IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v65y2000i2p125-139.html
   My bibliography  Save this article

A two machine bicriteria scheduling problem

Author

Listed:
  • Sarin, Subhash C.
  • Hariharan, R.

Abstract

No abstract is available for this item.

Suggested Citation

  • Sarin, Subhash C. & Hariharan, R., 2000. "A two machine bicriteria scheduling problem," International Journal of Production Economics, Elsevier, vol. 65(2), pages 125-139, April.
  • Handle: RePEc:eee:proeco:v:65:y:2000:i:2:p:125-139
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(99)00050-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. רבקה פריאור, 1990. "מקבלי דמי פגיעה, 1988," Working Papers 553, National Insurance Institute of Israel.
    2. אסתר טולידנו, 1990. "מקבלי דמי אבטלה בשנת 1989," Working Papers 452, National Insurance Institute of Israel.
    3. מחקר - ביטוח לאומי, 1990. "גיליון 35 - תש"נ, יוני 1990," Working Papers 1126, National Insurance Institute of Israel.
    4. Rosser T. Nelson & Rakesh K. Sarin & Richard L. Daniels, 1986. "Scheduling with Multiple Performance Measures: The One-Machine Case," Management Science, INFORMS, vol. 32(4), pages 464-479, April.
    5. Dileepan, P & Sen, T, 1988. "Bicriterion static scheduling research for a single machine," Omega, Elsevier, vol. 16(1), pages 53-59.
    6. Cenna, Ahmed Abu & Tabucanon, Mario T., 1991. "Bicriterion scheduling problem in a job shop with parallel processors," International Journal of Production Economics, Elsevier, vol. 25(1-3), pages 95-101.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
    2. Subhash C. Sarin & Divya Prakash, 2004. "Equal Processing Time Bicriteria Scheduling on Parallel Machines," Journal of Combinatorial Optimization, Springer, vol. 8(3), pages 227-240, September.
    3. Haral, Uday & Chen, Rew-Win & Ferrell, William Jr & Kurz, Mary Beth, 2007. "Multiobjective single machine scheduling with nontraditional requirements," International Journal of Production Economics, Elsevier, vol. 106(2), pages 574-584, April.
    4. Berghman, Lotte & Leus, Roel, 2015. "Practical solutions for a dock assignment problem with trailer transportation," European Journal of Operational Research, Elsevier, vol. 246(3), pages 787-799.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
    2. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    3. Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
    4. Kim, Bowon, 1998. "Optimal development of production technology when autonomous and induced learning are present," International Journal of Production Economics, Elsevier, vol. 55(1), pages 39-52, June.
    5. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    6. Klein, M., 1995. "Integrated coordination in cooperative design," International Journal of Production Economics, Elsevier, vol. 38(1), pages 85-102, March.
    7. Olorunniwo, Festus & Udo, Godwin, 2002. "The impact of management and employees on cellular manufacturing implementation," International Journal of Production Economics, Elsevier, vol. 76(1), pages 27-38, March.
    8. Bal, F. & Button, K. J. & Nijkamp, P., 2002. "Ceteris paribus, meta-analysis and value transfer," Socio-Economic Planning Sciences, Elsevier, vol. 36(2), pages 127-138, June.
    9. Cote, Murray J., 1999. "Patient flow and resource utilization in an outpatient clinic," Socio-Economic Planning Sciences, Elsevier, vol. 33(3), pages 231-245, September.
    10. Manthou, Vassiliki & Vlachopoulou, Maro, 2001. "Bar-code technology for inventory and marketing management systems: A model for its development and implementation," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 157-164, May.
    11. Saydam, Cem & Aytug, Haldun, 2003. "Accurate estimation of expected coverage: revisited," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 69-80, March.
    12. Nyerges, Richard T., 1996. "The new management paradigm: An extension through the IFAM perspective," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 203-214, August.
    13. Pollatschek, M. A., 1997. "Design of a simulation library for CIM," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 99-107, August.
    14. Kavusturucu, Ayse & Gupta, Surendra M., 1999. "Manufacturing systems with machine vacations, arbitrary topology and finite buffers," International Journal of Production Economics, Elsevier, vol. 58(1), pages 1-15, January.
    15. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
    16. Hempel, Paul S., 1996. "Human-resource-based models of production systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 239-249, June.
    17. Fawcett, Stanley E. & Calantone, Roger & Smith, Sheldon R., 1997. "Delivery capability and firm performance in international operations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 191-204, September.
    18. Chu, Chengbin & Proth, Jean-Marie & Wolff, Philippe, 1998. "Predictive maintenance: The one-unit replacement model," International Journal of Production Economics, Elsevier, vol. 54(3), pages 285-295, May.
    19. Eberts, Ray & Habibi, Shidan, 1995. "Neural network-based agents for integrating information for production systems," International Journal of Production Economics, Elsevier, vol. 38(1), pages 73-84, March.
    20. Nilsson, Carl-Henric, 1997. "Strategic alliances, trick or treat? the case of Scania," International Journal of Production Economics, Elsevier, vol. 52(1-2), pages 147-160, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:65:y:2000:i:2:p:125-139. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.