IDEAS home Printed from https://ideas.repec.org/p/arx/papers/2507.00281.html
   My bibliography  Save this paper

Factors Influencing Change Orders in Horizontal Construction Projects: A Comparative Analysis of Unit Price and Lump Sum Contracts

Author

Listed:
  • Mohamed Khalafalla
  • Tejal Mulay
  • Shonda L Bernadin

Abstract

Change orders (COs) are a common occurrence in construction projects, leading to increased costs and extended durations. Design-Bid-Build (DBB) projects, favored by state transportation agencies (STAs), often experience a higher frequency of COs compared to other project delivery methods. This study aims to identify areas of improvement to reduce CO frequency in DBB projects through a quantitative analysis. Historical bidding data from the Florida Department of Transportation (FDOT) was utilized to evaluate five factors, contracting technique, project location, type of work, project size, and duration, on specific horizontal construction projects. Two DBB contracting techniques, Unit Price (UP) and Lump Sum (LS), were evaluated using a discrete choice model. The analysis of 581 UP and 189 LS projects revealed that project size, duration, and type of work had a statistically significant influence on the frequency of change orders at a 95% confidence level. The discrete choice model showed significant improvement in identifying the appropriate contract type for a specific project compared to traditional methods used by STAs. By evaluating the contracting technique instead of project delivery methods for horizontal construction projects, the use of DBB can be enhanced, leading to reduced change orders for STAs.

Suggested Citation

  • Mohamed Khalafalla & Tejal Mulay & Shonda L Bernadin, 2025. "Factors Influencing Change Orders in Horizontal Construction Projects: A Comparative Analysis of Unit Price and Lump Sum Contracts," Papers 2507.00281, arXiv.org.
  • Handle: RePEc:arx:papers:2507.00281
    as

    Download full text from publisher

    File URL: http://arxiv.org/pdf/2507.00281
    File Function: Latest version
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arx:papers:2507.00281. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: arXiv administrators (email available below). General contact details of provider: http://arxiv.org/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.