Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Additional information is available for the following registered editor(s):
Stefan Minner .
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
May 2001, Volume 71, Issue 1-3
- 295-303 Multi-product inventory and auxiliary allocation problem
by Bylka, Stanislaw & Rempala, Ryszarda
- 305-315 Multiproduct lot sizing for finite production rate
by Bylka, Stanislaw & Rempala, Ryszarda
- 317-321 Asset-selling problems with holding costs
by David, Israel & Levi, Ofer
- 323-330 Production strategies under environmental constraints: Continuous-time model with concave costs
by Dobos, Imre
- 331-342 Discrete frequency models for inventory management - an introduction
by Favaretto, Daniela & Pesenti, Raffaele & Ukovich, Walter
- 343-350 Production economics and process quality: A Taguchi perspective
by Ganeshan, Ram & Kulkarni, Shailesh & Boone, Tonya
- 351-363 The origins of dynamic inventory modelling under uncertainty: (the men, their work and connection with the Stanford Studies)
by Girlich, Hans-Joachim & Chikan, Attila
- 365-371 Inventory policies for all-or-nothing demand processes
by Hill, Roger M. & Dominey, Matthew J.
- 373-380 On switching-type mixed-ordering policy based on monitoring forecasting error
by Hoshino, Kyoji
- 381-390 Leadtime effects and policy improvement for stochastic inventory control with remanufacturing
by Inderfurth, Karl & van der Laan, Erwin
- 391-399 Pure and modified base-stock policies for the lost sales inventory system with negligible set-up costs and constant lead times
by Johansen, Soren Glud
- 401-405 Determining the size and location of suppliers for a minimum total distribution route problem
by Kalfakakou, Ria & Tsouros, Constantin C.
- 407-415 Stockout risk and order splitting
by Kelle, Peter & Miller, Pam Anders
- 417-428 Strategic safety stocks in reverse logistics supply chains
by Minner, Stefan
- 429-438 Simulation of supply chain behaviour and performance in an uncertain environment
by Petrovic, Dobrila
- 439-446 Multicriteria ranking of inventory replenishment policies in the presence of uncertainty in customer demand
by Petrovic, Radivoj & Petrovic, Dobrila
- 447-456 The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
by Richter, Knut & Weber, Jens
- 457-466 On the bias of intermittent demand estimates
by Syntetos, A. A. & Boylan, J. E.
- 467-472 Project procurement and disposal decisions: An inventory management model
by Willoughby, Keith A.
April 2001, Volume 70, Issue 3
- 201-214 U-shaped production lines: A review of theory and practice
by Miltenburg, John
- 215-226 Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
by Weng, Michael X. & Lu, John & Ren, Haiying
- 227-235 Interdependencies between network and activity-analytical descriptions of production relationships in the implementation of large-scale projects - illustrated by textbook production
by Fandel, Gunter
- 237-244 Linking maintenance strategies to performance
by Swanson, Laura
- 245-255 An inter-organizational information system for supply chain management
by Humphreys, P. K. & Lai, M. K. & Sculli, D.
- 257-266 Machine repairing models for production systems
by Ki Ching, Wai
- 267-278 Reengineering of materials management system: A case study
by Mohanty, R. P. & Deshmukh, S. G.
- 279-288 On the present worth of multivariate quality loss
by Chou, Chao-Yu & Chen, Chung-Ho
- 289-292 The economic production quantity (EPQ) with shortage derived algebraically
by Cardenas-Barron, Leopoldo Eduardo
- 293-293 Letter to the editor
by Chakrabarti, T. & Chaudhuri, K. S.
March 2001, Volume 70, Issue 2
- 101-115 Minimizing makespan in a blocking flowshop using genetic algorithms
by Caraffa, Vince & Ianes, Stefano & P. Bagchi, Tapan & Sriskandarajah, Chelliah
- 117-123 Scheduling in the two-machine flowshop with due date constraints
by Lin, Bertrand M. T.
- 125-143 Equipment flexibility vs. inventory: A simulation study of manufacturing systems
by Garg, Suresh & Vrat, Prem & Kanda, Arun
- 145-161 Makespan estimation in batch process industries using aggregate resource and job set characteristics
by H.M. Raaymakers, Wenny & Will M. Bertrand, J. & C. Fransoo, Jan
- 163-174 Forecasting practices of Canadian firms: Survey results and comparisons
by Klassen, Robert D. & Flores, Benito E.
- 175-184 The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
by Chen, Miao-Sheng & Lan, Chun-Hsiung
- 185-197 Minimizing WIP inventory in reliable production lines
by Papadopoulos, H. T. & Vidalis, M. I.
March 2001, Volume 70, Issue 1
- 1-19 Learning and process improvement during production ramp-up
by Terwiesch, Christian & E. Bohn, Roger
- 21-36 Information flows for high-performance manufacturing
by Forza, C. & Salvador, F.
- 37-43 A note on joint estimation of scale economies and productivity growth parameters
by Tsionas, Efthymios G. & Loizides, John
- 45-54 Minimizing the expected total value of shortages for a population of items subject to practical restrictions on the reorder points
by Moon, Ilkyeong & A. Silver, Edward
- 55-65 Tolerance synthesis by neural learning and nonlinear programming
by Chen, Mu-Chen
- 67-76 Order splitting under periodic review inventory systems
by Chiang, Chi
- 77-87 Structure optimization for continuous production systems with buffers under reliability constraints
by Levitin, G. & Meizin, L.
- 89-97 An international comparison of the effect of manufacturing strategy-implementation gap on business performance
by Rho, Boo-Ho & Park, Kwangtae & Yu, Yung-Mok
February 2001, Volume 69, Issue 3
- 255-264 Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time
by Amen, Matthias
- 265-275 The use of parametric and non-parametric frontier methods to measure the productive efficiency in the industrial sector: A comparative study
by Murillo-Zamorano, Luis R. & Vega-Cervera, Juan A.
- 277-285 The calculation of shadow prices for industrial wastes using distance functions: An analysis for Spanish ceramic pavements firms
by Reig-Martinez, Ernest & Picazo-Tadeo, Andres & Hernandez-Sancho, Francesc
- 287-296 A framework for maintenance and replacement of a network structured system
by Scarf, Philip A. & Martin, Harry H.
- 297-306 Make to stock or make to order: The decoupling point in the food processing industries
by van Donk, Dirk Pieter
- 307-315 A two-echelon inventory model with lost sales
by Andersson, Jonas & Melchiors, Philip
- 317-322 Common due date assignment for scheduling on a single machine with jointly reducible processing times
by Biskup, Dirk & Jahnke, Hermann
- 323-338 Minimizing total flow time in a two-machine flowshop problem with minimum makespan
by Gupta, Jatinder N. D. & Neppalli, Venkata R. & Werner, Frank
- 339-345 Heuristics for replenishment with linear decreasing demand
by Zhao, G. Q. & Yang, J. & Rand, G. K.
January 2001, Volume 69, Issue 2
- 119-127 Valuation of strategic production decisions
by Brassler, Axel & Schneider, Herfried
- 129-140 Integration of production and logistics -- in principle, in practice and in education
by Chikan, Attila
- 141-149 Strategic behaviours in international telecommunications system
by Cricelli, Livio & Gastaldi, Massimo & Levialdi, Nathan
- 151-159 QFD not just a tool but a way of quality management
by Govers, Cor P. M.
- 161-176 Ten tools for customer-driven product development in industrial companies
by Karkkainen, Hannu & Piippo, Petteri & Tuominen, Markku
- 177-191 The development of a decision support tool for the selection of advanced technology to achieve rapid product development
by Kengpol, Athakorn & O'Brien, Christopher
- 193-204 Customer service based design of the supply chain
by Korpela, Jukka & Lehmusvaara, Antti & Tuominen, Markku
- 205-213 Manufacturing and supplier roles in product development
by Maffin, David & Braiden, Paul
- 215-225 Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning
by Olhager, Jan & Rudberg, Martin & Wikner, Joakim
- 227-238 The integrated management of logistic chains in the white goods industry. A field research in Italy
by Perona, Marco & Cigolini, Roberto & Adani, Mattia & Biondi, Roberto & Guzzetti, Stefano & Jenna, Ruggero & Chessa, Mario & Agellara, Stefano
- 239-252 Dynamic analysis of changes in decisional structures of production systems
by Zulch, Gert & Rinn, Andreas & Strate, Oliver
January 2001, Volume 69, Issue 1
- 1-14 A caveat on the measurement of productive efficiency
by Agrell, Per J. & Martin West, B.
- 15-22 Strategy management through quantitative modelling of performance measurement systems
by Bititci, U. S. & Suwignjo, P. & Carrie, A. S.
- 23-37 Coherence analysis methods for production systems by performance aggregation
by Ducq, Yves & Vallespir, Bruno & Doumeingts, Guy
- 39-48 Performance analysis of a batch production system with limited flexibility
by Garavelli, A. Claudio
- 49-64 Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments
by Ertugrul Karsak, E. & Tolga, Ethem
- 65-83 Cycles optimization: The equivalent annuity and the NPV approaches
by Luciano, Elisa & Peccati, Lorenzo
- 85-91 Internal obstacles restraining productivity improvement in small Finnish industrial enterprises
by Rantanen, Hannu
- 93-105 An integrated approach to process control
by Schippers, Werner A. J.
- 107-116 Performance measurement in construction logistics
by Wegelius-Lehtonen, Tutu
December 2000, Volume 68, Issue 3
- 217-228 Continuous review inventory models where random lead time depends on lot size and reserved capacity
by Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal
- 229-239 Capacity allocation and outsourcing in a process industry
by de Kok, Ton G.
- 241-257 A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
by Dellaert, N. & Jeunet, J. & Jonard, N.
- 259-278 Genetic algorithm optimisation of a class of inventory control systems
by Disney, S. M. & Naim, M. M. & Towill, D. R.
- 279-286 The (r,Q) control of a periodic-review inventory system with continuous demand and lost sales
by Johansen, Soren Glud & Hill, Roger M.
- 287-306 Integration of assembly and fabrication for make-to-order production
by Kolisch, R.
- 307-317 The (R, Q) inventory policy subject to a compound Poisson demand pattern
by Matheus, Peter & Gelders, Ludo
- 319-331 An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem
by Ozdamar, Linet & Barbarosoglu, Gulay
November 2000, Volume 68, Issue 2
- 123-135 Modelling rescheduling activities in a multi-period production-inventory system
by Grubbstrom, Robert W. & Tang, Ou
- 137-149 Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries
by Raaymakers, Wenny H. M. & Fransoo, Jan C.
- 151-159 Performance guarantee of two simple priority rules for production scheduling
by Schmidt, Gunter
- 161-167 A practical decomposition approach for a chemical substance scheduling problem
by Van Bael, Patrick & Rijckaert, Marcel
- 169-176 The impact of material coordination concepts on planning stability in supply chains
by van Donselaar, K. & van den Nieuwenhof, J. & Visschers, J.
- 177-183 Parallel machine scheduling with batch delivery costs
by Wang, Guoqing & Cheng, T. C. Edwin
- 185-197 Application of multiagent systems in project management
by Yan, Yuhong & Kuphal, Torsten & Bode, Jurgen
- 199-213 A heuristic solution concept for a generalized machine sequencing problem with an application to radiator manufacturing
by Zapfel, G. & Wasner, M.
October 2000, Volume 68, Issue 1
- 1-1 Preface
by Grubbstrom, Robert W. & Hinterhuber, Hans H.
- 1-14 Heuristic methods for cost-oriented assembly line balancing: A survey
by Amen, Matthias
- 15-27 Service system structure
by Buzacott, John A.
- 29-42 Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines
by Caridi, Maria & Sianesi, Andrea
- 43-57 Production variability and shop configuration: An experimental analysis
by D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan
- 59-71 A performance comparison of pull type control mechanisms for multi-stage manufacturing
by Karaesmen, Fikri & Dallery, Yves
- 73-93 Modelling input-output workload control for dynamic capacity planning in production planning systems
by Kingsman, Brian G.
- 95-106 Greedy heuristic algorithms for manpower shift planning
by Lagodimos, A. G. & Leopoulos, V.
- 107-119 The influence of shop characteristics on workload control
by Oosterman, Bas & Land, Martin & Gaalman, Gerard
October 2000, Volume 67, Issue 3
- 205-218 Specialization, teamwork, and production efficiency
by Powell, Stephen G.
- 219-233 Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments
by Diaby, Moustapha
- 235-252 Coordination of internal supply chains in vertically integrated high-tech manufacturing organizations (HTMOs)
by Ugarte, Armando & Oren, Shmuel
- 253-267 Total product quality
by Murthy, D. N. P. & Ravi Kumar, K.
- 269-277 An extended newsboy problem with shortage-level constraints
by Chen, M. S. & Chuang, C. C.
- 279-293 Complementarities between JIT purchasing practices: An economic analysis based on transaction costs
by Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin
September 2000, Volume 67, Issue 2
- 103-112 QFD in new production technology evaluation
by Lowe, Antony & Ridgway, Keith & Atkinson, Helen
- 113-133 Selecting quality-based programmes in small firms: A comparison between the fuzzy linguistic approach and the analytic hierarchy process
by Noci, Giuliano & Toletti, Giovanni
- 135-154 Investments and investment processes in professional service groups
by Segelod, Esbjorn
- 155-167 Developments of the payback method
by Yard, Stefan
- 169-182 Analysing organisational issues in concurrent new product development
by Haque, Badr & Pawar, Kulwant S. & Barson, Richard J.
- 183-199 A nonlinear mixed integer multiperiod firm model
by Ostermark, Ralf & Skrifvars, Hans & Westerlund, Tapio
- 201-201 Observation on: "Economic production quantity model for items with imperfect quality" [Int. J. Production Economics 64 (2000) 59-64]
by Cardenas-Barron, Leopoldo Eduardo
August 2000, Volume 67, Issue 1
- 1-2 Maintenance and reliability
by Sander, Peter & Wang, Wenbin
- 3-15 The building bricks of product quality: An overview of some basic concepts and principles
by Berden, Thijs P. J. & Brombacher, Aarnout C. & Sander, Peter C.
- 17-26 Accelerated stress testing in a time-driven product development process
by Lu, Yuan & Loh, Han Tong & Brombacher, Aarnout Cornelis & Ouden, Elke den
- 27-36 The use of quality metrics in service centres
by Petkova, Valia T. & Sander, Peter C. & Brombacher, Aarnout C.
- 37-52 Analysis of quality information flows in the product creation process of high-volume consumer products
by Sander, Peter C. & Brombacher, Aarnout C.
- 53-61 Calculating the expected failure rate of complex equipment subject to hazardous repair
by Baker, Rose D.
- 63-76 A data deficiency based parameter estimating problem and case study in delay time PM modeling
by Christer, A. H. & Lee, C. & Wang, W.
- 77-85 Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures
by Christer, A. H. & Lee, C.
- 87-94 Determining economical maintenance intervals
by Percy, David F. & Kobbacy, Khairy A. H.
- 95-100 Optimal repair-replace strategies for a warranted product
by Jack, Nat & Van der Duyn Schouten, Frank
July 2000, Volume 66, Issue 3
- 199-211 Lot streaming in multistage production systems
by Ramasesh, Ranga V. & Fu, Haizhen & Fong, Duncan K. H. & Hayya, Jack C.
- 213-226 Robust multi-item newsboy models with a budget constraint
by Vairaktarakis, George L.
- 227-240 Planning and managing manufacturing capacity when demand is subject to diffusion effects
by Cantamessa, Marco & Valentini, Carlo
- 241-254 Self-assessment using the business excellence model: A study of practice and process
by Ritchie, L. & Dale, B. G.
- 255-268 Traditional and innovative paths towards time-based competition
by De Toni, Alberto & Meneghetti, Antonella
- 269-285 A multi-agent approach for the capacity allocation problem
by Brandolese, Armando & Brun, Alessandro & Portioli-Staudacher, Alberto
- 287-292 A note on An efficient algorithm for the single-machine tardiness problem
by Biskup, Dirk & Piewitt, Wolfgang
June 2000, Volume 66, Issue 2
- 101-104 Estimating the cost for doing a cost estimate
by Remer, Donald S. & Buchanan, Harry R.
- 105-117 Convergence and productive efficiency in fourteen OECD countries: A non-parametric frontier approach
by Arcelus, Francisco J. & Arocena, Pablo
- 119-129 A cone-ratio DEA approach for AMT justification
by Talluri, Srinivas & Paul Yoon, K.
- 131-142 Evaluation of the potential benefits of lot streaming in flow-shop systems
by Kalir, Adar A. & Sarin, Subhash C.
- 143-147 Quality certification and performance of Brazilian firms: An empirical study
by A.M. Lima, Marcos & Resende, Marcelo & Hasenclever, Lia
- 149-158 On optimal two-stage lot sizing and inventory batching policies
by Hill, Roger M.
- 159-169 Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
by Haase, Knut & Kimms, Alf
- 171-184 Using hierarchical pseudo bills of material for customer order acceptance and optimal material replenishment in assemble to order manufacturing of non-modular products
by Bertrand, J. W. M. & Zuijderwijk, M. & Hegge, H. M. H.
- 185-195 Optimising product recycling chains by control theory
by Kleineidam, U. & Lambert, A. J. D. & Blansjaar, J. & Kok, J. J. & van Heijningen, R. J. J.
June 2000, Volume 66, Issue 1
- 1-12 Demand uncertainty and returns policies for a seasonal product: An alternative model
by Hing-Ling Lau, Amy & Lau, Hon-Shiang & Willett, Keith D.
- 13-22 Parametric analysis of setup cost in the economic lot-sizing model without speculative motives
by Hoesel, C. P. M. Van & Wagelmans, A. P. M.
- 23-31 Process improvement for a container-filling process with random shifts
by Williams, William W. & Tang, Kwei & Gong, Linguo
- 33-44 The integration of activity based costing and enterprise modeling for reengineering purposes
by Tatsiopoulos, I. P. & Panayiotou, N.
- 45-52 Justification of manufacturing technologies using fuzzy benefit/cost ratio analysis
by Kahraman, Cengiz & Tolga, Ethem & Ulukan, Ziya
- 53-57 Solvable cases of permutation flowshop scheduling with dominating machines
by Xiang, S. & Tang, G. & Cheng, T. C. E.
- 59-66 Optimal payment time for a retailer under permitted delay of payment by the wholesaler
by Jamal, A. M. M. & Sarker, Bhaba R. & Wang, Shaojun
- 67-76 A negotiation aid for fixed-quantity contracts with stochastic demand and production
by Grossman, Thomas Jr. & Rohleder, Thomas R. & A. Silver, Edward
- 77-96 Market-driven product and service design: Bridging the gap between customer needs, quality management, and customer satisfaction
by Herrmann, Andreas & Huber, Frank & Braunstein, Christine
May 2000, Volume 65, Issue 3
- 229-242 Determining the optimal target for a process with multiple markets and variable holding costs
by Shao, Yuehjen E. & Fowler, John W. & Runger, George C.
- 243-255 Manufacturing practices and performance: Comparisons between Australia and New Zealand
by Samson, Danny & Ford, Steve
- 257-274 The difference between the managerial and mathematical interpretation of sensitivity analysis results in linear programming
by Koltai, Tamas & Terlaky, Tamas
- 275-287 Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
by Gharbi, A. & Kenne, J. P.
- 289-294 A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs
by Schniederjans, Marc J. & Cao, Qing
- 295-303 The manufacturing of heavy weight cardboard
by Sierksma, Gerard & Wanders, Henrico L. T.
- 305-315 An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment
by Hoque, M. A. & Goyal, S. K.
April 2000, Volume 65, Issue 2
- 125-139 A two machine bicriteria scheduling problem
by Sarin, Subhash C. & Hariharan, R.
- 141-171 Optimal procurement policies under price-dependent demand
by Polatoglu, Hakan & Sahin, Izzet
- 173-178 Seasonality and the production-smoothing model
by Gorman, Michael F. & Brannon, James I.
- 179-190 Supply chain management: A strategic issue in engineer to order manufacturing
by Hicks, C. & McGovern, T. & Earl, C. F.
- 191-199 An extended Fare-Lovell technical efficiency measure
by Briec, W.
- 201-216 Optimal ordering, discounting, and pricing in the single-period problem
by Khouja, Moutaz J.
- 217-224 EOQ and inflation uncertainty
by Horowitz, Ira
April 2000, Volume 65, Issue 1
- 5-15 Britain's last industrial district? A case study of ceramics production
by Day, Marc & Burnett, John & L Forrester, Paul & Hassard, John
- 17-32 The production planning process for a network of firms in the textile-apparel industry
by De Toni, Alberto & Meneghetti, Antonella
- 33-42 Strategies for managing the teamworking agenda: Developing a methodology for team-based organisation
by Tranfield, David & Smith, Stuart & Foster, Morris & Wilson, Sarah & Ivor Parry
- 43-54 Can support systems adversely affect cell performance?
by Dickens, A. & Baber, C.
- 55-72 Manufacturing strategy analysis and manufacturing information system design: Process and application
by Wu, Bin & Ellis, Ray
- 73-84 The development of intelligent decision support tools to aid the design of flexible manufacturing systems
by Chan, Felix T. S. & Jiang, Bing & Tang, Nelson K. H.
- 85-98 Technological innovation antecedents in the UK ceramics industry
by Warren, Matthew P. & Forrester, Paul L. & Hassard, John S. & Cotton, John W.
- 99-110 Mass customisation -- an automotive perspective
by Alford, Dave & Sackett, Peter & Nelder, Geoff
- 111-120 Focusing customer demand through manufacturing supply chains by the use of customer focused cells: An appraisal
by Griffiths, John & James, Richard & Kempson, John
March 2000, Volume 64, Issue 1-3
- 1-9 Lot-sizing problem with setup times in labor-based capacity production systems
by Aghezzaf, El-Houssaine
- 11-19 Maximizing benefits in short-term planning in bottle-glass industry
by Richard, Pascal & Proust, Christian
- 21-36 The overlapping production planning: A new approach of bounded capacity management
by Bahroun, Z. & Campagne, J. -P. & Moalla, M.
- 37-48 Co-operative production planning for small- and medium-sized enterprises
by Mezgar, Istvan & Kovacs, Gyorgy L. & Paganelli, Paolo
- 49-58 An LP-based approach for loading and routing in a flexible assembly line
by Sawik, Tadeusz
- 59-64 Economic production quantity model for items with imperfect quality
by Salameh, M. K. & Jaber, M. Y.
- 65-78 A cooperative production planning method in the field of continuous process plants
by Resteanu, Cornel & Filip, Florin-Gheorghe & Stanescu, Sorin & Ionescu, Cezar
- 79-90 Developing manufacturing management strategies: Influence of technology and other issues
by Banerjee, S. K.
- 91-100 Flow simulation and genetic algorithm as optimization tools
by Fontanili, F. & Vincent, A. & Ponsonnet, R.
- 101-111 Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
by Botta-Genoulaz, Valerie
- 113-125 A branch-and-bound algorithm for the hybrid flowshop
by Moursli, O. & Pochet, Y.
- 127-141 Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies
by Kolisch, R.
- 143-152 A two-phase heuristic approach to the permutation flow-shop scheduling problem
by Suliman, S. M. A.
- 153-164 Optimal start times under stochastic activity durations
by Elmaghraby, S. E. & Ferreira, A. A. & Tavares, L. V.
- 165-176 A new heuristic based on a hypergraph representation for the tool switching problem
by Djellab, Housni & Djellab, Khaled & Gourgand, Michel
- 177-186 Spatial decomposition for a multi-facility production and distribution problem
by Dhaenens-Flipo, Clarisse
- 187-195 An exact method for cost-oriented assembly line balancing
by Amen, Matthias
- 197-208 Measuring the performance of lot-sizing techniques in uncertain environments
by Jeunet, Jully & Jonard, Nicolas
- 209-218 Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems
by Devise, Olivier & Pierreval, Henri
- 219-229 Performance evaluation and design of a CONWIP system with inspections
by Duri, Christelle & Frein, Yannick & Lee, Hyo-Seong
- 231-241 Quantitative models for performance measurement system
by Suwignjo, P. & Bititci, U. S & Carrie, A. S
- 243-255 Work-force management in automated assembly systems
by Croci, F. & Perona, M. & Pozzetti, A.
- 257-265 Customer order lead times for production based on lead time and tardiness costs
by Bertrand, J. W. M. & van Ooijen, H. P. G.
- 267-278 Cell formation using evolutionary algorithms with certain constraints
by Plaquin, Marie-France & Pierreval, Henri
- 279-284 Cell formation with alternative process plans and machine capacity constraints: A new combined approach
by Caux, C. & Bruniaux, R. & Pierreval, H.
- 285-293 Modeling and simulation of the control framework on a flexible manufacturing system
by Gertosio, C. & Mebarki, N. & Dussauchoy, A.
- 295-309 Experiences with a concurrent engineering self-assessment tool
by Landeghem, Rik Van
- 311-318 A concurrent engineering approach to chemical process design
by Herder, Paulien M. & Weijnen, Margot P. C.
- 319-329 The selection of information systems for production management: An evolving problem
by Beach, R. & Muhlemann, A. P. & Price, D. H. R. & Paterson, A. & Sharp, J. A.