IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v194y2017icp135-152.html
   My bibliography  Save this article

The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015

Author

Listed:
  • Lin, J.
  • Naim, M.M.
  • Purvis, L.
  • Gosling, J.

Abstract

In 1994, through classic control theory, John, Naim and Towill developed the ‘Automatic Pipeline, Inventory and Order-based Production Control System’ (APIOBPCS) which extended the original IOBPCS archetype developed by Towill in 1982 ─ well-recognised as a base framework for a production planning and control system. Due to the prevalence of the two original models in the last three decades in the academic and industrial communities, this paper aims to systematically review how the IOBPCS archetypes have been adopted, exploited and adapted to study the dynamics of individual production planning and control systems and whole supply chains. Using various databases such as Scopus, Web of Science, Google Scholar (113 papers), we found that the IOBPCS archetypes have been studied regarding the a) modification of four inherent policies related to forecasting, inventory, lead-time and pipeline to create a ‘family’ of models, b) adoption of the IOBPCS ‘family’ to reduce supply chain dynamics, and in particular bullwhip, c) extension of the IOBPCS family to represent different supply chain scenarios such as order-book based production control and closed-loop processes. Simulation is the most popular method adopted by researchers and the number of works based on discrete time based methods is greater than those utilising continuous time approaches. Most studies are conceptual with limited practical applications described. Future research needs to focus on cost, flexibility and sustainability in the context of supply chain dynamics and, although there are a few existing studies, more analytical approaches are required to gain robust insights into the influence of nonlinear elements on supply chain behaviour. Also, empirical exploitation of the existing models is recommended.

Suggested Citation

  • Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
  • Handle: RePEc:eee:proeco:v:194:y:2017:i:c:p:135-152
    DOI: 10.1016/j.ijpe.2016.12.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527316303796
    Download Restriction: Full text for ScienceDirect subscribers only

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hosoda, Takamichi & Disney, Stephen M., 2012. "On the replenishment policy when the market demand information is lagged," International Journal of Production Economics, Elsevier, vol. 135(1), pages 458-467.
    2. Lalwani, Chandra S. & Disney, Stephen M. & Towill, Denis R., 2006. "Controllable, observable and stable state space representations of a generalized order-up-to policy," International Journal of Production Economics, Elsevier, vol. 101(1), pages 172-184, May.
    3. Disney, Stephen M. & Towill, Denis R. & Warburton, Roger D.H., 2006. "On the equivalence of control theoretic, differential, and difference equation approaches to modeling supply chains," International Journal of Production Economics, Elsevier, vol. 101(1), pages 194-208, May.
    4. Edghill, J. & Towill, D. R., 1990. "Assessing manufacturing system performance: Frequency response revisited," Engineering Costs and Production Economics, Elsevier, vol. 19(1-3), pages 319-326, May.
    5. Grubbstrom, Robert W. & Wikner, Joakim, 1996. "Inventory trigger control policies developed in terms of control theory," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 397-406, August.
    6. Naim, M.M., 2006. "The impact of the net present value on the assessment of the dynamic performance of e-commerce enabled supply chains," International Journal of Production Economics, Elsevier, vol. 104(2), pages 382-393, December.
    7. Disney, S. M. & Towill, D. R., 2003. "On the bullwhip and inventory variance produced by an ordering policy," Omega, Elsevier, vol. 31(3), pages 157-167, June.
    8. Warburton, Roger D.H. & Hodgson, J.P.E. & Nielsen, E.H., 2014. "Exact solutions to the supply chain equations for arbitrary, time-dependent demands," International Journal of Production Economics, Elsevier, vol. 151(C), pages 195-205.
    9. Disney, S. M. & Potter, A. T. & Gardner, B. M., 2003. "The impact of vendor managed inventory on transport operations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 39(5), pages 363-380, September.
    10. Aggelogiannaki, Eleni & Sarimveis, Haralambos, 2008. "Design of a novel adaptive inventory control system based on the online identification of lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 781-792, August.
    11. Wilson, Martha C., 2007. "The impact of transportation disruptions on supply chain performance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 43(4), pages 295-320, July.
    12. Özelkan, Ertunga C. & ÇakanyIldIrIm, Metin, 2009. "Reverse bullwhip effect in pricing," European Journal of Operational Research, Elsevier, vol. 192(1), pages 302-312, January.
    13. Ciancimino, Elena & Cannella, Salvatore & Bruccoleri, Manfredi & Framinan, Jose M., 2012. "On the Bullwhip Avoidance Phase: The Synchronised Supply Chain," European Journal of Operational Research, Elsevier, vol. 221(1), pages 49-63.
    14. Evans, G. N. & Naim, M. M. & Towill, D. R., 1998. "Application of a simulation methodology to the redesign of a logistical control system," International Journal of Production Economics, Elsevier, vol. 56(1), pages 157-168, September.
    15. Potter, Andrew & Lalwani, Chandra, 2008. "Investigating the impact of demand amplification on freight transport," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 44(5), pages 835-846, September.
    16. Yang, Taho & Wen, Yuan-Feng & Wang, Fang-Fang, 2011. "Evaluation of robustness of supply chain information-sharing strategies using a hybrid Taguchi and multiple criteria decision-making method," International Journal of Production Economics, Elsevier, vol. 134(2), pages 458-466, December.
    17. Bonney, M. C. & Popplewell, K., 1989. "Design of production control systems: Choice of system structure and systems implementation sequence," Engineering Costs and Production Economics, Elsevier, vol. 15(1), pages 169-173, May.
    18. Disney, S. M. & Towill, D. R., 2003. "The effect of vendor managed inventory (VMI) dynamics on the Bullwhip Effect in supply chains," International Journal of Production Economics, Elsevier, vol. 85(2), pages 199-215, August.
    19. Zhou, Li & Disney, Stephen & Towill, Denis R., 2010. "A pragmatic approach to the design of bullwhip controllers," International Journal of Production Economics, Elsevier, vol. 128(2), pages 556-568, December.
    20. Sipahi, Rifat & Delice, Ismail Ilker, 2010. "Stability of inventory dynamics in supply chains with three delays," International Journal of Production Economics, Elsevier, vol. 123(1), pages 107-117, January.
    21. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2003. "Measuring and avoiding the bullwhip effect: A control theoretic approach," European Journal of Operational Research, Elsevier, vol. 147(3), pages 567-590, June.
    22. Towill, Denis R. & Zhou, Li & Disney, Stephen M., 2007. "Reducing the bullwhip effect: Looking through the appropriate lens," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 444-453, July.
    23. Weiwei Han & Jing Wang, 2015. "The impact of cooperation mechanism on the chaotic behaviours in nonlinear supply chains," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 9(5), pages 595-612.
    24. Disney, S. M. & Naim, M. M. & Towill, D. R., 2000. "Genetic algorithm optimisation of a class of inventory control systems," International Journal of Production Economics, Elsevier, vol. 68(3), pages 259-278, December.
    25. Disney, S. M. & Naim, M. M. & Potter, A., 2004. "Assessing the impact of e-business on supply chain dynamics," International Journal of Production Economics, Elsevier, vol. 89(2), pages 109-118, May.
    26. Venkateswaran, Jayendran & Son, Young-Jun, 2007. "Effect of information update frequency on the stability of production-inventory control systems," International Journal of Production Economics, Elsevier, vol. 106(1), pages 171-190, March.
    27. Potter, Andrew & Disney, Stephen M., 2006. "Bullwhip and batching: An exploration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 408-418, December.
    28. Zhou, Li & Naim, Mohamed M. & Ou Tang & Towill, Denis R., 2006. "Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process," Omega, Elsevier, vol. 34(6), pages 585-598, December.
    29. Disney, S. M. & Towill, D. R. & van de Velde, W., 2004. "Variance amplification and the golden ratio in production and inventory control," International Journal of Production Economics, Elsevier, vol. 90(3), pages 295-309, August.
    30. Hoberg, Kai & Bradley, James R. & Thonemann, Ulrich W., 2007. "Analyzing the effect of the inventory policy on order and inventory variability with linear control theory," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1620-1642, February.
    31. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    32. Agrell, Per J. & Wikner, Joakim, 1996. "An MCDM framework for dynamic systems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 279-292, August.
    33. Wang, Xun & Disney, Stephen M., 2016. "The bullwhip effect: Progress, trends and directions," European Journal of Operational Research, Elsevier, vol. 250(3), pages 691-701.
    34. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2002. "Transfer function analysis of forecasting induced bullwhip in supply chains," International Journal of Production Economics, Elsevier, vol. 78(2), pages 133-144, July.
    35. Uday S. Rao, 2003. "Properties of the Periodic Review (R, T) Inventory Control Policy for Stationary, Stochastic Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 37-53, February.
    36. Wikner, J. & Towill, D. R. & Naim, M., 1991. "Smoothing supply chain dynamics," International Journal of Production Economics, Elsevier, vol. 22(3), pages 231-248, December.
    37. Naim, M.M. & Wikner, J. & Grubbström, R.W., 2007. "A net present value assessment of make-to-order and make-to-stock manufacturing systems," Omega, Elsevier, vol. 35(5), pages 524-532, October.
    38. Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R., 2004. "The impact of information enrichment on the Bullwhip effect in supply chains: A control engineering perspective," European Journal of Operational Research, Elsevier, vol. 153(3), pages 727-750, March.
    39. Herbert J. Vassian, 1955. "Application of Discrete Variable Servo Theory to Inventory Control," Operations Research, INFORMS, vol. 3(3), pages 272-282, August.
    40. Naim, Mohamed M. & Gosling, Jonathan, 2011. "On leanness, agility and leagile supply chains," International Journal of Production Economics, Elsevier, vol. 131(1), pages 342-354, May.
    41. Disney, S.M. & Towill, D.R., 2005. "Eliminating drift in inventory and order based production control systems," International Journal of Production Economics, Elsevier, vol. 93(1), pages 331-344, January.
    42. Wang, Xun & Disney, Stephen M. & Wang, Jing, 2012. "Stability analysis of constrained inventory systems with transportation delay," European Journal of Operational Research, Elsevier, vol. 223(1), pages 86-95.
    43. Disney, S.M. & Farasyn, I. & Lambrecht, M. & Towill, D.R. & de Velde, W. Van, 2006. "Taming the bullwhip effect whilst watching customer service in a single supply chain echelon," European Journal of Operational Research, Elsevier, vol. 173(1), pages 151-172, August.
    44. Li, Qinyun & Disney, Stephen M. & Gaalman, Gerard, 2014. "Avoiding the bullwhip effect using Damped Trend forecasting and the Order-Up-To replenishment policy," International Journal of Production Economics, Elsevier, vol. 149(C), pages 3-16.
    45. Warburton, R.D.H. & Disney, S.M., 2007. "Order and inventory variance amplification: The equivalence of discrete and continuous time analyses," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 128-137, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Plaza, Malgorzata & David, Iulian & Shirazi, Farid, 2018. "Management of inventory under market fluctuations the case of a Canadian high tech company," International Journal of Production Economics, Elsevier, vol. 205(C), pages 215-227.
    2. Lin, Junyi & Naim, Mohamed M. & Spiegler, Virginia L.M., 2020. "Delivery time dynamics in an assemble-to-order inventory and order based production control system," International Journal of Production Economics, Elsevier, vol. 223(C).
    3. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:194:y:2017:i:c:p:135-152. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Haili He). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.