IDEAS home Printed from https://ideas.repec.org/a/eee/juipol/v19y2011i2p104-114.html
   My bibliography  Save this article

(Un)bundling infrastructure procurement: Evidence from water supply and sewage projects

Author

Listed:
  • Estache, Antonio
  • Iimi, Atsushi

Abstract

Public infrastructure has long been faced with difficulty in financing. Available public resources are often limited in many countries. Competitive bidding in public procurement systems is an important instrument to contain the public investment costs. But competition is often limited in the infrastructure sector. In such circumstances, better public procurement design can save a lot of public resources. There is a general tradeoff between the competition effect and economies of scale and scope; large contracts can benefit from the scale and scope effects but have to compromise competition. The unbundling approach can foster competition but may suffer from diseconomies of scale and scope. Using procurement data from water supply and sewage projects in developing countries, the paper analyzes the effects of the (un)bundling strategy on bidders' entry and bidding behavior. It shows that the bidder cost structure exhibits significant diseconomies of scope between two main public works in this sector, i.e., treatment plant construction and distribution network installation. There is no clear evidence of the competition effect. Therefore, there is no rationale of bundling these two works into a single contract. Unbundling can help governments to contain public infrastructure costs.

Suggested Citation

  • Estache, Antonio & Iimi, Atsushi, 2011. "(Un)bundling infrastructure procurement: Evidence from water supply and sewage projects," Utilities Policy, Elsevier, vol. 19(2), pages 104-114, June.
  • Handle: RePEc:eee:juipol:v:19:y:2011:i:2:p:104-114
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0957-1787(10)00072-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to look for a different version below or search for a different version of it.

    Other versions of this item:

    References listed on IDEAS

    as
    1. Quinn Weninger, 2003. "Estimating multiproduct costs when some outputs are not produced," Empirical Economics, Springer, vol. 28(4), pages 753-765, November.
    2. Paarsch, Harry J., 1997. "Deriving an estimate of the optimal reserve price: An application to British Columbian timber sales," Journal of Econometrics, Elsevier, vol. 78(2), pages 333-357, June.
    3. Fay, Marianne & Yepes, Tito, 2003. "Investing in infrastructure : what is needed from 2000 to 2010?," Policy Research Working Paper Series 3102, The World Bank.
    4. Hiroshi Ohashi, 2009. "Effects of Transparency in Procurement Practices on Government Expenditure: A Case Study of Municipal Public Works," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 34(3), pages 267-285, May.
    5. Kaufmann, Daniel & Kraay, Aart & Mastruzzi, Massimo, 2007. "Governance Matters VI: Aggregate and Individual Governance Indicators, 1996-2006," Policy Research Working Paper Series 4280, The World Bank.
    6. Michael K. Price, 2008. "Using The Spatial Distribution Of Bidders To Detect Collusion In The Marketplace: Evidence From Timber Auctions," Journal of Regional Science, Wiley Blackwell, vol. 48(2), pages 399-417, May.
    7. Atsushi Iimi, 2006. "Auction Reforms for Effective Official Development Assistance," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 28(2), pages 109-128, March.
    8. Kwoka, John E., 2002. "Vertical economies in electric power: evidence on integration and its alternatives," International Journal of Industrial Organization, Elsevier, vol. 20(5), pages 653-671, May.
    9. Paulo K. Monteiro & Flavio M. Menezes, 2000. "original papers : Auctions with endogenous participation," Review of Economic Design, Springer;Society for Economic Design, vol. 5(1), pages 71-89.
    10. Antonio Estache & Atsushi Iimi, 2011. "Bidders' Entry and Auctioneer's Rejection: Applying a Double Selection Model to Road Procurement Auctions," Journal of Applied Economics, Taylor & Francis Journals, vol. 14(2), pages 199-223, November.
    11. J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024, December.
    12. Palfrey, Thomas R, 1983. "Bundling Decisions by a Multiproduct Monopolist with Incomplete Information," Econometrica, Econometric Society, vol. 51(2), pages 463-483, March.
    13. Tong Li & Isabelle Perrigne, 2003. "Timber Sale Auctions with Random Reserve Prices," The Review of Economics and Statistics, MIT Press, vol. 85(1), pages 189-200, February.
    14. Philip A. Haile, 2001. "Auctions with Resale Markets: An Application to U.S. Forest Service Timber Sales," American Economic Review, American Economic Association, vol. 91(3), pages 399-427, June.
    15. De Silva, Dakshina G. & Dunne, Timothy & Kankanamge, Anuruddha & Kosmopoulou, Georgia, 2008. "The impact of public information on bidding in highway procurement auctions," European Economic Review, Elsevier, vol. 52(1), pages 150-181, January.
    16. Steven Tadelis, 2009. "Auctions Versus Negotiations in Procurement: An Empirical Analysis," The Journal of Law, Economics, and Organization, Oxford University Press, vol. 25(2), pages 372-399, October.
    17. Roger Koenker & Kevin F. Hallock, 2001. "Quantile Regression," Journal of Economic Perspectives, American Economic Association, vol. 15(4), pages 143-156, Fall.
    18. Omar Arias & Walter Sosa-Escudero & Kevin F. Hallock, 2001. "Individual heterogeneity in the returns to schooling: instrumental variables quantile regression using twins data," Empirical Economics, Springer, vol. 26(1), pages 7-40.
    19. Mr. Peter S. Heller, 2005. "Understanding Fiscal Space," IMF Policy Discussion Papers 2005/004, International Monetary Fund.
    20. Klemperer, Paul, 2002. "How (not) to run auctions: The European 3G telecom auctions," European Economic Review, Elsevier, vol. 46(4-5), pages 829-845, May.
    21. Estache, Antonio & Iimi, Atsushi, 2008. "Procurement efficiency for infrastructure development and financial needs reassessed," Policy Research Working Paper Series 4662, The World Bank.
    22. Paarsch, Harry J., 1992. "Deciding between the common and private value paradigms in empirical models of auctions," Journal of Econometrics, Elsevier, vol. 51(1-2), pages 191-215.
    23. Dakshina G. De Silva & Timothy Dunne & Georgia Kosmopoulou, 2003. "An Empirical Analysis of Entrant and Incumbent Bidding in Road Construction Auctions," Journal of Industrial Economics, Wiley Blackwell, vol. 51(3), pages 295-316, September.
    24. Roberto Burguet & Yeon-Koo Che, 2004. "Competitive Procurement with Corruption," RAND Journal of Economics, The RAND Corporation, vol. 35(1), pages 50-68, Spring.
    25. Porter, Robert H & Zona, J Douglas, 1993. "Detection of Bid Rigging in Procurement Auctions," Journal of Political Economy, University of Chicago Press, vol. 101(3), pages 518-538, June.
    26. McAfee, R. Preston & McMillan, John, 1987. "Auctions with entry," Economics Letters, Elsevier, vol. 23(4), pages 343-347.
    27. Wolfstetter, Elmar, 1996. "Auctions: An Introduction," Journal of Economic Surveys, Wiley Blackwell, vol. 10(4), pages 367-420, December.
    28. Marion, Justin, 2007. "Are bid preferences benign? The effect of small business subsidies in highway procurement auctions," Journal of Public Economics, Elsevier, vol. 91(7-8), pages 1591-1624, August.
    29. Milgrom, Paul R & Weber, Robert J, 1982. "A Theory of Auctions and Competitive Bidding," Econometrica, Econometric Society, vol. 50(5), pages 1089-1122, September.
    30. Benjamin A. Olken, 2007. "Monitoring Corruption: Evidence from a Field Experiment in Indonesia," Journal of Political Economy, University of Chicago Press, vol. 115, pages 200-249.
    31. Dimitri,Nicola & Piga,Gustavo & Spagnolo,Giancarlo (ed.), 2006. "Handbook of Procurement," Cambridge Books, Cambridge University Press, number 9780521870733.
    32. Levin, Dan & Smith, James L, 1994. "Equilibrium in Auctions with Entry," American Economic Review, American Economic Association, vol. 84(3), pages 585-599, June.
    33. J. Edgardo Campos & Sanjay Pradhan, 2007. "The Many Faces of Corruption : Tracking Vulnerabilities at the Sector Level," World Bank Publications - Books, The World Bank Group, number 6848, December.
    34. Chakraborty, Indranil, 2006. "Bundle and separate sales in auctions with entry," Games and Economic Behavior, Elsevier, vol. 54(1), pages 31-46, January.
    35. World Bank, 2008. "The World Bank Annual Report 2008," World Bank Publications - Books, The World Bank Group, number 7524, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Islam, Asif & Hyland, Marie, 2019. "The drivers and impacts of water infrastructure reliability – a global analysis of manufacturing firms," Ecological Economics, Elsevier, vol. 163(C), pages 143-157.
    2. Yuan, Jingfeng & Ding, Hongxing & Huang, Zeyuan & Deng, Binchao & Li, Shuai & Huang, Wei, 2021. "Influence of market structures on concession pricing in Public-Private-Partnership utilities with asymmetric information," Utilities Policy, Elsevier, vol. 69(C).
    3. Chen, Yongmin & Li, Jianpei, 2018. "Bundled procurement," Journal of Public Economics, Elsevier, vol. 159(C), pages 116-127.
    4. repec:hal:journl:dumas-00811476 is not listed on IDEAS
    5. Taro Katsurai & Daisuke Sasaki & Ryo Fujikura, 2022. "What Determines the Time Efficiency of the Purchasing Phase of Public Procurement in Developing Countries: Evidence from Japanese ODA Loans," Working Papers 229, JICA Research Institute.
    6. Qiao, Yu & Labi, Samuel & Fricker, Jon D., 2021. "Does highway project bundling policy affect bidding competition? Insights from a mixed ordinal logistic model," Transportation Research Part A: Policy and Practice, Elsevier, vol. 145(C), pages 228-242.
    7. Ridderstedt, Ivan & Nilsson, Jan-Eric, 2022. "Economies of scale versus the costs of bundling in the procurement of highway pavement replacement," Working Papers 2022:4, Swedish National Road & Transport Research Institute (VTI).
    8. Martijn van den Hurk, 2016. "Bundling the procurement of sports infrastructure projects: How neither public nor private actors really benefit," Environment and Planning C, , vol. 34(8), pages 1369-1386, December.
    9. Zhao Zhai & Ming Shan & Amos Darko & Albert P. C. Chan, 2021. "Corruption in Construction Projects: Bibliometric Analysis of Global Research," Sustainability, MDPI, vol. 13(8), pages 1-21, April.
    10. Ridderstedt, Ivan & Nilsson, Jan-Eric, 2023. "Economies of scale versus the costs of bundling: Evidence from procurements of highway pavement replacement," Transportation Research Part A: Policy and Practice, Elsevier, vol. 173(C).
    11. Li, Sanxi & Sun, Hailin & Yan, Jianye & Yu, Jun, 2015. "Bundling decisions in procurement auctions with sequential tasks," Journal of Public Economics, Elsevier, vol. 128(C), pages 96-106.
    12. Qiao, Yu & Fricker, Jon D. & Labi, Samuel, 2019. "Effects of bundling policy on project cost under market uncertainty: A comparison across different highway project types," Transportation Research Part A: Policy and Practice, Elsevier, vol. 130(C), pages 606-625.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Atsushi Iimi, 2013. "Testing Low-Balling Strategy in Rural Road Procurement," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 43(3), pages 243-261, November.
    2. Antonio Estache & Atsushi Iimi, 2012. "Quality or Price? Evidence from ODA-Financed Public Procurement," Public Finance Review, , vol. 40(4), pages 435-469, July.
    3. Antonio Estache & Atsushi Iimi, 2010. "Bidder Asymmetry in Infrastructure Procurement: Are There any Fringe Bidders?," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 36(2), pages 163-187, March.
    4. Nakanishi, Yoshinobu, 2022. "Determinants of the number of bidders and win-reserve ratio in open competitive tendering: Relationship-specific investments and incomplete contracts," Japan and the World Economy, Elsevier, vol. 63(C).
    5. Antonio Estache & Atsushi Iimi, 2009. "Joint Bidding, Governance And Public Procurement Costs:A Case Of Road Projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 80(3), pages 393-429, September.
    6. Estache, Antonio & Iimi, Atsushi, 2009. "Auctions with endogenous participation and quality thresholds : evidence from ODA infrastructure procurement," Policy Research Working Paper Series 4853, The World Bank.
    7. Estache, Antonio & Iimi, Atsushi, 2008. "Procurement efficiency for infrastructure development and financial needs reassessed," Policy Research Working Paper Series 4662, The World Bank.
    8. Zheng, Xiaoyong, 2009. "Quantifying the cost of excess market thickness in timber sale auctions," International Journal of Industrial Organization, Elsevier, vol. 27(5), pages 553-566, September.
    9. Tong Li & Xiaoyong Zheng, 2009. "Entry and Competition Effects in First-Price Auctions: Theory and Evidence from Procurement Auctions," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 76(4), pages 1397-1429.
    10. Atsushi Iimi, 2016. "Multidimensional Auctions for Public Energy Efficiency Projects: Evidence from Japanese Esco Market," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 49(3), pages 491-514, November.
    11. İlke Onur & Rasim Özcan & Bedri Taş, 2012. "Public Procurement Auctions and Competition in Turkey," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 40(3), pages 207-223, May.
    12. Hill, Jonathan B. & Shneyerov, Artyom, 2013. "Are there common values in first-price auctions? A tail-index nonparametric test," Journal of Econometrics, Elsevier, vol. 174(2), pages 144-164.
    13. Amaral, Miguel & Saussier, Stéphane & Yvrande-Billon, Anne, 2009. "Auction procedures and competition in public services: The case of urban public transport in France and London," Utilities Policy, Elsevier, vol. 17(2), pages 166-175, June.
    14. Athias, Laure & Nunez, Antonio, 2008. "The more the merrier? Number of bidders, information dispersion, renegotiation and winner’s curse in toll road concessions," MPRA Paper 10539, University Library of Munich, Germany.
    15. Tong Li, 2005. "Econometrics of first-price auctions with entry and binding reservation prices," Journal of Econometrics, Elsevier, vol. 126(1), pages 173-200, May.
    16. Bedri Kamil Onur Tas, 2020. "Effect of public procurement regulation on competition and cost-effectiveness," Journal of Regulatory Economics, Springer, vol. 58(1), pages 59-77, August.
    17. Susan Athey & Philip A. Haile, 2006. "Empirical Models of Auctions," NBER Working Papers 12126, National Bureau of Economic Research, Inc.
    18. Ilke Onur & Bedri Kamil Onur Tas, 2019. "Optimal bidder participation in public procurement auctions," International Tax and Public Finance, Springer;International Institute of Public Finance, vol. 26(3), pages 595-617, June.
    19. Antonio Estache & Jose-Luis Guasch & Atsushi Iimi & Lourdes Trujillo, 2009. "Multidimensionality and Renegotiation: Evidence from Transport-Sector Public-Private-Partnership Transactions in Latin America," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 35(1), pages 41-71, September.
    20. Quang Vuong & Sandra Campo & Isabelle Perrigne, 2003. "Asymmetry in first-price auctions with affiliated private values," Journal of Applied Econometrics, John Wiley & Sons, Ltd., vol. 18(2), pages 179-207.

    More about this item

    Keywords

    Public procurement Auction theory Infrastructure development Governance;

    JEL classification:

    • D44 - Microeconomics - - Market Structure, Pricing, and Design - - - Auctions
    • H54 - Public Economics - - National Government Expenditures and Related Policies - - - Infrastructures
    • H57 - Public Economics - - National Government Expenditures and Related Policies - - - Procurement
    • C21 - Mathematical and Quantitative Methods - - Single Equation Models; Single Variables - - - Cross-Sectional Models; Spatial Models; Treatment Effect Models

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:19:y:2011:i:2:p:104-114. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.sciencedirect.com/journal/utilities-policy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.