IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v12y2024i19p3029-d1487802.html
   My bibliography  Save this article

Explicit Modeling of Multi-Product Customer Orders in a Multi-Period Production Planning Model

Author

Listed:
  • Cristian D. Palma

    (Facultad de Ingeniería, Universidad del Desarrollo, Concepción 4040418, Chile)

  • Francisco P. Vergara

    (Departamento de Ingeniería en Maderas, Facultad de Ingeniería, Universidad del Bio-Bio, Concepción 4051381, Chile)

  • Sebastián Muñoz-Herrera

    (Facultad de Ingeniería, Universidad del Desarrollo, Concepción 4040418, Chile)

Abstract

In many industries, companies receive customer orders that include multiple products. To simplify the use of optimization models for planning purposes, these orders are broken down, and the quantities of each product are grouped with the same products from other orders to be completed in the same period. Consequently, traditional production planning models enforce minimum demand constraints by product and period rather than by individual orders. An important drawback of this aggregation procedure is that it requires a fixed order fulfillment period, potentially missing opportunities for more efficient resource use through early completion. This paper introduces a novel mathematical formulation that preserves the integrity of customer orders, allowing for early fulfillment when possible. We compare a traditional linear programming model with a new mixed-integer programming approach using a sawmill case study. Although more complex than the traditional model, the proposed formulation reduces costs by approximately 6% by enabling early order completion and offers greater flexibility and control over the production process. This approach leads to better resource utilization and more precise order management, presenting a valuable alternative to conventional production planning models.

Suggested Citation

  • Cristian D. Palma & Francisco P. Vergara & Sebastián Muñoz-Herrera, 2024. "Explicit Modeling of Multi-Product Customer Orders in a Multi-Period Production Planning Model," Mathematics, MDPI, vol. 12(19), pages 1-13, September.
  • Handle: RePEc:gam:jmathe:v:12:y:2024:i:19:p:3029-:d:1487802
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/12/19/3029/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/12/19/3029/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Jodlbauer, H., 2008. "Customer driven production planning," International Journal of Production Economics, Elsevier, vol. 111(2), pages 793-801, February.
    2. Ismail I. Almaraj & Theodore B. Trafalis, 2022. "A robust optimization approach in a multi-objective closed-loop supply chain model under imperfect quality production," Annals of Operations Research, Springer, vol. 319(2), pages 1479-1505, December.
    3. Umar Muhammad Modibbo & Srikant Gupta & Aquil Ahmed & Irfan Ali, 2024. "An integrated multi-objective multi-product inventory managed production planning problem under uncertain environment," Annals of Operations Research, Springer, vol. 339(3), pages 1679-1723, August.
    4. Varas, Mauricio & Maturana, Sergio & Pascual, Rodrigo & Vargas, Ignacio & Vera, Jorge, 2014. "Scheduling production for a sawmill: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 150(C), pages 37-51.
    5. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jodlbauer, Herbert & Altendorfer, Klaus, 2010. "Trade-off between capacity invested and inventory needed," European Journal of Operational Research, Elsevier, vol. 203(1), pages 118-133, May.
    2. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    3. Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
    4. Feng, Cheng-Min & Wu, Pei-Ju, 2009. "A tax savings model for the emerging global manufacturing network," International Journal of Production Economics, Elsevier, vol. 122(2), pages 534-546, December.
    5. Simon Emde, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 321-345, January.
    6. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
    7. Boonmee, Atiwat & Sethanan, Kanchana, 2016. "A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry," European Journal of Operational Research, Elsevier, vol. 250(2), pages 652-665.
    8. Luis A. Guardiola & Ana Meca & Justo Puerto, 2022. "The effect of consolidated periods in heterogeneous lot-sizing games," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 30(2), pages 380-404, July.
    9. Terzi, Mourad & Ouazene, Yassine & Yalaoui, Alice & Yalaoui, Farouk, 2023. "Lot-sizing and pricing decisions under attraction demand models and multi-channel environment: New efficient formulations," Operations Research Perspectives, Elsevier, vol. 10(C).
    10. Kovcs, Andrs & Brown, Kenneth N. & Tarim, S. Armagan, 2009. "An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups," International Journal of Production Economics, Elsevier, vol. 118(1), pages 282-291, March.
    11. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.
    12. LAMAS, ALEJANDRO & CHEVALIER, Philippe, 2013. "Jumping the hurdles for collaboration: fairness in operations pooling in the absence of transfer payments," LIDAM Discussion Papers CORE 2013073, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    13. Fink, Jiří & Hurink, Johann L., 2015. "Minimizing costs is easier than minimizing peaks when supplying the heat demand of a group of houses," European Journal of Operational Research, Elsevier, vol. 242(2), pages 644-650.
    14. Rachida Benfedel & Fayçal Belkaid & Nadjib Brahimi, 2025. "Production and distribution planning with direct shipment and multi-trips," Post-Print hal-05059003, HAL.
    15. Hartmut Stadtler & Malte Meistering, 2019. "Model formulations for the capacitated lot-sizing problem with service-level constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1025-1056, December.
    16. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
    17. Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.
    18. Lamas, Alejandro & Chevalier, Philippe, 2018. "Joint dynamic pricing and lot-sizing under competition," European Journal of Operational Research, Elsevier, vol. 266(3), pages 864-876.
    19. Mac Cawley, Alejandro & Maturana, Sergio & Pascual, Rodrigo & Tortorella, Guilherme Luz, 2022. "Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach," European Journal of Operational Research, Elsevier, vol. 303(2), pages 819-839.
    20. Henao, César Augusto & Ferrer, Juan Carlos & Muñoz, Juan Carlos & Vera, Jorge, 2016. "Multiskilling with closed chains in a service industry: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 179(C), pages 166-178.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:12:y:2024:i:19:p:3029-:d:1487802. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.