IDEAS home Printed from https://ideas.repec.org/
MyIDEAS: Log in (now much improved!)

Citations for "The capacitated lot sizing problem: a review of models and algorithms"

by Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M.

For a complete description of this item, click here. For a RSS feed for citations of this item, click here.
as
in new window


  1. Boonmee, Atiwat & Sethanan, Kanchana, 2016. "A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry," European Journal of Operational Research, Elsevier, vol. 250(2), pages 652-665.
  2. Almada-Lobo, Bernardo & Oliveira, José F. & Carravilla, Maria Antónia, 2008. "Production planning and scheduling in the glass container industry: A VNS approach," International Journal of Production Economics, Elsevier, vol. 114(1), pages 363-375, July.
  3. repec:spr:joheur:v:23:y:2017:i:4:d:10.1007_s10732-017-9338-9 is not listed on IDEAS
  4. Sahling, Florian & Buschkühl, Lisbeth & Tempelmeier, Horst & Helber, Stefan, 2008. "Solving a Multi-Level Capacitated Lot Sizing Problem with Multi-Period Setup Carry-Over via a Fix-and-Optimize Heuristic," Hannover Economic Papers (HEP) dp-400, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
  5. Anja Wolter & Stefan Helber, 2016. "Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 24(3), pages 489-513, September.
  6. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
  7. Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
  8. Ibarra-Rojas, Omar J. & Ríos-Mercado, Roger Z. & Rios-Solis, Yasmin A. & Saucedo-Espinosa, Mario A., 2011. "A decomposition approach for the piece-mold-machine manufacturing problem," International Journal of Production Economics, Elsevier, vol. 134(1), pages 255-261, November.
  9. Kovcs, Andrs & Brown, Kenneth N. & Tarim, S. Armagan, 2009. "An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups," International Journal of Production Economics, Elsevier, vol. 118(1), pages 282-291, March.
  10. Fink, Jiří & Hurink, Johann L., 2015. "Minimizing costs is easier than minimizing peaks when supplying the heat demand of a group of houses," European Journal of Operational Research, Elsevier, vol. 242(2), pages 644-650.
  11. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
  12. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
  13. Tempelmeier, Horst, 2011. "A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint," Omega, Elsevier, vol. 39(6), pages 627-633, December.
  14. Ou, Jinwen, 2017. "Improved exact algorithms to economic lot-sizing with piecewise linear production costs," European Journal of Operational Research, Elsevier, vol. 256(3), pages 777-784.
  15. Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.
  16. Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
  17. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
  18. Cattani, Kyle D., 2016. "Fenced in? Stochastic and deterministic planning models in a time-fenced, rolling-horizon scheduling systemAuthor-Name: DeYong, Gregory D," European Journal of Operational Research, Elsevier, vol. 251(1), pages 85-95.
  19. Liang, Zhe & He, Yan & Wu, Tao & Zhang, Canrong, 2015. "An informative column generation and decomposition method for a production planning and facility location problem," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 88-96.
  20. Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
  21. Mocquillon, Cédric & Lenté, Christophe & T'Kindt, Vincent, 2011. "An efficient heuristic for medium-term planning in shampoo production," International Journal of Production Economics, Elsevier, vol. 129(1), pages 178-185, January.
  22. Adacher, Ludovica & Cassandras, Christos G., 2014. "Lot size optimization in manufacturing systems: The surrogate method," International Journal of Production Economics, Elsevier, vol. 155(C), pages 418-426.
  23. Tiacci, Lorenzo & Saetta, Stefano, 2009. "An approach to evaluate the impact of interaction between demand forecasting method and stock control policy on the inventory system performances," International Journal of Production Economics, Elsevier, vol. 118(1), pages 63-71, March.
  24. Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
  25. repec:pal:jorsoc:v:57:y:2006:i:2:d:10.1057_palgrave.jors.2601968 is not listed on IDEAS
  26. Gamberi, M. & Gamberini, R. & Manzini, R. & Regattieri, A., 2008. "An analytical model to evaluating the implementation of a batch-production-oriented line," International Journal of Production Economics, Elsevier, vol. 111(2), pages 729-740, February.
  27. Fiestras-Janeiro, M.G. & García-Jurado, I. & Meca, A. & Mosquera, M.A., 2015. "Cooperation on capacitated inventory situations with fixed holding costs," European Journal of Operational Research, Elsevier, vol. 241(3), pages 719-726.
  28. Flavio Molina & Reinaldo Morabito & Silvio Alexandre de Araujo, 2016. "MIP models for production lot sizing problems with distribution costs and cargo arrangement," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(11), pages 1395-1407, November.
  29. Narayanan, Arunachalam & Robinson, Powell, 2010. "Efficient and effective heuristics for the coordinated capacitated lot-size problem," European Journal of Operational Research, Elsevier, vol. 203(3), pages 583-592, June.
  30. Hwang, Hark-Chin & Kang, Jangha, 2016. "Two-phase algorithm for the lot-sizing problem with backlogging for stepwise transportation cost without speculative motives," Omega, Elsevier, vol. 59(PB), pages 238-250.
  31. Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
  32. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
  33. Chen, Haoxun, 2015. "Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems," Omega, Elsevier, vol. 56(C), pages 25-36.
  34. Lukac, Zrinka & Soric, Kristina & Rosenzweig, Visnja Vojvodic, 2008. "Production planning problem with sequence dependent setups as a bilevel programming problem," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1504-1512, June.
  35. repec:eee:ejores:v:263:y:2017:i:3:p:838-863 is not listed on IDEAS
  36. Ferreira, Deisemara & Morabito, Reinaldo & Rangel, Socorro, 2009. "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 196(2), pages 697-706, July.
  37. repec:pal:jorsoc:v:57:y:2006:i:4:d:10.1057_palgrave.jors.2601996 is not listed on IDEAS
  38. Simon Emde, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 321-345, January.
  39. LAMAS, ALEJANDRO & CHEVALIER, Philippe, 2013. "Jumping the hurdles for collaboration: fairness in operations pooling in the absence of transfer payments," CORE Discussion Papers 2013073, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  40. Bredström, David & Rönnqvist, Mikael, 2006. "Supply Chain Optimization in Pulp Distribution using a Rolling Horizon Solution Approach," Discussion Papers 2006/17, Department of Business and Management Science, Norwegian School of Economics.
  41. Pahl, Julia & Voß, Stefan, 2014. "Integrating deterioration and lifetime constraints in production and supply chain planning: A survey," European Journal of Operational Research, Elsevier, vol. 238(3), pages 654-674.
  42. Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
  43. Meyr, Herbert & Mann, Matthias, 2013. "A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines," European Journal of Operational Research, Elsevier, vol. 229(3), pages 718-731.
  44. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
  45. Süral, Haldun & Denizel, Meltem & Van Wassenhove, Luk N., 2009. "Lagrangean relaxation based heuristics for lot sizing with setup times," European Journal of Operational Research, Elsevier, vol. 194(1), pages 51-63, April.
  46. Rezaei, Jafar & Davoodi, Mansoor, 2011. "Multi-objective models for lot-sizing with supplier selection," International Journal of Production Economics, Elsevier, vol. 130(1), pages 77-86, March.
  47. Kian, Ramez & Gürler, Ülkü & Berk, Emre, 2014. "The dynamic lot-sizing problem with convex economic production costs and setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 361-379.
  48. Sazvar, Z. & Mirzapour Al-e-hashem, S.M.J. & Govindan, K. & Bahli, B., 2016. "A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 232-261.
  49. Zhang, Guoqing & Nishi, Tatsushi & Turner, Sarina D.O. & Oga, Keisuke & Li, Xindan, 2017. "An integrated strategy for a production planning and warehouse layout problem: Modeling and solution approaches," Omega, Elsevier, vol. 68(C), pages 85-94.
  50. Xu, Haoxuan & Gong, Yeming (Yale) & Chu, Chengbin & Zhang, Jinlong, 2017. "Dynamic lot-sizing models for retailers with online channels," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 171-184.
  51. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
  52. Bouchery, Yann & Ghaffari, Asma & Jemai, Zied & Tan, Tarkan, 2017. "Impact of coordination on costs and carbon emissions for a two-echelon serial economic order quantity problem," European Journal of Operational Research, Elsevier, vol. 260(2), pages 520-533.
  53. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
  54. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.
  55. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
  56. Wu, Xiang & (Yale) Gong, Yeming & Xu, Haoxuan & Chu, Chengbin & Zhang, Jinlong, 2017. "Dynamic lot-sizing models with pricing for new products," European Journal of Operational Research, Elsevier, vol. 260(1), pages 81-92.
This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.