Parametric analysis of setup cost in the economic lot-sizing model without speculative motives
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- van Hoesel, Stan & Wagelmans, Albert, 1991. "A note on `Stability of the constant cost dynamic lot size model' by K. Richter," European Journal of Operational Research, Elsevier, vol. 55(1), pages 112-114, November.
- Richter, Knut, 1994. "Sequential stability of the constant cost dynamic lot size model," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 359-363, June.
- van Hoesel, Stan & Wagelmans, Albert & Moerman, Bram, 1994. "Using geometric techniques to improve dynamic programming algorithms for the economic lot-sizing problem and extensions," European Journal of Operational Research, Elsevier, vol. 75(2), pages 312-331, June.
- Willard I. Zangwill, 1987. "Eliminating Inventory in a Series Facility Production System," Management Science, INFORMS, vol. 33(9), pages 1150-1164, September.
- Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Richter, Knut, 1987. "Stability of the constant cost dynamic lot size model," European Journal of Operational Research, Elsevier, vol. 31(1), pages 61-65, July.
- Suresh Chand & Suresh P. Sethi, 1990. "A Dynamic Lot Sizing Model with Learning in Setups," Operations Research, INFORMS, vol. 38(4), pages 644-655, August.
- Awi Federgruen & Michal Tzur, 1991. "A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time," Management Science, INFORMS, vol. 37(8), pages 909-925, August.
- Chand, Suresh & Voros, Jozsef, 1992. "Setup cost stability region for the dynamic lot sizing problem with backlogging," European Journal of Operational Research, Elsevier, vol. 58(1), pages 68-77, April.
- Alok Aggarwal & James K. Park, 1993. "Improved Algorithms for Economic Lot Size Problems," Operations Research, INFORMS, vol. 41(3), pages 549-571, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
- van den Heuvel, Wilco & Wagelmans, Albert P.M., 2006.
"A polynomial time algorithm for a deterministic joint pricing and inventory model,"
European Journal of Operational Research, Elsevier, vol. 170(2), pages 463-480, April.
- van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Polynomial Time Algorithm for a Deterministic Joint Pricing and Inventory Model," ERIM Report Series Research in Management ERS-2003-065-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Mobini, Zahra & van den Heuvel, Wilco & Wagelmans, Albert, 2019.
"Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information,"
European Journal of Operational Research, Elsevier, vol. 277(2), pages 542-560.
- Mobini, Z. & van den Heuvel, W. & Wagelmans, A.P.M., 2014. "Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information," Econometric Institute Research Papers EI2014-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2019.
"Two-echelon lot-sizing with asymmetric information and continuous type space,"
Omega, Elsevier, vol. 87(C), pages 158-176.
- Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2018. "Two-Echelon Lot-Sizing with Asymmetric Information and Continuous Type Space," Econometric Institute Research Papers EI2018-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- H. Edwin Romeijn & Dolores Romero Morales & Wilco Van den Heuvel, 2014. "Computational complexity of finding Pareto efficient outcomes for biobjective lot‐sizing models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(5), pages 386-402, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
- Hark‐Chin Hwang & Wilco van den Heuvel, 2012.
"Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging,"
Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(3‐4), pages 244-253, April.
- Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
- Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
- Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
- van den Heuvel, W.J. & Wagelmans, A.P.M., 2003.
"A geometric algorithm to solve the NI/G/NI/ND capacitated lot-sizing problem in O(T2) time,"
Econometric Institute Research Papers
EI 2003-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Geometric Algorithm to solve the NI/G/NI/ND Capacitated Lot-Sizing Problem in O(T^2) Time," ERIM Report Series Research in Management ERS-2003-066-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Hwang, H.C., 2009. "Economic Lot-Sizing Problem with Bounded Inventory and Lost-Sales," Econometric Institute Research Papers EI 2009-01, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- VAN VYVE, Mathieu & WOLSEY, Laurence & YAMAN, Hande, 2012. "Relaxations for two-level multi-item lot-sizing problem," LIDAM Discussion Papers CORE 2012031, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Hwang, Hark-Chin & Kang, Jangha, 2021. "An improved algorithm for the lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 100(C).
- Hwang, Hark-Chin & Kang, Jangha, 2016. "Two-phase algorithm for the lot-sizing problem with backlogging for stepwise transportation cost without speculative motives," Omega, Elsevier, vol. 59(PB), pages 238-250.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
- Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
- Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Martel, Alain & Gascon, Andre, 1998. "Dynamic lot-sizing with price changes and price-dependent holding costs," European Journal of Operational Research, Elsevier, vol. 111(1), pages 114-128, November.
- Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
- Herbert Meyr & Mirko Kiel, 2022. "Minimizing setups and waste when printing labels of consumer goods," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(3), pages 733-761, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:66:y:2000:i:1:p:13-22. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.