IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v175y2016icp35-49.html
   My bibliography  Save this article

Closed-loop supply chains: What reverse logistics factors influence performance?

Author

Listed:
  • Cannella, Salvatore
  • Bruccoleri, Manfredi
  • Framinan, Jose M.

Abstract

This paper analyses the inventory and order flow dynamics in closed-loop supply chains (CLSCs). In this kind of supply chains the reverse flow of materials entering the system for recycling purposes complicates the way in which inventories should be managed and replenishment policies should be designed. Specifically, we analyse the relationships between some reverse logistics’ factors (remanufacturing lead-time, return rate of recycled products, reverse order policy, and number of supply chain tiers) on the order and inventory variance amplification. We firstly perform a systematic literature review of the related studies. Secondly, by adopting a difference equation math approach and design of experiment we perform a robust what-if analysis of a CLSC under a variety of operational and market conditions. Results show that, ceteris paribus, CLSC outperforms a forward supply chain, both in mono-echelon and multi-echelon structures and under both stationary and turbulent market demands. Furthermore, reducing remanufacturing lead-time and promoting information transparency may be crucial to improve CLSC dynamics. Finally, we use the research findings to provide interesting managerial consideration about how to reduce unnecessary operational members’ costs.

Suggested Citation

  • Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2016. "Closed-loop supply chains: What reverse logistics factors influence performance?," International Journal of Production Economics, Elsevier, vol. 175(C), pages 35-49.
  • Handle: RePEc:eee:proeco:v:175:y:2016:i:c:p:35-49
    DOI: 10.1016/j.ijpe.2016.01.012
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731600013X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2016.01.012?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Eskandarpour, Majid & Dejax, Pierre & Miemczyk, Joe & Péton, Olivier, 2015. "Sustainable supply chain network design: An optimization-oriented review," Omega, Elsevier, vol. 54(C), pages 11-32.
    2. Chatfield, Dean C. & Pritchard, Alan M., 2013. "Returns and the bullwhip effect," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 49(1), pages 159-175.
    3. S Cannella & A P Barbosa-Póvoa & J M Framinan & S Relvas, 2013. "Metrics for bullwhip effect analysis," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(1), pages 1-16, January.
    4. Jayaram, Jayanth & Avittathur, Balram, 2015. "Green supply chains: A perspective from an emerging economy," International Journal of Production Economics, Elsevier, vol. 164(C), pages 234-244.
    5. Towill, Denis R. & Zhou, Li & Disney, Stephen M., 2007. "Reducing the bullwhip effect: Looking through the appropriate lens," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 444-453, July.
    6. Govindan, K. & Jafarian, A. & Khodaverdi, R. & Devika, K., 2014. "Two-echelon multiple-vehicle location–routing problem with time windows for optimization of sustainable supply chain network of perishable food," International Journal of Production Economics, Elsevier, vol. 152(C), pages 9-28.
    7. He, Yuanjie, 2015. "Acquisition pricing and remanufacturing decisions in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 163(C), pages 48-60.
    8. Zhou, Li & Naim, Mohamed M. & Ou Tang & Towill, Denis R., 2006. "Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process," Omega, Elsevier, vol. 34(6), pages 585-598, December.
    9. Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2015. "On returns and network configuration in supply chain dynamics," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 73(C), pages 152-167.
    10. Dadhich, P. & Genovese, A. & Kumar, N. & Acquaye, A., 2015. "Developing sustainable supply chains in the UK construction industry: A case study," International Journal of Production Economics, Elsevier, vol. 164(C), pages 271-284.
    11. Geary, S. & Disney, S.M. & Towill, D.R., 2006. "On bullwhip in supply chains--historical review, present practice and expected future impact," International Journal of Production Economics, Elsevier, vol. 101(1), pages 2-18, May.
    12. Kumar, Narendra & Vrat, Prem & Sushil, 1994. "A simulation study of unit exchange spares management of diesel locomotives in the Indian railways," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 225-236, January.
    13. Qiang, Qiang & Ke, Ke & Anderson, Trisha & Dong, June, 2013. "The closed-loop supply chain network with competition, distribution channel investment, and uncertainties," Omega, Elsevier, vol. 41(2), pages 186-194.
    14. Ashayeri, Jalal & Ma, Ning & Sotirov, Renata, 2015. "The redesign of a warranty distribution network with recovery processes," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 77(C), pages 184-197.
    15. Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
    16. Disney, S. M. & Towill, D. R., 2003. "On the bullwhip and inventory variance produced by an ordering policy," Omega, Elsevier, vol. 31(3), pages 157-167, June.
    17. Ciancimino, Elena & Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2012. "On the Bullwhip Avoidance Phase: The Synchronised Supply Chain," European Journal of Operational Research, Elsevier, vol. 221(1), pages 49-63.
    18. Zhou, Wei & Piramuthu, Selwyn, 2013. "Remanufacturing with RFID item-level information: Optimization, waste reduction and quality improvement," International Journal of Production Economics, Elsevier, vol. 145(2), pages 647-657.
    19. Disney, Stephen M. & Lambrecht, Marc R., 2008. "On Replenishment Rules, Forecasting, and the Bullwhip Effect in Supply Chains," Foundations and Trends(R) in Technology, Information and Operations Management, now publishers, vol. 2(1), pages 1-80, April.
    20. Das, Kanchan & Rao Posinasetti, Nageswara, 2015. "Addressing environmental concerns in closed loop supply chain design and planning," International Journal of Production Economics, Elsevier, vol. 163(C), pages 34-47.
    21. Adenso-Díaz, Belarmino & Moreno, Plácido & Gutiérrez, Ester & Lozano, Sebastián, 2012. "An analysis of the main factors affecting bullwhip in reverse supply chains," International Journal of Production Economics, Elsevier, vol. 135(2), pages 917-928.
    22. V. Daniel R. Guide & Luk N. Van Wassenhove, 2009. "OR FORUM---The Evolution of Closed-Loop Supply Chain Research," Operations Research, INFORMS, vol. 57(1), pages 10-18, February.
    23. Frank Chen & Zvi Drezner & Jennifer K. Ryan & David Simchi-Levi, 2000. "Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information," Management Science, INFORMS, vol. 46(3), pages 436-443, March.
    24. A A Syntetos & N C Georgantzas & J E Boylan & B C Dangerfield, 2011. "Judgement and supply chain dynamics," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1138-1158, June.
    25. Brandenburg, Marcus & Govindan, Kannan & Sarkis, Joseph & Seuring, Stefan, 2014. "Quantitative models for sustainable supply chain management: Developments and directions," European Journal of Operational Research, Elsevier, vol. 233(2), pages 299-312.
    26. Paksoy, Turan & Bektas, Tolga & Özceylan, Eren, 2011. "Operational and environmental performance measures in a multi-product closed-loop supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(4), pages 532-546, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2021. "Remanufacturing configuration in complex supply chains," Omega, Elsevier, vol. 101(C).
    2. Ponte, Borja & Framinan, Jose M. & Cannella, Salvatore & Dominguez, Roberto, 2020. "Quantifying the Bullwhip Effect in closed-loop supply chains: The interplay of information transparencies, return rates, and lead times," International Journal of Production Economics, Elsevier, vol. 230(C).
    3. Cannella, Salvatore & Framinan, Jose M. & Bruccoleri, Manfredi & Barbosa-Póvoa, Ana Paula & Relvas, Susana, 2015. "The effect of Inventory Record Inaccuracy in Information Exchange Supply Chains," European Journal of Operational Research, Elsevier, vol. 243(1), pages 120-129.
    4. Cannella, Salvatore & Dominguez, Roberto & Ponte, Borja & Framinan, Jose M., 2018. "Capacity restrictions and supply chain performance: Modelling and analysing load-dependent lead times," International Journal of Production Economics, Elsevier, vol. 204(C), pages 264-277.
    5. Ponte, Borja & Naim, Mohamed M. & Syntetos, Aris A., 2019. "The value of regulating returns for enhancing the dynamic behaviour of hybrid manufacturing-remanufacturing systems," European Journal of Operational Research, Elsevier, vol. 278(2), pages 629-645.
    6. Dominguez, Roberto & Cannella, Salvatore & Ponte, Borja & Framinan, Jose M., 2020. "On the dynamics of closed-loop supply chains under remanufacturing lead time variability," Omega, Elsevier, vol. 97(C).
    7. Dominguez, Roberto & Cannella, Salvatore & Barbosa-Póvoa, Ana P. & Framinan, Jose M., 2018. "Information sharing in supply chains with heterogeneous retailers," Omega, Elsevier, vol. 79(C), pages 116-132.
    8. Dominguez, Roberto & Cannella, Salvatore & Framinan, Jose M., 2015. "On returns and network configuration in supply chain dynamics," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 73(C), pages 152-167.
    9. Jyoti Dhingra Darbari & Devika Kannan & Vernika Agarwal & P. C. Jha, 2019. "Fuzzy criteria programming approach for optimising the TBL performance of closed loop supply chain network design problem," Annals of Operations Research, Springer, vol. 273(1), pages 693-738, February.
    10. Zhalechian, M. & Tavakkoli-Moghaddam, R. & Zahiri, B. & Mohammadi, M., 2016. "Sustainable design of a closed-loop location-routing-inventory supply chain network under mixed uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 89(C), pages 182-214.
    11. Ciancimino, Elena & Cannella, Salvatore & Canca Ortiz, José David & Framiñán Torres, José Manuel, 2009. "Análisis multinivel de cadenas de suministros: dos técnicas de resolución del efecto bullwhip // Supply Chain Multi-level Analysis: Two Bullwhip Dampening Approaches," Revista de Métodos Cuantitativos para la Economía y la Empresa = Journal of Quantitative Methods for Economics and Business Administration, Universidad Pablo de Olavide, Department of Quantitative Methods for Economics and Business Administration, vol. 8(1), pages 7-28, December.
    12. Ponte, Borja & Cannella, Salvatore & Dominguez, Roberto & Naim, Mohamed M. & Syntetos, Aris A., 2021. "Quality grading of returns and the dynamics of remanufacturing," International Journal of Production Economics, Elsevier, vol. 236(C).
    13. Mota, Bruna & Gomes, Maria Isabel & Carvalho, Ana & Barbosa-Povoa, Ana Paula, 2018. "Sustainable supply chains: An integrated modeling approach under uncertainty," Omega, Elsevier, vol. 77(C), pages 32-57.
    14. Cannella, Salvatore & Dominguez, Roberto & Framinan, Jose M., 2017. "Inventory record inaccuracy – The impact of structural complexity and lead time variability," Omega, Elsevier, vol. 68(C), pages 123-138.
    15. Roberto Dominguez & Salvatore Cannella & Borja Ponte & Jose M. Framinan, 2022. "Information sharing in decentralised supply chains with partial collaboration," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 263-292, June.
    16. Ahmed Shaban & Mohamed A. Shalaby & Giulio Di Gravio & Riccardo Patriarca, 2020. "Analysis of Variance Amplification and Service Level in a Supply Chain with Correlated Demand," Sustainability, MDPI, vol. 12(16), pages 1-27, August.
    17. Luttiely Santos Oliveira & Ricardo Luiz Machado, 2021. "Application of optimization methods in the closed-loop supply chain: a literature review," Journal of Combinatorial Optimization, Springer, vol. 41(2), pages 357-400, February.
    18. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
    19. Yang, Y. & Lin, J. & Hedenstierna, C.P.T. & Zhou, L., 2023. "The more the better? The impact of the number and location of product recovery options on the system dynamics in a closed-loop supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 175(C).
    20. Dobos, Imre, 2011. "The analysis of bullwhip effect in a HMMS-type supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 250-256, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:175:y:2016:i:c:p:35-49. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.