Project scheduling under uncertainty: Survey and research potentials

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Zhu, Xia & Ruiz, Rubén & Li, Shiyu & Li, Xiaoping, 2017. "An effective heuristic for project scheduling with resource availability cost," European Journal of Operational Research, Elsevier, vol. 257(3), pages 746-762.
  2. HazIr, Öncü & Haouari, Mohamed & Erel, Erdal, 2010. "Robust scheduling and robustness measures for the discrete time/cost trade-off problem," European Journal of Operational Research, Elsevier, vol. 207(2), pages 633-643, December.
  3. Magni, Carlo Alberto, 2015. "Investment, financing and the role of ROA and WACC in value creation," European Journal of Operational Research, Elsevier, vol. 244(3), pages 855-866.
  4. Zaraket, Fadi A. & Olleik, Majd & Yassine, Ali A., 2014. "Skill-based framework for optimal software project selection and resource allocation," European Journal of Operational Research, Elsevier, vol. 234(1), pages 308-318.
  5. Laslo, Zohar & Golenko-Ginzburg, Dimitri & Keren, Baruch, 2008. "Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs," International Journal of Production Economics, Elsevier, vol. 111(2), pages 812-821, February.
  6. Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.
  7. Altekin, F. Tevhide & Bukchin, Yossi, 2022. "A multi-objective optimization approach for exploring the cost and makespan trade-off in additive manufacturing," European Journal of Operational Research, Elsevier, vol. 301(1), pages 235-253.
  8. Cui, Nanfang & Demeulemeester, Erik & Bie, Li, 2016. "Incorporation of activity sensitivity measures into buffer management to manage project schedule riskAuthor-Name: Hu, Xuejun," European Journal of Operational Research, Elsevier, vol. 249(2), pages 717-727.
  9. Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
  10. Kaut, Michal & Vaagen, Hajnalka & Wallace, Stein W., 2021. "The combined impact of stochastic and correlated activity durations and design uncertainty on project plans," International Journal of Production Economics, Elsevier, vol. 233(C).
  11. Shichang Xiao & Shudong Sun & Jionghua (Judy) Jin, 2017. "Surrogate Measures for the Robust Scheduling of Stochastic Job Shop Scheduling Problems," Energies, MDPI, vol. 10(4), pages 1-26, April.
  12. Artigues, Christian & Billaut, Jean-Charles & Esswein, Carl, 2005. "Maximization of solution flexibility for robust shop scheduling," European Journal of Operational Research, Elsevier, vol. 165(2), pages 314-328, September.
  13. He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
  14. Illana Bendavid & Boaz Golany, 2009. "Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology," Annals of Operations Research, Springer, vol. 172(1), pages 259-276, November.
  15. Qi, Xiangtong & Bard, Jonathan F. & Yu, Gang, 2006. "Disruption management for machine scheduling: The case of SPT schedules," International Journal of Production Economics, Elsevier, vol. 103(1), pages 166-184, September.
  16. Wolfram Wiesemann & Daniel Kuhn & Berc Rustem, 2009. "Robust Resource Allocations in Temporal Networks," Working Papers 020, COMISEF.
  17. Majid Askarifard & Hamidreza Abbasianjahromi & Mehran Sepehri & Ehsanollah Zeighami, 2021. "A robust multi-objective optimization model for project scheduling considering risk and sustainable development criteria," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 23(8), pages 11494-11524, August.
  18. Servranckx, Tom & Vanhoucke, Mario, 2019. "Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules," European Journal of Operational Research, Elsevier, vol. 279(1), pages 38-53.
  19. Carrasco, Rodrigo A. & Iyengar, Garud & Stein, Cliff, 2018. "Resource cost aware scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 621-632.
  20. Wiesemann, Wolfram & Kuhn, Daniel & Rustem, Berç, 2010. "Maximizing the net present value of a project under uncertainty," European Journal of Operational Research, Elsevier, vol. 202(2), pages 356-367, April.
  21. Nicolas Zufferey & Olivier Labarthe & David Schindl, 2012. "Heuristics for a project management problem with incompatibility and assignment costs," Computational Optimization and Applications, Springer, vol. 51(3), pages 1231-1252, April.
  22. Bordley, Robert F. & Keisler, Jeffrey M. & Logan, Tom M., 2019. "Managing projects with uncertain deadlines," European Journal of Operational Research, Elsevier, vol. 274(1), pages 291-302.
  23. Gutjahr, Walter J., 2015. "Bi-Objective Multi-Mode Project Scheduling Under Risk Aversion," European Journal of Operational Research, Elsevier, vol. 246(2), pages 421-434.
  24. Maxim A. Maron, 2018. "Diagnostics of Projects," European Research Studies Journal, European Research Studies Journal, vol. 0(1), pages 18-30.
  25. Carrizosa, Emilio & Goerigk, Marc & Schöbel, Anita, 2017. "A biobjective approach to recoverable robustness based on location planning," European Journal of Operational Research, Elsevier, vol. 261(2), pages 421-435.
  26. Wolfram Wiesemann & Daniel Kuhn & Berç Rustem, 2012. "Multi-resource allocation in stochastic project scheduling," Annals of Operations Research, Springer, vol. 193(1), pages 193-220, March.
  27. Yangyang Liang & Nanfang Cui & Tian Wang & Erik Demeulemeester, 2019. "Robust resource-constrained max-NPV project scheduling with stochastic activity duration," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 219-254, March.
  28. Xiong, Jian & Xing, Li-ning & Chen, Ying-wu, 2013. "Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns," International Journal of Production Economics, Elsevier, vol. 141(1), pages 112-126.
  29. Iwona Paprocka, 2018. "Evaluation of the Effects of a Machine Failure on the Robustness of a Job Shop System—Proactive Approaches," Sustainability, MDPI, vol. 11(1), pages 1-18, December.
  30. Murali Agastya & Oleksii Birulin, 2023. "Optimal Task Scheduling under Adverse Selection and Hidden Actions," American Economic Journal: Microeconomics, American Economic Association, vol. 15(2), pages 660-698, May.
  31. Godinho, Pedro & Branco, Fernando G., 2012. "Adaptive policies for multi-mode project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 216(3), pages 553-562.
  32. Hadda, Hatem & Dridi, Najoua & Hajji, Mohamed Karim, 2018. "On the optimality conditions of the two-machine flow shop problem," European Journal of Operational Research, Elsevier, vol. 266(2), pages 426-435.
  33. Korotin, Vladimir & Popov, Victor & Tolokonsky, Andrey & Islamov, Rustam & Ulchenkov, Arseniy, 2017. "A multi-criteria approach to selecting an optimal portfolio of refinery upgrade projects under margin and tax regime uncertainty," Omega, Elsevier, vol. 72(C), pages 50-58.
  34. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2021. "Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns," Annals of Operations Research, Springer, vol. 298(1), pages 43-64, March.
  35. Yin, Yunqiang & Luo, Zunhao & Wang, Dujuan & Cheng, T.C.E., 2023. "Wasserstein distance‐based distributionally robust parallel‐machine scheduling," Omega, Elsevier, vol. 120(C).
  36. Illana Bendavid & Boaz Golany, 2011. "Predetermined intervals for start times of activities in the stochastic project scheduling problem," Annals of Operations Research, Springer, vol. 186(1), pages 429-442, June.
  37. Brčić, Mario & Katić, Marija & Hlupić, Nikica, 2019. "Planning horizons based proactive rescheduling for stochastic resource-constrained project scheduling problems," European Journal of Operational Research, Elsevier, vol. 273(1), pages 58-66.
  38. Pablo Valledor & Alberto Gomez & Javier Puente & Isabel Fernandez, 2022. "Solving Rescheduling Problems in Dynamic Permutation Flow Shop Environments with Multiple Objectives Using the Hybrid Dynamic Non-Dominated Sorting Genetic II Algorithm," Mathematics, MDPI, vol. 10(14), pages 1-20, July.
  39. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
  40. Lambrechts, Olivier & Demeulemeester, Erik & Herroelen, Willy, 2008. "A tabu search procedure for developing robust predictive project schedules," International Journal of Production Economics, Elsevier, vol. 111(2), pages 493-508, February.
  41. Morteza Davari & Erik Demeulemeester, 2019. "The proactive and reactive resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 22(2), pages 211-237, April.
  42. Yujia Ge & Bin Xu, 2016. "Dynamic Staffing and Rescheduling in Software Project Management: A Hybrid Approach," PLOS ONE, Public Library of Science, vol. 11(6), pages 1-28, June.
  43. Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
  44. Izack Cohen & Michal Iluz & Avraham Shtub, 2014. "A Simulation‐Based Approach in Support of Project Management Training for Systems Engineers," Systems Engineering, John Wiley & Sons, vol. 17(1), pages 26-36, March.
  45. Guopeng Song & Roel Leus, 2022. "Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms," INFORMS Journal on Computing, INFORMS, vol. 34(6), pages 3059-3079, November.
  46. repec:rdg:wpaper:em-dp2008-57 is not listed on IDEAS
  47. KIlIç, Murat & Ulusoy, Gündüz & Serifoglu, Funda Sivrikaya, 2008. "A bi-objective genetic algorithm approach to risk mitigation in project scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 202-216, March.
  48. Máté Hegyháti & Krisztián Attila Bakon & Tibor Holczinger, 2023. "Optimization with uncertainties: a scheduling example," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(4), pages 1239-1263, December.
  49. Nesbitt, Peter & Blake, Lewis R. & Lamas, Patricio & Goycoolea, Marcos & Pagnoncelli, Bernardo K. & Newman, Alexandra & Brickey, Andrea, 2021. "Underground mine scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 294(1), pages 340-352.
  50. Vaagen, Hajnalka & Kaut, Michal & Wallace, Stein W., 2017. "The impact of design uncertainty in engineer-to-order project planning," European Journal of Operational Research, Elsevier, vol. 261(3), pages 1098-1109.
  51. Moukrim, Aziz & Quilliot, Alain & Toussaint, Hélène, 2015. "An effective branch-and-price algorithm for the Preemptive Resource Constrained Project Scheduling Problem based on minimal Interval Order Enumeration," European Journal of Operational Research, Elsevier, vol. 244(2), pages 360-368.
  52. Carlo Alberto Magni, 2015. "ROI and profitability index: A note on managerial performance," Department of Economics 0048, University of Modena and Reggio E., Faculty of Economics "Marco Biagi".
  53. Amir Mokhtari & Jane M. Van Doren, 2019. "An Agent‐Based Model for Pathogen Persistence and Cross‐Contamination Dynamics in a Food Facility," Risk Analysis, John Wiley & Sons, vol. 39(5), pages 992-1021, May.
  54. Balouka, Noemie & Cohen, Izack, 2021. "A robust optimization approach for the multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 291(2), pages 457-470.
  55. Joel Goh & Nicholas G. Hall, 2013. "Total Cost Control in Project Management via Satisficing," Management Science, INFORMS, vol. 59(6), pages 1354-1372, June.
  56. Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
  57. Da Lu & Fatma Gzara, 2015. "The robust crew pairing problem: model and solution methodology," Journal of Global Optimization, Springer, vol. 62(1), pages 29-54, May.
  58. Nicholas G. Hall & Zhixin Liu & Chris N. Potts, 2007. "Rescheduling for Multiple New Orders," INFORMS Journal on Computing, INFORMS, vol. 19(4), pages 633-645, November.
  59. S. Tarim & Brahim Hnich & Steven Prestwich & Roberto Rossi, 2009. "Finding reliable solutions: event-driven probabilistic constraint programming," Annals of Operations Research, Springer, vol. 171(1), pages 77-99, October.
  60. Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
  61. Bruni, M.E. & Di Puglia Pugliese, L. & Beraldi, P. & Guerriero, F., 2017. "An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations," Omega, Elsevier, vol. 71(C), pages 66-84.
  62. Emad Sadoon & Uday Venkatadri & Alireza Ghasemi, 2023. "A Conceptual Framework for Logistics Management and Project Planning in the Clinical Trials Industry," Logistics, MDPI, vol. 7(4), pages 1-42, November.
  63. J. C. Gonçalves-Dosantos & I. García-Jurado & J. Costa, 2020. "Sharing delay costs in stochastic scheduling problems with delays," 4OR, Springer, vol. 18(4), pages 457-476, December.
  64. Berghman, Lotte & Leus, Roel, 2015. "Practical solutions for a dock assignment problem with trailer transportation," European Journal of Operational Research, Elsevier, vol. 246(3), pages 787-799.
  65. Ripon K. Chakrabortty & Ruhul A. Sarker & Daryl L. Essam, 2020. "Single mode resource constrained project scheduling with unreliable resources," Operational Research, Springer, vol. 20(3), pages 1369-1403, September.
  66. Kobylanski, Przemyslaw & Kuchta, Dorota, 2007. "A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling," International Journal of Production Economics, Elsevier, vol. 107(2), pages 496-501, June.
  67. Yi, Xiajie & Goossens, Dries & Nobibon, Fabrice Talla, 2020. "Proactive and reactive strategies for football league timetabling," European Journal of Operational Research, Elsevier, vol. 282(2), pages 772-785.
  68. Yakhchali, Siamak Haji & Ghodsypour, Seyed Hassan, 2010. "Computing latest starting times of activities in interval-valued networks with minimal time lags," European Journal of Operational Research, Elsevier, vol. 200(3), pages 874-880, February.
  69. Van de Vonder, Stijn & Demeulemeester, Erik & Herroelen, Willy, 2008. "Proactive heuristic procedures for robust project scheduling: An experimental analysis," European Journal of Operational Research, Elsevier, vol. 189(3), pages 723-733, September.
  70. Carlo Alberto Magni, 2015. "Investment, financing and the role of ROA and WACC in value creation," Department of Economics 0050, University of Modena and Reggio E., Faculty of Economics "Marco Biagi".
  71. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
  72. Snauwaert, Jakob & Vanhoucke, Mario, 2023. "A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 307(1), pages 1-19.
  73. Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
  74. Maciej Drwal & Jerzy Józefczyk, 2020. "Robust min–max regret scheduling to minimize the weighted number of late jobs with interval processing times," Annals of Operations Research, Springer, vol. 284(1), pages 263-282, January.
  75. Carlo Meloni & Marco Pranzo, 2020. "Expected shortfall for the makespan in activity networks under imperfect information," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 668-692, September.
  76. Liu Shu-Shun & Kuo-Chuan Shih, 2009. "A framework of critical resource chain for project schedule analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 27(9), pages 857-869.
  77. Fatemeh Azimi & Fatemeh Fathallahi, 2016. "Fuzzy Multi Objective Project Scheduling Under Inflationary Conditions," ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, Faculty of Economic Cybernetics, Statistics and Informatics, vol. 50(3), pages 337-350.
  78. Chuang Wang & Pingyu Jiang, 2018. "Manifold learning based rescheduling decision mechanism for recessive disturbances in RFID-driven job shops," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1485-1500, October.
  79. Bakker, Hannah & Dunke, Fabian & Nickel, Stefan, 2020. "A structuring review on multi-stage optimization under uncertainty: Aligning concepts from theory and practice," Omega, Elsevier, vol. 96(C).
  80. Illana Bendavid & Boaz Golany, 2011. "Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology," Annals of Operations Research, Springer, vol. 189(1), pages 25-42, September.
  81. Barlow, Euan & Tezcaner Öztürk, Diclehan & Revie, Matthew & Akartunalı, Kerem & Day, Alexander H. & Boulougouris, Evangelos, 2018. "A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations," European Journal of Operational Research, Elsevier, vol. 264(3), pages 894-906.
  82. Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
  83. Ursavas, Evrim, 2017. "A benders decomposition approach for solving the offshore wind farm installation planning at the North Sea," European Journal of Operational Research, Elsevier, vol. 258(2), pages 703-714.
  84. B. De Reyck & Y. Grushka-Cockayne & R. Leus, 2007. "A New Challenge in Project Scheduling. The Incorporation of Activity Failures," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(3), pages 410-435.
  85. Xue Li & Zhengwen He & Nengmin Wang & Mario Vanhoucke, 2022. "Multimode time-cost-robustness trade-off project scheduling problem under uncertainty," Journal of Combinatorial Optimization, Springer, vol. 43(5), pages 1173-1202, July.
  86. Said, Samer S. & Haouari, Mohamed, 2015. "A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem," Applied Mathematics and Computation, Elsevier, vol. 259(C), pages 628-636.
  87. Al-Hinai, Nasr & ElMekkawy, T.Y., 2011. "Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm," International Journal of Production Economics, Elsevier, vol. 132(2), pages 279-291, August.
  88. Zhu, Sha & van Jaarsveld, Willem & Dekker, Rommert, 2022. "Critical project planning and spare parts inventory management in shutdown maintenance," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
  89. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
  90. Daniel Reich & Leo Lopes, 2011. "Preprocessing Stochastic Shortest-Path Problems with Application to PERT Activity Networks," INFORMS Journal on Computing, INFORMS, vol. 23(3), pages 460-469, August.
  91. Wang, Xiong & Ferreira, Fernando A.F. & Chang, Ching-Ter, 2022. "Multi-objective competency-based approach to project scheduling and staff assignment: Case study of an internal audit project," Socio-Economic Planning Sciences, Elsevier, vol. 81(C).
  92. Wenchang Luo & Taibo Luo & Randy Goebel & Guohui Lin, 2018. "Rescheduling due to machine disruption to minimize the total weighted completion time," Journal of Scheduling, Springer, vol. 21(5), pages 565-578, October.
  93. HazIr, Öncü & Erel, Erdal & Günalay, Yavuz, 2011. "Robust optimization models for the discrete time/cost trade-off problem," International Journal of Production Economics, Elsevier, vol. 130(1), pages 87-95, March.
  94. Farnaz Torabi Yeganeh & Seyed Hessameddin Zegordi, 2020. "A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration," Annals of Operations Research, Springer, vol. 285(1), pages 161-196, February.
  95. Felix Hübner & Patrick Gerhards & Christian Stürck & Rebekka Volk, 2021. "Solving the nuclear dismantling project scheduling problem by combining mixed-integer and constraint programming techniques and metaheuristics," Journal of Scheduling, Springer, vol. 24(3), pages 269-290, June.
  96. Selcuk Goren & Ihsan Sabuncuoglu & Utku Koc, 2012. "Optimization of schedule stability and efficiency under processing time variability and random machine breakdowns in a job shop environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(1), pages 26-38, February.
  97. Joel Goh & Melvyn Sim, 2011. "Robust Optimization Made Easy with ROME," Operations Research, INFORMS, vol. 59(4), pages 973-985, August.
  98. Yagub Alipouri & Mohammad Hassan Sebt & Abdollah Ardeshir & Mohammad Hossein Fazel Zarandi, 2020. "A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem," Operational Research, Springer, vol. 20(1), pages 197-217, March.
  99. Nicholas G. Hall & Chris N. Potts, 2010. "Rescheduling for Job Unavailability," Operations Research, INFORMS, vol. 58(3), pages 746-755, June.
  100. Antonin Novak & Zdenek Hanzalek, 2022. "Computing the execution probability of jobs with replication in mixed-criticality schedules," Annals of Operations Research, Springer, vol. 309(1), pages 209-232, February.
  101. Mauricio Diéguez & Jaime Bustos & Carlos Cares, 0. "Mapping the variations for implementing information security controls to their operational research solutions," Information Systems and e-Business Management, Springer, vol. 0, pages 1-30.
  102. Mauricio Diéguez & Jaime Bustos & Carlos Cares, 2020. "Mapping the variations for implementing information security controls to their operational research solutions," Information Systems and e-Business Management, Springer, vol. 18(2), pages 157-186, June.
  103. Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
  104. Siqian Shen & J. Cole Smith & Shabbir Ahmed, 2010. "Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths," Management Science, INFORMS, vol. 56(10), pages 1794-1814, October.
  105. Fang, Yi-Ping & Sansavini, Giovanni, 2019. "Optimum post-disruption restoration under uncertainty for enhancing critical infrastructure resilience," Reliability Engineering and System Safety, Elsevier, vol. 185(C), pages 1-11.
  106. Jürgen Kuster & Dietmar Jannach & Gerhard Friedrich, 2010. "Applying Local Rescheduling in response to schedule disruptions," Annals of Operations Research, Springer, vol. 180(1), pages 265-282, November.
  107. Che, Ada & Kats, Vladimir & Levner, Eugene, 2017. "An efficient bicriteria algorithm for stable robotic flow shop scheduling," European Journal of Operational Research, Elsevier, vol. 260(3), pages 964-971.
  108. Elisa Negri & Vibhor Pandhare & Laura Cattaneo & Jaskaran Singh & Marco Macchi & Jay Lee, 2021. "Field-synchronized Digital Twin framework for production scheduling with uncertainty," Journal of Intelligent Manufacturing, Springer, vol. 32(4), pages 1207-1228, April.
  109. Indranil R. Bardhan & Vish V. Krishnan & Shu Lin, 2007. "Project Performance and the Enabling Role of Information Technology: An Exploratory Study on the Role of Alignment," Manufacturing & Service Operations Management, INFORMS, vol. 9(4), pages 579-595, May.
  110. Roland Braune & Walter J. Gutjahr & Petra Vogl, 2022. "Stochastic radiotherapy appointment scheduling," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(4), pages 1239-1277, December.
  111. Colvin, Matthew & Maravelias, Christos T., 2010. "Modeling methods and a branch and cut algorithm for pharmaceutical clinical trial planning using stochastic programming," European Journal of Operational Research, Elsevier, vol. 203(1), pages 205-215, May.
  112. Colvin, Matthew & Maravelias, Christos T., 2011. "R&D pipeline management: Task interdependencies and risk management," European Journal of Operational Research, Elsevier, vol. 215(3), pages 616-628, December.
  113. Hongbo Li & Erik Demeulemeester, 2016. "A genetic algorithm for the robust resource leveling problem," Journal of Scheduling, Springer, vol. 19(1), pages 43-60, February.
  114. Sonja Rosenberg & Sandra Huster & Sabri Baazouzi & Simon Glöser-Chahoud & Anwar Al Assadi & Frank Schultmann, 2022. "Field Study and Multimethod Analysis of an EV Battery System Disassembly," Energies, MDPI, vol. 15(15), pages 1-35, July.
  115. Briand, Cyril & La, H. Trung & Erschler, Jacques, 2006. "A new sufficient condition of optimality for the two-machine flowshop problem," European Journal of Operational Research, Elsevier, vol. 169(3), pages 712-722, March.
  116. Antonio J. Conejo & Nicholas G. Hall & Daniel Zhuoyu Long & Runhao Zhang, 2021. "Robust Capacity Planning for Project Management," INFORMS Journal on Computing, INFORMS, vol. 33(4), pages 1533-1550, October.
  117. Zhao, Mingxuan & Zhou, Jian & Wang, Ke & Pantelous, Athanasios A., 2023. "Project scheduling problem with fuzzy activity durations: A novel operational law based solution framework," European Journal of Operational Research, Elsevier, vol. 306(2), pages 519-534.
  118. Kerkhove, L.-P. & Vanhoucke, M., 2017. "Optimised scheduling for weather sensitive offshore construction projects," Omega, Elsevier, vol. 66(PA), pages 58-78.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.