3) 2005-04-16 2005-11-09 2017-04-16
  2. NEP-ETS: Econometric Time Series (2) 2005-04-16 2005-11-09

Corrections

All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Ching-Kang Ing should log into the RePEc Author Service.

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.