IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v83y1995i3p594-620.html
   My bibliography  Save this item

Grey integer programming: An application to waste management planning under uncertainty

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Chen, W.T. & Li, Y.P. & Huang, G.H. & Chen, X. & Li, Y.F., 2010. "A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty," Applied Energy, Elsevier, vol. 87(3), pages 1033-1047, March.
  2. Li, Y.P. & Huang, G.H. & Chen, X., 2011. "An interval-valued minimax-regret analysis approach for the identification of optimal greenhouse-gas abatement strategies under uncertainty," Energy Policy, Elsevier, vol. 39(7), pages 4313-4324, July.
  3. Figueroa–García, Juan Carlos & Hernández, Germán & Franco, Carlos, 2022. "A review on history, trends and perspectives of fuzzy linear programming," Operations Research Perspectives, Elsevier, vol. 9(C).
  4. Wu, Chia-Chin & Chang, Ni-Bin, 2004. "Corporate optimal production planning with varying environmental costs: A grey compromise programming approach," European Journal of Operational Research, Elsevier, vol. 155(1), pages 68-95, May.
  5. Dufeng Li & Yang Zhang & Xianen Wang & Yu Li & Wenjin Zhao, 2012. "An Optimization Model of Carbon Sinks in CDM Forestry Projects Based on Interval Linear Programming," Energies, MDPI, vol. 5(6), pages 1-16, June.
  6. Dianzheng Fu & Tianji Yang & Yize Huang & Yiming Tong, 2022. "Integrated Optimization for Biofuel Management Associated with a Biomass-Penetrated Heating System under Multiple and Compound Uncertainties," Energies, MDPI, vol. 15(15), pages 1-21, July.
  7. Piao, M.J. & Li, Y.P. & Huang, G.H. & Nie, S., 2015. "Risk analysis for Shanghai's electric power system under multiple uncertainties," Energy, Elsevier, vol. 87(C), pages 104-119.
  8. Tian, Chuyin & Huang, Guohe & Xie, Yulei, 2021. "Systematic evaluation for hydropower exploitation rationality in hydro-dominant area: A case study of Sichuan Province, China," Renewable Energy, Elsevier, vol. 168(C), pages 1096-1111.
  9. Mavrotas, George & Gakis, Nikos & Skoulaxinou, Sotiria & Katsouros, Vassilis & Georgopoulou, Elena, 2015. "Municipal solid waste management and energy production: Consideration of external cost through multi-objective optimization and its effect on waste-to-energy solutions," Renewable and Sustainable Energy Reviews, Elsevier, vol. 51(C), pages 1205-1222.
  10. Huang, G. H. & Baetz, B. W. & Patry, G. G., 1997. "A response to "A comment on 'Grey integer programming: An application to waste management planning under uncertainty"' by Larry Jenkins," European Journal of Operational Research, Elsevier, vol. 100(3), pages 638-641, August.
  11. Dong, C. & Huang, G.H. & Cai, Y.P. & Xu, Y., 2011. "An interval-parameter minimax regret programming approach for power management systems planning under uncertainty," Applied Energy, Elsevier, vol. 88(8), pages 2835-2845, August.
  12. Zhou, Feng & Huang, Gordon H. & Chen, Guo-Xian & Guo, Huai-Cheng, 2009. "Enhanced-interval linear programming," European Journal of Operational Research, Elsevier, vol. 199(2), pages 323-333, December.
  13. Cai, Y.P. & Huang, G.H. & Yang, Z.F. & Lin, Q.G. & Tan, Q., 2009. "Community-scale renewable energy systems planning under uncertainty--An interval chance-constrained programming approach," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(4), pages 721-735, May.
  14. Zhu, Y. & Li, Y.P. & Huang, G.H. & Fan, Y.R. & Nie, S., 2015. "A dynamic model to optimize municipal electric power systems by considering carbon emission trading under uncertainty," Energy, Elsevier, vol. 88(C), pages 636-649.
  15. Chen, Yizhong & Lu, Hongwei & Li, Jing & Huang, Guohe & He, Li, 2016. "Regional planning of new-energy systems within multi-period and multi-option contexts: A case study of Fengtai, Beijing, China," Renewable and Sustainable Energy Reviews, Elsevier, vol. 65(C), pages 356-372.
  16. Bai, Chunguang & Sarkis, Joseph, 2010. "Integrating sustainability into supplier selection with grey system and rough set methodologies," International Journal of Production Economics, Elsevier, vol. 124(1), pages 252-264, March.
  17. Belien, Jeroen & De Boeck, Liesje & Van Ackere, Jonas, 2011. "Municipal Solid Waste Collection Problems: A Literature Review," Working Papers 2011/34, Hogeschool-Universiteit Brussel, Faculteit Economie en Management.
  18. Dou, Yijie & Zhu, Qinghua & Sarkis, Joseph, 2014. "Evaluating green supplier development programs with a grey-analytical network process-based methodology," European Journal of Operational Research, Elsevier, vol. 233(2), pages 420-431.
  19. Yan Han & Yue-Fei Huang & Guang-Qian Wang & Imran Maqsood, 2011. "A Multi-objective Linear Programming Model with Interval Parameters for Water Resources Allocation in Dalian City," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 25(2), pages 449-463, January.
  20. Zhu, Y. & Li, Y.P. & Huang, G.H. & Fu, D.Z., 2013. "Modeling for planning municipal electric power systems associated with air pollution control – A case study of Beijing," Energy, Elsevier, vol. 60(C), pages 168-186.
  21. Liang, M.S. & Huang, G.H. & Chen, J.P. & Li, Y.P., 2022. "Development of non-deterministic energy-water-carbon nexus planning model: A case study of Shanghai, China," Energy, Elsevier, vol. 246(C).
  22. Zhang, Xinyi & Zhu, Qiande & Zhai, Aifeng & Ding, Xiaowen, 2022. "Development of interval transient pollution distribution model and its application in the Fenghuangshan drinking water source," Ecological Modelling, Elsevier, vol. 471(C).
  23. Liu, Y. & Huang, G.H. & Cai, Y.P. & Cheng, G.H. & Niu, Y.T. & An, K., 2009. "Development of an inexact optimization model for coupled coal and power management in North China," Energy Policy, Elsevier, vol. 37(11), pages 4345-4363, November.
  24. Min Zhou & Shasha Lu & Shukui Tan & Danping Yan & Guoliang Ou & Dianfeng Liu & Xiang Luo & Yanan Li & Lu Zhang & Zuo Zhang & Xiangbo Zhu, 2017. "A stochastic equilibrium chance-constrained programming model for municipal solid waste management of the City of Dalian, China," Quality & Quantity: International Journal of Methodology, Springer, vol. 51(1), pages 199-218, January.
  25. H. Mishmast Nehi & H. A. Ashayerinasab & M. Allahdadi, 2020. "Solving methods for interval linear programming problem: a review and an improved method," Operational Research, Springer, vol. 20(3), pages 1205-1229, September.
  26. Li, Jiang & Song, Jian & Li, Mo & Shang, Songhao & Mao, Xiaomin & Yang, Jian & Adeloye, Adebayo J., 2018. "Optimization of irrigation scheduling for spring wheat based on simulation-optimization model under uncertainty," Agricultural Water Management, Elsevier, vol. 208(C), pages 245-260.
  27. Hu, Qing & Huang, Guohe & Cai, Yanpeng & Huang, Ying, 2011. "Feasibility-based inexact fuzzy programming for electric power generation systems planning under dual uncertainties," Applied Energy, Elsevier, vol. 88(12), pages 4642-4654.
  28. Ren, Jingzheng & Liang, Hanwei & Dong, Liang & Gao, Zhiqiu & He, Chang & Pan, Ming & Sun, Lu, 2017. "Sustainable development of sewage sludge-to-energy in China: Barriers identification and technologies prioritization," Renewable and Sustainable Energy Reviews, Elsevier, vol. 67(C), pages 384-396.
  29. Panagiotis Kontogiorgos & Nikolaos Chrysanthopoulos & George P. Papavassilopoulos, 2018. "A Mixed-Integer Programming Model for Assessing Energy-Saving Investments in Domestic Buildings under Uncertainty," Energies, MDPI, vol. 11(4), pages 1-14, April.
  30. Amin Mahmoudi & Xiaopeng Deng & Saad Ahmed Javed & Na Zhang, 2021. "Sustainable Supplier Selection in Megaprojects: Grey Ordinal Priority Approach," Business Strategy and the Environment, Wiley Blackwell, vol. 30(1), pages 318-339, January.
  31. Qin, X.S. & Huang, G.H. & Zeng, G.M. & Chakma, A. & Huang, Y.F., 2007. "An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1331-1357, August.
  32. Y. Li & G. Huang & S. Nie, 2009. "Water Resources Management and Planning under Uncertainty: an Inexact Multistage Joint-Probabilistic Programming Method," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(12), pages 2515-2538, September.
  33. Xu, Y. & Huang, G.H. & Qin, X.S. & Cao, M.F., 2009. "SRCCP: A stochastic robust chance-constrained programming model for municipal solid waste management under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 53(6), pages 352-363.
  34. ZhenFang Liu & GuoHe Huang, 2009. "Dual-Interval Two-Stage Optimization for Flood Management and Risk Analyses," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(11), pages 2141-2162, September.
  35. Gaiqiang Yang & Ping Guo & Mo Li & Shiqi Fang & Liudong Zhang, 2016. "An Improved Solving Approach for Interval-Parameter Programming and Application to an Optimal Allocation of Irrigation Water Problem," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(2), pages 701-729, January.
  36. Dong, C. & Huang, G.H. & Cai, Y.P. & Liu, Y., 2012. "An inexact optimization modeling approach for supporting energy systems planning and air pollution mitigation in Beijing city," Energy, Elsevier, vol. 37(1), pages 673-688.
  37. Maqsood, Imran & Huang, Guo H. & Scott Yeomans, Julian, 2005. "An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty," European Journal of Operational Research, Elsevier, vol. 167(1), pages 208-225, November.
  38. Li, Y.P. & Huang, G.H. & Nie, S.L. & Qin, X.S., 2007. "ITCLP: An inexact two-stage chance-constrained program for planning waste management systems," Resources, Conservation & Recycling, Elsevier, vol. 49(3), pages 284-307.
  39. Li, Y.P. & Huang, G.H. & Zhang, N. & Nie, S.L., 2011. "An inexact-stochastic with recourse model for developing regional economic-ecological sustainability under uncertainty," Ecological Modelling, Elsevier, vol. 222(2), pages 370-379.
  40. Yang Zhang & Jing Shen, 2021. "Wetland Restoration Planning Approach Based on Interval Fuzzy Linear Programming under Uncertainty," IJERPH, MDPI, vol. 18(18), pages 1-14, September.
  41. Zhang, J.L. & Li, Y.P. & Wang, C.X. & Huang, G.H., 2015. "An inexact simulation-based stochastic optimization method for identifying effluent trading strategies of agricultural nonpoint sources," Agricultural Water Management, Elsevier, vol. 152(C), pages 72-90.
  42. Shaban Boloukat, Mohammad Hadi & Akbari Foroud, Asghar, 2016. "Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming," Energy, Elsevier, vol. 113(C), pages 776-787.
  43. Zhu, Y. & Wei, Z. & Li, Y.X. & Du, H.X. & Guo, Y., 2022. "Energy and atmosphere system planning of coal-dependent cities based on an interval minimax-regret coupled joint-probabilistic cost-benefit approach," Energy, Elsevier, vol. 239(PB).
  44. David Rosenberg & Jay Lund, 2009. "Modeling Integrated Decisions for a Municipal Water System with Recourse and Uncertainties: Amman, Jordan," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(1), pages 85-115, January.
  45. Gaiqiang Yang & Ping Guo & Mo Li & Shiqi Fang & Liudong Zhang, 2016. "An Improved Solving Approach for Interval-Parameter Programming and Application to an Optimal Allocation of Irrigation Water Problem," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(2), pages 701-729, January.
  46. Zhou, Yang & Huang, Guo H. & Yang, Boting, 2013. "Water resources management under multi-parameter interactions: A factorial multi-stage stochastic programming approach," Omega, Elsevier, vol. 41(3), pages 559-573.
  47. He, Li & Huang, Guo H. & Lu, Hongwei, 2011. "Bivariate interval semi-infinite programming with an application to environmental decision-making analysis," European Journal of Operational Research, Elsevier, vol. 211(3), pages 452-465, June.
  48. Chunguang Bai & Joseph Sarkis, 2013. "Green information technology strategic justification and evaluation," Information Systems Frontiers, Springer, vol. 15(5), pages 831-847, November.
  49. Luqing Zhang & Aikang Chen & Han Gu & Xitian Wang & Da Xie & Chenghong Gu, 2019. "Planning of the Multi-Energy Circular System Coupled with Waste Processing Base: A Case from China," Energies, MDPI, vol. 12(20), pages 1-17, October.
  50. Li, Y.F. & Li, Y.P. & Huang, G.H. & Chen, X., 2010. "Energy and environmental systems planning under uncertainty--An inexact fuzzy-stochastic programming approach," Applied Energy, Elsevier, vol. 87(10), pages 3189-3211, October.
  51. Huang, G. H. & Baetz, B. W. & Patry, G. G., 1995. "Grey fuzzy integer programming: An application to regional waste management planning under uncertainty," Socio-Economic Planning Sciences, Elsevier, vol. 29(1), pages 17-38, March.
  52. Majdi Argoubi & Haifa Jammeli & Hatem Masri, 2020. "The intellectual structure of the waste management field," Annals of Operations Research, Springer, vol. 294(1), pages 655-676, November.
  53. Chen, Ho-Wen & Ning, Shu-Kuang & Yu, Ruey-Fang & Chen, Jeng-Chung, 2010. "Optimal safe groundwater yield for land conservation in a seashore area under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 54(8), pages 481-488.
  54. Yong Zeng & Yanpeng Cai & Guohe Huang & Jing Dai, 2011. "A Review on Optimization Modeling of Energy Systems Planning and GHG Emission Mitigation under Uncertainty," Energies, MDPI, vol. 4(10), pages 1-33, October.
  55. Wu, C. C. & Chang, N. B., 2003. "Grey input-output analysis and its application for environmental cost allocation," European Journal of Operational Research, Elsevier, vol. 145(1), pages 175-201, February.
  56. Lv, Y. & Yan, X.D. & Sun, W. & Gao, Z.Y., 2015. "A risk-based method for planning of bus–subway corridor evacuation under hybrid uncertainties," Reliability Engineering and System Safety, Elsevier, vol. 139(C), pages 188-199.
  57. Li, M.W. & Li, Y.P. & Huang, G.H., 2011. "An interval-fuzzy two-stage stochastic programming model for planning carbon dioxide trading under uncertainty," Energy, Elsevier, vol. 36(9), pages 5677-5689.
  58. Zhou, Y. & Li, Y.P. & Huang, G.H., 2015. "Planning sustainable electric-power system with carbon emission abatement through CDM under uncertainty," Applied Energy, Elsevier, vol. 140(C), pages 350-364.
  59. Wu, X.Y. & Huang, G.H. & Liu, L. & Li, J.B., 2006. "An interval nonlinear program for the planning of waste management systems with economies-of-scale effects--A case study for the region of Hamilton, Ontario, Canada," European Journal of Operational Research, Elsevier, vol. 171(2), pages 349-372, June.
  60. Li, Y.F. & Huang, G.H. & Li, Y.P. & Xu, Y. & Chen, W.T., 2010. "Regional-scale electric power system planning under uncertainty--A multistage interval-stochastic integer linear programming approach," Energy Policy, Elsevier, vol. 38(1), pages 475-490, January.
  61. Dong, Cong & Huang, Guohe & Cai, Yanpeng & Li, Wei & Cheng, Guanhui, 2014. "Fuzzy interval programming for energy and environmental systems management under constraint-violation and energy-substitution effects: A case study for the City of Beijing," Energy Economics, Elsevier, vol. 46(C), pages 375-394.
  62. Lin, Q.G. & Huang, G.H. & Bass, B. & Qin, X.S., 2009. "IFTEM: An interval-fuzzy two-stage stochastic optimization model for regional energy systems planning under uncertainty," Energy Policy, Elsevier, vol. 37(3), pages 868-878, March.
  63. Ji, Ling & Huang, Guo-He & Xie, Yu-Lei & Niu, Dong-Xiao & Song, Yi-Hang, 2017. "Explicit cost-risk tradeoff for renewable portfolio standard constrained regional power system expansion: A case study of Guangdong Province, China," Energy, Elsevier, vol. 131(C), pages 125-136.
  64. Zhu, Y. & Huang, G.H. & Li, Y.P. & He, L. & Zhang, X.X., 2011. "An interval full-infinite mixed-integer programming method for planning municipal energy systems - A case study of Beijing," Applied Energy, Elsevier, vol. 88(8), pages 2846-2862, August.
  65. Natnael Nigussie Goshu & Surafel Luleseged Tilahun, 2016. "Grey theory to predict Ethiopian foreign currency exchange rate," International Journal of Business Forecasting and Marketing Intelligence, Inderscience Enterprises Ltd, vol. 2(2), pages 95-116.
  66. Mandal, Uday & Dhar, Anirban & Panda, Sudhindra N., 2021. "Enhancement of sustainable agricultural production system by integrated natural resources management framework under climatic and operational uncertainty," Agricultural Water Management, Elsevier, vol. 252(C).
  67. Weiwei Pan & Lirong Jian & Tao Liu, 2019. "Grey system theory trends from 1991 to 2018: a bibliometric analysis and visualization," Scientometrics, Springer;Akadémiai Kiadó, vol. 121(3), pages 1407-1434, December.
  68. Cai, Y.P. & Huang, G.H. & Tan, Q. & Yang, Z.F., 2011. "An integrated approach for climate-change impact analysis and adaptation planning under multi-level uncertainties. Part I: Methodology," Renewable and Sustainable Energy Reviews, Elsevier, vol. 15(6), pages 2779-2790, August.
  69. H. Zhu & G. Huang & P. Guo & X. Qin, 2009. "A Fuzzy Robust Nonlinear Programming Model for Stream Water Quality Management," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(14), pages 2913-2940, November.
  70. Chen, C. & Li, Y.P. & Huang, G.H., 2016. "Interval-fuzzy municipal-scale energy model for identification of optimal strategies for energy management – A case study of Tianjin, China," Renewable Energy, Elsevier, vol. 86(C), pages 1161-1177.
  71. Chen, M. J. & Huang, G. H., 2001. "A derivative algorithm for inexact quadratic program - application to environmental decision-making under uncertainty," European Journal of Operational Research, Elsevier, vol. 128(3), pages 570-586, February.
  72. Lin, Q.G. & Huang, G.H., 2009. "A dynamic inexact energy systems planning model for supporting greenhouse-gas emission management and sustainable renewable energy development under uncertainty--A case study for the City of Waterloo,," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(8), pages 1836-1853, October.
  73. Jeroen Beliën & Liesje De Boeck & Jonas Van Ackere, 2014. "Municipal Solid Waste Collection and Management Problems: A Literature Review," Transportation Science, INFORMS, vol. 48(1), pages 78-102, February.
  74. Sun, Y. & Huang, G.H. & Li, Y.P., 2010. "ICQSWM: An inexact chance-constrained quadratic solid waste management model," Resources, Conservation & Recycling, Elsevier, vol. 54(10), pages 641-657.
  75. Ye Liu & Guohe Huang & Yanpeng Cai & Cong Dong, 2011. "An Inexact Mix-Integer Two-Stage Linear Programming Model for Supporting the Management of a Low-Carbon Energy System in China," Energies, MDPI, vol. 4(10), pages 1-30, October.
  76. Huang, Y. & Li, Y.P. & Chen, X. & Ma, Y.G., 2012. "Optimization of the irrigation water resources for agricultural sustainability in Tarim River Basin, China," Agricultural Water Management, Elsevier, vol. 107(C), pages 74-85.
  77. Zhenfang Liu & Yang Zhou & Gordon Huang & Bin Luo, 2019. "Risk Aversion Based Inexact Stochastic Dynamic Programming Approach for Water Resources Management Planning under Uncertainty," Sustainability, MDPI, vol. 11(24), pages 1-22, December.
  78. Lei Jin & Guohe Huang & Yurui Fan & Xianghui Nie & Guanhui Cheng, 2012. "A Hybrid Dynamic Dual Interval Programming for Irrigation Water Allocation under Uncertainty," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 26(5), pages 1183-1200, March.
  79. Su, J. & Huang, G.H. & Xi, B.D. & Qin, X.S. & Huo, S.L. & Jiang, Y.H. & Chen, X.R., 2010. "Long-term panning of waste diversion under interval and probabilistic uncertainties," Resources, Conservation & Recycling, Elsevier, vol. 54(7), pages 449-461.
  80. Simic, Vladimir, 2015. "A two-stage interval-stochastic programming model for planning end-of-life vehicles allocation under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 98(C), pages 19-29.
  81. Hsu, Chaug-Ing & Wen, Yuh-Horng, 2000. "Application of Grey theory and multiobjective programming towards airline network design," European Journal of Operational Research, Elsevier, vol. 127(1), pages 44-68, November.
  82. Hanif Malekpoor & Konstantinos Chalvatzis & Nishikant Mishra & Mukesh Kumar Mehlawat & Dimitrios Zafirakis & Malin Song, 2018. "Integrated grey relational analysis and multi objective grey linear programming for sustainable electricity generation planning," Annals of Operations Research, Springer, vol. 269(1), pages 475-503, October.
  83. Zhu, H. & Huang, W.W. & Huang, G.H., 2014. "Planning of regional energy systems: An inexact mixed-integer fractional programming model," Applied Energy, Elsevier, vol. 113(C), pages 500-514.
  84. Wang, Shuping & Tan, Qian & Zhang, Tianyuan & Zhang, Tong, 2022. "Water management policy analysis: Insight from a calibration-based inexact programming method," Agricultural Water Management, Elsevier, vol. 269(C).
  85. Khalid Mekamcha & Mehdi Souier & Hakim Nadhir Bessenouci & Mohammed Bennekrouf, 2021. "Two metaheuristics approaches for solving the traveling salesman problem: an Algerian waste collection case," Operational Research, Springer, vol. 21(3), pages 1641-1661, September.
  86. Yanzheng Liu & Jicong Tan & Zhao Wei & Ying Zhu & Shiyu Chang & Yexin Li & Shaoyi Li & Yong Guo, 2024. "Analysis of Extreme Random Uncertainty in Energy and Environment Systems for Coal-Dependent City by a Copula-Based Interval Cost–Benefit Stochastic Approach," Sustainability, MDPI, vol. 16(2), pages 1-22, January.
  87. Cai, Yanpeng & Yue, Wencong & Xu, Linyu & Yang, Zhifeng & Rong, Qiangqiang, 2016. "Sustainable urban water resources management considering life-cycle environmental impacts of water utilization under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 108(C), pages 21-40.
  88. Mehdi Allahdadi & Aida Batamiz, 2021. "Generation of some methods for solving interval multi-objective linear programming models," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1077-1115, December.
  89. Cai, Y.P. & Huang, G.H. & Tan, Q. & Chen, B., 2011. "Identification of optimal strategies for improving eco-resilience to floods in ecologically vulnerable regions of a wetland," Ecological Modelling, Elsevier, vol. 222(2), pages 360-369.
  90. Li, Zhong & Huang, Gordon & Zhang, Yimei & Li, Yongping, 2013. "Inexact two-stage stochastic credibility constrained programming for water quality management," Resources, Conservation & Recycling, Elsevier, vol. 73(C), pages 122-132.
  91. Cai, Y.P. & Huang, G.H. & Yang, Z.F. & Tan, Q., 2009. "Identification of optimal strategies for energy management systems planning under multiple uncertainties," Applied Energy, Elsevier, vol. 86(4), pages 480-495, April.
  92. Cao, M.F. & Huang, G.H. & Lin, Q.G., 2010. "Integer programming with random-boundary intervals for planning municipal power systems," Applied Energy, Elsevier, vol. 87(8), pages 2506-2516, August.
  93. Li, Y.P. & Huang, G.H. & Nie, X.H. & Nie, S.L., 2008. "A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems," European Journal of Operational Research, Elsevier, vol. 189(2), pages 399-420, September.
  94. Chen, C. & Li, Y.P. & Huang, G.H. & Zhu, Y., 2012. "An inexact robust nonlinear optimization method for energy systems planning under uncertainty," Renewable Energy, Elsevier, vol. 47(C), pages 55-66.
  95. Shmelev, S.E. & Powell, J.R., 2006. "Ecological-economic modelling for strategic regional waste management systems," Ecological Economics, Elsevier, vol. 59(1), pages 115-130, August.
  96. Simic, Vladimir, 2016. "End-of-life vehicles allocation management under multiple uncertainties: An interval-parameter two-stage stochastic full-infinite programming approach," Resources, Conservation & Recycling, Elsevier, vol. 114(C), pages 1-17.
  97. Chen, J.P. & Huang, G. & Baetz, B.W. & Lin, Q.G. & Dong, C. & Cai, Y.P., 2018. "Integrated inexact energy systems planning under climate change: A case study of Yukon Territory, Canada," Applied Energy, Elsevier, vol. 229(C), pages 493-504.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.