IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v236y2021ics0925527321001055.html
   My bibliography  Save this article

Quality grading of returns and the dynamics of remanufacturing

Author

Listed:
  • Ponte, Borja
  • Cannella, Salvatore
  • Dominguez, Roberto
  • Naim, Mohamed M.
  • Syntetos, Aris A.

Abstract

We consider a hybrid manufacturing/remanufacturing system where the returned products (cores) are classified into different quality grades. Each grade requires different remanufacturing operations and thus lead times. We examine the implications of the quality-grading scheme on the dynamic behavior of closed-loop supply chains, benchmarking this against a typical system where all the returns undergo the same remanufacturing process. Through control engineering techniques, we evaluate the Bullwhip and inventory performance of the supply chain by observing the step response of the orders and net stocks (the shock lens), analyzing the frequency behavior of these signals (the filter lens), and measuring their dynamics due to stochastic demand (the variance lens). Subsequently, we discuss the operational savings and additional costs derived from quality grading. We find that the pre-sorting mechanism allows for smoothing the supply chain operations; however, its impact on customer satisfaction is ambivalent. Indeed, we observe that the documented ‘lead-time paradox’ of the remanufacturing process in hybrid systems results here in a ‘quality paradox’: lower quality returns may increase the performance of inventories. This affects particularly low-frequency demands. Importantly, we analytically derive the optimal setting of the closed-loop pipeline estimation in order-up-to policies for avoiding long-term inventory drifts. This analysis reveals key potential benefits of information transparency for improving the operational performance, and thus the environmental and economic sustainability, of closed-loop supply chains.

Suggested Citation

  • Ponte, Borja & Cannella, Salvatore & Dominguez, Roberto & Naim, Mohamed M. & Syntetos, Aris A., 2021. "Quality grading of returns and the dynamics of remanufacturing," International Journal of Production Economics, Elsevier, vol. 236(C).
  • Handle: RePEc:eee:proeco:v:236:y:2021:i:c:s0925527321001055
    DOI: 10.1016/j.ijpe.2021.108129
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527321001055
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2021.108129?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Christos Zikopoulos, 2017. "Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1565-1587, March.
    2. Giutini, Ron & Gaudette, Kevin, 2003. "Remanufacturing: The next great opportunity for boosting US productivity," Business Horizons, Elsevier, vol. 46(6), pages 41-48.
    3. Zhou, Li & Naim, Mohamed M. & Disney, Stephen M., 2017. "The impact of product returns and remanufacturing uncertainties on the dynamic performance of a multi-echelon closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 487-502.
    4. Thanos E. Goltsos & Borja Ponte & Shixuan Wang & Ying Liu & Mohamed M. Naim & Aris A. Syntetos, 2019. "The boomerang returns? Accounting for the impact of uncertainties on the dynamics of remanufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 57(23), pages 7361-7394, December.
    5. Ponte, Borja & Framinan, Jose M. & Cannella, Salvatore & Dominguez, Roberto, 2020. "Quantifying the Bullwhip Effect in closed-loop supply chains: The interplay of information transparencies, return rates, and lead times," International Journal of Production Economics, Elsevier, vol. 230(C).
    6. Yong Geng & Joseph Sarkis & Raimund Bleischwitz, 2019. "How to globalize the circular economy," Nature, Nature, vol. 565(7738), pages 153-155, January.
    7. James D. Abbey & V. Daniel R. Guide, 2018. "A typology of remanufacturing in closed-loop supply chains," International Journal of Production Research, Taylor & Francis Journals, vol. 56(1-2), pages 374-384, January.
    8. Mohannad Radhi & Guoqing Zhang, 2016. "Optimal configuration of remanufacturing supply network with return quality decision," International Journal of Production Research, Taylor & Francis Journals, vol. 54(5), pages 1487-1502, March.
    9. Inderfurth, Karl & van der Laan, Erwin, 2001. "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 381-390, May.
    10. Towill, Denis R. & Zhou, Li & Disney, Stephen M., 2007. "Reducing the bullwhip effect: Looking through the appropriate lens," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 444-453, July.
    11. Trapero, Juan R. & Kourentzes, N. & Fildes, R., 2012. "Impact of information exchange on supplier forecasting performance," Omega, Elsevier, vol. 40(6), pages 738-747.
    12. Isaksson, Olov H.D. & Seifert, Ralf W., 2016. "Quantifying the bullwhip effect using two-echelon data: A cross-industry empirical investigation," International Journal of Production Economics, Elsevier, vol. 171(P3), pages 311-320.
    13. Ponte, Borja & Naim, Mohamed M. & Syntetos, Aris A., 2019. "The value of regulating returns for enhancing the dynamic behaviour of hybrid manufacturing-remanufacturing systems," European Journal of Operational Research, Elsevier, vol. 278(2), pages 629-645.
    14. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    15. Luk N. Van Wassenhove, 2019. "Sustainable Innovation: Pushing the Boundaries of Traditional Operations Management," Production and Operations Management, Production and Operations Management Society, vol. 28(12), pages 2930-2945, December.
    16. R Teunter & E van der Laan & D Vlachos, 2004. "Inventory strategies for systems with fast remanufacturing," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(5), pages 475-484, May.
    17. Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
    18. Dadhich, P. & Genovese, A. & Kumar, N. & Acquaye, A., 2015. "Developing sustainable supply chains in the UK construction industry: A case study," International Journal of Production Economics, Elsevier, vol. 164(C), pages 271-284.
    19. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    20. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    21. Borja Ponte & Xun Wang & David de la Fuente & Stephen M. Disney, 2017. "Exploring nonlinear supply chains: the dynamics of capacity constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 4053-4067, July.
    22. V.L.M. Spiegler & A.T. Potter & M.M. Naim & D.R. Towill, 2016. "The value of nonlinear control theory in investigating the underlying dynamics and resilience of a grocery supply chain," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 265-286, January.
    23. Pazoki, Mostafa & Samarghandi, Hamed, 2020. "Take-back regulation: Remanufacturing or Eco-design?," International Journal of Production Economics, Elsevier, vol. 227(C).
    24. Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "Information sharing in supply chains with heterogeneous retailers," Omega, Elsevier, vol. 79(C), pages 116-132.
    25. Laurens G. Debo & L. Beril Toktay & Luk N. Van Wassenhove, 2005. "Market Segmentation and Product Technology Selection for Remanufacturable Products," Management Science, INFORMS, vol. 51(8), pages 1193-1205, August.
    26. Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
    27. Disney, S. M. & Towill, D. R., 2003. "On the bullwhip and inventory variance produced by an ordering policy," Omega, Elsevier, vol. 31(3), pages 157-167, June.
    28. Dev, Navin K. & Shankar, Ravi & Choudhary, Alok, 2017. "Strategic design for inventory and production planning in closed-loop hybrid systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 345-353.
    29. Disney, Stephen M. & Lambrecht, Marc R., 2008. "On Replenishment Rules, Forecasting, and the Bullwhip Effect in Supply Chains," Foundations and Trends(R) in Technology, Information and Operations Management, now publishers, vol. 2(1), pages 1-80, April.
    30. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2003. "Measuring and avoiding the bullwhip effect: A control theoretic approach," European Journal of Operational Research, Elsevier, vol. 147(3), pages 567-590, June.
    31. Genovese, Andrea & Acquaye, Adolf A. & Figueroa, Alejandro & Koh, S.C. Lenny, 2017. "Sustainable supply chain management and the transition towards a circular economy: Evidence and some applications," Omega, Elsevier, vol. 66(PB), pages 344-357.
    32. Disney, S. M. & Naim, M. M. & Potter, A., 2004. "Assessing the impact of e-business on supply chain dynamics," International Journal of Production Economics, Elsevier, vol. 89(2), pages 109-118, May.
    33. Panagiotidou, Sofia & Nenes, George & Zikopoulos, Christos & Tagaras, George, 2017. "Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality," European Journal of Operational Research, Elsevier, vol. 258(2), pages 537-551.
    34. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    35. Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2016. "Closed-loop supply chains: What reverse logistics factors influence performance?," International Journal of Production Economics, Elsevier, vol. 175(C), pages 35-49.
    36. Hosoda, Takamichi & Disney, Stephen M. & Gavirneni, Srinagesh, 2015. "The impact of information sharing, random yield, correlation, and lead times in closed loop supply chains," European Journal of Operational Research, Elsevier, vol. 246(3), pages 827-836.
    37. Disney, S.M. & Towill, D.R., 2005. "Eliminating drift in inventory and order based production control systems," International Journal of Production Economics, Elsevier, vol. 93(1), pages 331-344, January.
    38. Jeihoonian, Mohammad & Kazemi Zanjani, Masoumeh & Gendreau, Michel, 2017. "Closed-loop supply chain network design under uncertain quality status: Case of durable products," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 470-486.
    39. Dominguez, Roberto & Cannella, Salvatore & Ponte, Borja & Framinan, Jose M., 2020. "On the dynamics of closed-loop supply chains under remanufacturing lead time variability," Omega, Elsevier, vol. 97(C).
    40. Ullah, Mehran & Sarkar, Biswajit, 2020. "Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality," International Journal of Production Economics, Elsevier, vol. 219(C), pages 360-374.
    41. van der Laan, Erwin & Salomon, Marc & Dekker, Rommert, 1999. "An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies," European Journal of Operational Research, Elsevier, vol. 115(1), pages 195-214, May.
    42. Salvatore Cannella & Borja Ponte & Roberto Dominguez & Jose M. Framinan, 2021. "Proportional order-up-to policies for closed-loop supply chains: the dynamic effects of inventory controllers," International Journal of Production Research, Taylor & Francis Journals, vol. 59(11), pages 3323-3337, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhou, Qin & Meng, Chao & Sheu, Jiuh-Biing & Yuen, Kum Fai, 2023. "Remanufacturing mode and strategic decision: A game-theoretic approach," International Journal of Production Economics, Elsevier, vol. 260(C).
    2. Yang, Y. & Lin, J. & Hedenstierna, C.P.T. & Zhou, L., 2023. "The more the better? The impact of the number and location of product recovery options on the system dynamics in a closed-loop supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 175(C).
    3. Gunasekara, Lahiru & Robb, David J. & Zhang, Abraham, 2023. "Used product acquisition, sorting and disposition for circular supply chains: Literature review and research directions," International Journal of Production Economics, Elsevier, vol. 260(C).
    4. Ponte, Borja & Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2022. "The implications of batching in the bullwhip effect and customer service of closed-loop supply chains," International Journal of Production Economics, Elsevier, vol. 244(C).
    5. Duong, Quang Huy & Zhou, Li & Meng, Meng & Nguyen, Truong Van & Ieromonachou, Petros & Nguyen, Duy Tiep, 2022. "Understanding product returns: A systematic literature review using machine learning and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 243(C).
    6. Hong Sun & Yan Li, 2023. "Optimal Acquisition and Production Policies for Remanufacturing with Quality Grading," Mathematics, MDPI, vol. 11(7), pages 1-21, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ponte, Borja & Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2022. "The implications of batching in the bullwhip effect and customer service of closed-loop supply chains," International Journal of Production Economics, Elsevier, vol. 244(C).
    2. Ponte, Borja & Framinan, Jose M. & Cannella, Salvatore & Dominguez, Roberto, 2020. "Quantifying the Bullwhip Effect in closed-loop supply chains: The interplay of information transparencies, return rates, and lead times," International Journal of Production Economics, Elsevier, vol. 230(C).
    3. María Arquer & Borja Ponte & Raúl Pino, 2022. "Examining the balance between efficiency and resilience in closed-loop supply chains," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(4), pages 1307-1336, December.
    4. Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2021. "Remanufacturing configuration in complex supply chains," Omega, Elsevier, vol. 101(C).
    5. Lin, Junyi & Zhou, Li & Spiegler, Virginia L.M. & Naim, Mohamed M. & Syntetos, Aris, 2022. "Push or Pull? The impact of ordering policy choice on the dynamics of a hybrid closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 300(1), pages 282-295.
    6. Dominguez, Roberto & Cannella, Salvatore & Ponte, Borja & Framinan, Jose M., 2020. "On the dynamics of closed-loop supply chains under remanufacturing lead time variability," Omega, Elsevier, vol. 97(C).
    7. Ponte, Borja & Naim, Mohamed M. & Syntetos, Aris A., 2019. "The value of regulating returns for enhancing the dynamic behaviour of hybrid manufacturing-remanufacturing systems," European Journal of Operational Research, Elsevier, vol. 278(2), pages 629-645.
    8. Yang, Y. & Lin, J. & Hedenstierna, C.P.T. & Zhou, L., 2023. "The more the better? The impact of the number and location of product recovery options on the system dynamics in a closed-loop supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 175(C).
    9. Hosoda, Takamichi & Disney, Stephen M. & Zhou, Li, 2021. "The yield rate paradox in closed-loop supply chains," International Journal of Production Economics, Elsevier, vol. 239(C).
    10. Ponte, Borja & Puche, Julio & Rosillo, Rafael & de la Fuente, David, 2020. "The effects of quantity discounts on supply chain performance: Looking through the Bullwhip lens," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 143(C).
    11. Lin, Junyi & Huang, Hongfu & Li, Shanshan & Naim, Mohamed M., 2023. "On the dynamics of order pipeline inventory in a nonlinear order-up-to system," International Journal of Production Economics, Elsevier, vol. 266(C).
    12. Cannella, Salvatore & Dominguez, Roberto & Ponte, Borja & Framinan, Jose M., 2018. "Capacity restrictions and supply chain performance: Modelling and analysing load-dependent lead times," International Journal of Production Economics, Elsevier, vol. 204(C), pages 264-277.
    13. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    14. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    15. Lin, Junyi & Naim, Mohamed M. & Spiegler, Virginia L.M., 2020. "Delivery time dynamics in an assemble-to-order inventory and order based production control system," International Journal of Production Economics, Elsevier, vol. 223(C).
    16. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
    17. Dejian Yu & Zhaoping Yan, 2021. "Knowledge diffusion of supply chain bullwhip effect: main path analysis and science mapping analysis," Scientometrics, Springer;Akadémiai Kiadó, vol. 126(10), pages 8491-8515, October.
    18. Cannella, Salvatore & Framinan, Jose M. & Bruccoleri, Manfredi & Barbosa-Póvoa, Ana Paula & Relvas, Susana, 2015. "The effect of Inventory Record Inaccuracy in Information Exchange Supply Chains," European Journal of Operational Research, Elsevier, vol. 243(1), pages 120-129.
    19. Enrique Holgado de Frutos & Juan R Trapero & Francisco Ramos, 2020. "A literature review on operational decisions applied to collaborative supply chains," PLOS ONE, Public Library of Science, vol. 15(3), pages 1-28, March.
    20. Ciancimino, Elena & Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2012. "On the Bullwhip Avoidance Phase: The Synchronised Supply Chain," European Journal of Operational Research, Elsevier, vol. 221(1), pages 49-63.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:236:y:2021:i:c:s0925527321001055. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.