Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Roman Slowinski
Editor: Roman Slowinski
Editor: Roman Slowinski
Editor: Roman Slowinski
Editor: Roman Slowinski
Series handle: RePEc:eee:ejores
ISSN: 0377-2217
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Content
March 1997, Volume 97, Issue 3
March 1997, Volume 97, Issue 2
- 215-219 Large-scale, high-priced applications: An introduction
by Dror, M.
- 220-244 Operations Research applications: Opportunities and accomplishments
by Luss, Hanan & Rosenwein, Moshe B.
- 245-259 Crew pairing at Air France
by Desaulniers, G. & Desrosiers, J. & Dumas, Y. & Marc, S. & Rioux, B. & Solomon, M. M. & Soumis, F.
- 260-268 Solving large scale crew scheduling problems
by Chu, Hai D. & Gelman, Eric & Johnson, Ellis L.
- 269-280 Optimizing nuclear power plant refueling with mixed-integer programming
by Fourcade, Fabrice & Johnson, Ellis & Bara, Mourad & Cortey-Dumont, Philippe
- 281-292 Locomotive assignment with heterogeneous consists at CN North America
by Ziarati, Koorush & Soumis, Francois & Desrosiers, Jacques & Gelinas, Sylvie & Saintonge, Andre
- 293-307 Evaluating the demand for supergauge trucks-on-trains services in Western Europe
by Higginson, John & Hogan, Terence & Weil, Mark
- 308-326 Environmental integrated production and recycling management
by Spengler, Th. & Puchert, H. & Penkuhn, T. & Rentz, O.
- 327-336 Environmental integrated production planning for the ammonia synthesis
by Penkuhn, T. & Spengler, Th. & Puchert, H. & Rentz, O.
- 337-347 Reducing overcapacity in chemical plants by linear programming
by Oxe, Gerd
- 348-362 Scheduling of flexible flow lines in an automobile assembly plant
by Agnetis, A. & Pacifici, A. & Rossi, F. & Lucertini, M. & Nicoletti, S. & Nicolo, F. & Oriolo, G. & Pacciarelli, D. & Pesaro, E.
- 363-379 HADTS: A decision technology system to support Army housing management
by Forgionne, Guisseppi A.
- 380-395 Developing scheduling systems for Daewoo Shipbuilding: DAS project
by Lee, Jae Kyu & Lee, Kyoung Jun & Park, Hung Kook & Hong, June Seok & Lee, Jung Seung
- 396-407 Intelligent control and optimization under uncertainty with application to hydro power
by Dantzig, George B. & Infanger, Gerd
February 1997, Volume 97, Issue 1
- 1-16 Strategic financial risk management and operations research
by Mulvey, John M. & Rosenbaum, Daniel P. & Shetty, Bala
- 17-21 A note on the design of a two-sided, two-stage screening procedure with a prescribed outgoing quality
by Bai, Do Sun & Kwon, Hyuck Moo
- 22-33 Audit scheduling with overlapping activities and sequence-dependent setup costs
by Dodin, Bajis & Elimam, A. A.
- 34-40 The application of reliability constrained stochastic capacity planning models to the service sector
by Boronico, Jess S.
- 41-52 The DH/KD algorithm: a hybrid approach for unconstrained two-dimensional cutting problems
by Hifi, Mhand
- 53-62 Preference programming and inconsistent interval judgments
by Islam, R. & Biswal, M. P. & Alam, S. S.
- 63-74 A Lagrangean heuristic for the facility location problem with staircase costs
by Holmberg, Kaj & Ling, Jonas
- 75-86 Heuristic concentration: Two stage solution construction
by Rosing, K. E. & ReVelle, C. S.
- 87-93 Weber problems with alternative transportation systems
by Carrizosa, Emilio & Rodriguez-Chia, Antonio M.
- 94-104 A combined transportation and scheduling problem
by Equi, Luisa & Gallo, Giorgio & Marziale, Silvia & Weintraub, Andres
- 105-123 Linear programs for constraint satisfaction problems
by Zimmermann, H. J. & Monfroglio, Angelo
- 124-138 Mean value cross decomposition applied to integer programming problems
by Holmberg, Kaj
- 139-148 Fixing variables and generating classical cutting planes when using an interior point branch and cut method to solve integer programming problems
by Mitchell, John E.
- 149-158 Fuzzy programming for multiobjective 0-1 programming problems through revised genetic algorithms
by Sakawa, Masatoshi & Kato, Kosuke & Sunada, Hideaki & Shibano, Toshihiro
- 159-166 Connectedness of efficient solutions in multiple criteria combinatorial optimization
by Ehrgott, Matthias & Klamroth, Kathrin
- 167-171 Symmetric dual multiobjective programming
by Das, L. N. & Nanda, S.
- 172-182 The partial sum criterion for Steiner trees in graphs and shortest paths
by Duin, C. W. & Volgenant, A.
- 183-199 Algorithms for network piecewise-linear programs: A comparative study
by Marins, Fernando A. S. & Senne, Edson L. F. & Darby-Dowman, Ken & Machado, Arlene F. & Perin, Clovis
- 200-204 Simple Lagrangian heuristic for the set covering problem
by Haddadi, Salim
- 205-212 A method for convex curve approximation
by Yang, X. Q. & Goh, C. J.
- 213-214 Error noted in a case study on fund allocation using goal programming
by Baki, Fazle & Fraser, Niall M.
February 1997, Volume 96, Issue 3
- 429-443 Rate-monotonic scheduling for hard-real-time systems
by Bertossi, Alan A. & Fusiello, Andrea
- 444-454 Self-reinforcing mechanisms and market information
by Agliardi, E. & Bebbington, M. S.
- 455-470 The effect of information on commuters' behavior: A comparative micro-simulation approach
by Sinuany-Stern, Z. & Stern, E. & Sfaradi, Z. & Holm, E.
- 471-478 A unified approach to fuzzy pattern recognition
by Dumitrescu, D. & Dumitrescu, A.
- 479-492 Monitoring machine operations using on-line sensors
by Gong, Linguo & Tang, Kwei
- 493-503 A shrunken cyclic inspection schedule for deteriorating production stages
by Rabinowitz, Gad
- 504-513 The combinatorics of timetabling
by de Werra, D.
- 514-517 A note on the equivalence of two heuristics to minimize total tardiness
by Alidaee, Bahram & Gopalan, Suresh
- 518-537 Scheduling with batch setup times and earliness-tardiness penalties
by Zhi-Long Chen
- 538-545 Evaluation of leading heuristics for the single machine tardiness problem
by Russell, Randolph M. & Holsenback, J. Edward
- 546-558 Single machine earliness and tardiness scheduling
by George Li
- 559-563 A note on minimizing the weighted sum of tardy and early completion penalties in a single machine: A case of small common due date
by Alidaee, Bahram & Dragan, Irinel
- 564-569 Scheduling with agreeable release times and due dates on a batch processing machine
by Chung-Lun Li & Chung-Yee Lee
- 570-577 Economic scheduling of products with N components on a single machine
by Bongjin Gim & Min-Hong Han
- 578-590 A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
by Jinliang Cheng & Hiroshi Kise & Hironori Matsumoto
- 591-611 Lot streaming with detached setups in three-machine flow shops
by Chen, Jiang & Steiner, George
- 612-621 On minimizing resource consumption with constraints on the makespan and the total completion time
by Vasilev, Stanislav H. & Foote, Bob L.
- 622-635 Sequencing jobs for an automated manufacturing module with buffer
by Bolat, Ahmet
- 636-644 Heuristic approaches for n/m/F/ [summation operator]Ci scheduling problems
by Chengen Wang & Chengbin Chu & Proth, Jean-Marie
- 645-658 Modelling for a dynamic inventory-production control system
by Potamianos, J. & Orman, A. J. & Shahani, A. K.
January 1997, Volume 96, Issue 2
- 217-231 Sequential location problems
by Eiselt, H. A. & Laporte, Gilbert
- 232-247 A generalized group maintenance policy
by Sheu, Shey-Huei & Jhang, Jhy-Ping
- 248-259 Optimal inspection and replacement policies for multi-state deteriorating systems
by Yeh, Ruey Huei
- 260-273 Nonparametric repair-limit replacement policies with imperfect repair
by Dohi, Ta-i & Matsushima, Nobuyuki & Kaio, Naoto & Osaki, Shunji
- 274-288 Job sequencing rules for minimizing the expected makespan in flexible machines
by Chakravarty, Amiya K. & Balakrishnan, Nagraj
- 289-298 An approximate solution and error bound for a discrete time queue with simultaneous servicing
by van Dijk, Nico M.
- 299-316 A simple approach for analyzing feedback vacation queues with levy input process
by (Yew Sing) Lee, Thomas
- 317-322 New inequalities for the General Routing Problem
by Letchford, Adam N.
- 323-328 The hierarchical network design problem with multiple primary paths
by Sancho, N. G. F.
- 329-342 An efficient tabu search procedure for the p-Median Problem
by Rolland, Erik & Schilling, David A. & Current, John R.
- 343-350 Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function
by Cheng, Ching-Hsue
- 351-362 The sensitivity of the analytic hierarchy process to alternative scale and cue presentations
by Webber, Sally A. & Apostolou, Barbara & Hassell, John M.
- 363-370 Group preference aggregation in the multiplicative AHP The model of the group decision process and Pareto optimality
by Van Den Honert, R. C. & Lootsma, F. A.
- 371-378 A probabilistic interpretation of the final rankings in AHP
by Rosenbloom, E. S.
- 379-386 An action learning evaluation procedure for multiple criteria decision making problems
by Bryson, Noel & Mobolurin, Ayodele
- 387-391 An intrinsic consistency threshold for reciprocal matrices
by Monsuur, Herman
- 392-397 A general framework for distance-based consensus in ordinal ranking models
by Cook, Wade D. & Kress, Moshe & Seiford, Lawrence M.
- 398-406 Establishing strict dominance between alternatives with special type of incomplete information
by Park, Kyung Sam & Kim, Soung Hie & Yoon, Wan Chul
- 407-416 A method for selecting a subset of alternatives for future decision making
by Ehrman, Chaim Meyer & Hamburg, Morris & Krieger, Abba M.
- 417-427 Rank-based selection strategies for the random walk process
by Chun, Young Hak
January 1997, Volume 96, Issue 1
- -427 Editorial
by Mercer, Alan & Tilanus, Bernhard & Zimmermann, Hans-Jurgen
- 1-35 Survey of mathematical programming models in air pollution management
by Cooper, W. W. & Hemphill, H. & Huang, Z. & Li, S. & Lelas, V. & Sullivan, D. W.
- 36-44 Air cargo revenue management: Characteristics and complexities
by Kasilingam, R. G.
- 45-53 Reducing depot-related costs of large bus operators a case study in Bangkok
by Van der Perre, Peter P. G. & Van Oudheusden, Dirk D. L.
- 54-63 Optimal lines for railway systems
by Bussieck, Michael R. & Kreuzer, Peter & Zimmermann, Uwe T.
- 64-71 On farmers' objectives: A multi-criteria approach
by Sumpsi, JoseMaria & Amador, Francisco & Romero, Carlos
- 72-80 Optimal location and capacity of emergency cleanup equipment for oil spill response
by Iakovou, Eleftherios & Ip, Chi M. & Douligeris, Christos & Korde, Ashutosh
- 81-89 Multicriteria decision analysis and environmental economics: An approximation
by Romero, Carlos
- 90-96 Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows
by Etgar, Ran & Shtub, Avraham & LeBlanc, Larry J.
- 97-102 Vendor selection and evaluation an Activity Based Costing approach
by Roodhooft, Filip & Konings, Jozef
- 103-112 Constrained games for evaluating organizational performance
by Semple, John
- 113-121 An algorithm for single shift scheduling of hierarchical workforce
by Narasimhan, Rangarajan
- 122-129 Economic design of a complete inspection plan with interactive quality improvement
by Cheong Ng, Wing & Van Hui, Yer
- 130-138 Exact evaluation of (R, Q)-policies for two-level inventory systems with Poisson demand
by Forsberg, Rolf
- 139-147 A model of incentive contracts for just-in-time delivery
by Grout, John R.
- 148-166 Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks
by D'Amours, Sophie & Montreuil, Benoit & Soumis, Francois
- 167-179 Nonlinear programming for multiperiod capacity planning in a manufacturing system
by Bretthauer, Kurt M. & Cote, Murray J.
- 180-194 Searching for important factors in simulation models with many factors: Sequential bifurcation
by Bettonvil, Bert & Kleijnen, Jack P. C.
- 195-201 A Markov Chain analysis of genetic algorithms with power of 2 cardinality alphabets
by Aytug, Haldun & Bhattacharrya, Siddartha & Koehler, Gary J.
- 202-204 Comment on a decision support approach for negotiation: Software vs. methodology
by Verkama, Markku & Heiskanen, Pirja
- 205-216 PSPLIB - A project scheduling problem library : OR Software - ORSEP Operations Research Software Exchange Program
by Kolisch, Rainer & Sprecher, Arno
December 1996, Volume 95, Issue 3
- 467-475 Risk analysis techniques and their application to software development
by Bennett, Joanna C. & Bohoris, George A. & Aspinwall, Elaine M. & Hall, Richard C.
- 476-490 A dual ascent approach to the fixed-charge capacitated network design problem
by Herrmann, J. W. & Ioannou, G. & Minis, I. & Proth, J. M.
- 491-510 Construction of all DEA efficient surfaces of the production possibility set under the Generalized Data Envelopment Analysis Model
by Yu, Gang & Wei, Quanling & Brockett, Patrick & Zhou, Li
- 511-521 Determining the optimal return on investment for an advertising campaign
by Danaher, Peter J. & Rust, Roland T.
- 522-536 Optimal hedging under output price uncertainty
by Arshanapalli, Bala G. & Gupta, Omprakash K.
- 537-548 A sequential integer programming method for discontinuous labor tour scheduling
by Brusco, Michael J. & Johns, Tony R.
- 549-565 Optimal yield improvement in multi-stage manufacturing systems
by Barad, M. & Bennett, G.
- 566-576 A flexible approach to (re)configure Flexible Manufacturing Cells
by Mohamed, Zubair M.
- 577-591 The impact of preventive maintenance on system cost and buffer size
by Meller, Russell D. & Kim, David S.
- 592-603 A review of extensive facility location in networks
by Mesa, Juan A. & Brian Boffey, T.
- 604-610 An inventory model for deteriorating items with stock-dependent demand rate
by Giri, B. C. & Pal, S. & Goswami, A. & Chaudhuri, K. S.
- 611-622 A fuzzy mathematical model for the joint economic lot size problem with multiple price breaks
by Monica Lam, S. & Wong, Danny S.
- 623-630 Common volatility in major stock index futures markets
by Geoffrey Booth, G. & Chowdhury, Mustafa & Martikainen, Teppo
- 631-640 Setup minimising conditions in the trim loss problem
by Diegel, Adolf & Montocchio, Edouard & Walters, Edward & van Schalkwyk, Sias & Naidoo, Spurs
- 641-648 Design of double CUSUM quality control schemes
by Waldmann, Karl-Heinz
- 649-655 Applications of the extent analysis method on fuzzy AHP
by Chang, Da-Yong
- 656-662 A simulation-based evaluation of the approximate and the exact eigenvector methods employed in AHP
by Kumar, N. Vinod & Ganesh, L. S.
- 663-670 Coordinated search for an object hidden on the line
by Reyniers, Diane J.
- 671-682 An extended formulation approach to the edge-weighted maximal clique problem
by Park, Kyungchul & Lee, Kyungsik & Park, Sungsoo
December 1996, Volume 95, Issue 2
- 241-263 Multi-echelon systems: A service measure perspective
by Diks, E. B. & de Kok, A. G. & Lagodimos, A. G.
- 264-277 Probabilistic, fuzzy and rough concepts in social choice
by Nurmi, Hannu & Kacprzyk, Janusz & Fedrizzi, Mario
- 278-283 Optimal segmentation of projects -- Schedule and cost considerations
by Shtub, Avraham & Raz, Tzvi
- 284-298 Dynamic project selection and funding under risk: A decision tree based MILP approach
by Heidenberger, Kurt
- 299-312 Optimal ordering policies in inventory systems with random demand and random deal offerings
by Gurnani, Haresh
- 313-324 The EOQ repair and waste disposal model with variable setup numbers
by Richter, Knut
- 325-343 Global and variable cost manufacturing systems
by Rosenfield, Donald B.
- 344-355 Inspection sequencing and part scheduling for flexible manufacturing systems
by Lee, Jim & Frank Chen, F.
- 356-373 Genetic algorithms for the two-stage bicriteria flowshop problem
by Neppalli, Venkata Ranga & Chen, Chuen-Lung & Gupta, Jatinder N. D.
- 374-389 An exploration of models that minimize leadtime through batching of arrived orders
by Tielemans, Peter F. J. & Kuik, Roelof
- 390-403 Dominance stochastic models in data envelopment analysis
by Huang, Zhimin & Li, Susan X.
- 404-410 Lower bounding aggregation and direct computation for an infinite horizon one-reservoir model
by Lamond, Bernard F. & Lang, Pascal
- 411-419 Random generation of tournaments and asymmetric graphs with given out-degrees
by Charon, Irene & Germa, Anne & Hudry, Olivier
- 420-426 QUAD01: A data-structured implementation of Hansen's quadratic zero-one programming algorithm
by Comley, Warwick J.
- 427-438 Minimizing the schedule length for a parallel 3D-grid precedence graph
by Bampis, E. & Konig, J. -C. & Trystram, D.
- 439-450 Multidimensional scaling: An analysis of 1980-1990 computers
by Giladi, Ran & Spector, Yishay & Raveh, Adi
- 451-463 New mathematical properties of the Banzhaf value
by Dragan, Irinel
November 1996, Volume 95, Issue 1
- 1-23 Materials coordination in stochastic multi-echelon systems
by van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M.
- 24-37 A comparison of neural networks and linear scoring models in the credit union environment
by Desai, Vijay S. & Crook, Jonathan N. & Overstreet, George A.
- 38-52 Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
by Steiner, George & Yeomans, Julian Scott
- 53-61 Order splitting in continuous review (Q, r) inventory models
by Hill, Roger M.
- 62-72 Fuzzy bicriteria multi-index transportation problems for coal allocation planning of Taipower
by Tzeng, Gwo-Hshiung & Teodorovic, Dusan & Hwang, Ming-Jiu
- 73-88 A general approximation for the single product lot sizing model with queueing delays
by Lambrecht, Marc R. & Vandaele, Nico J.
- 89-114 Competitive capacity expansion under demand uncertainty
by Bashyam, T. C. A.
- 115-138 Preference modelling by estimating local utility functions for multiobjective optimization
by Yang, Jian-Bo & Sen, Pratyush
- 139-154 Stochastic dominance tests for ranking alternatives under ambiguity
by Langewisch, Andrew & Choobineh, Fred
- 155-166 On the connectedness of optimum-degeneracy graphs
by Zornig, Peter & Gal, Tomas
- 167-177 A stochastic and dynamic routing policy using branching processes with state dependent immigration
by Papastavrou, Jason D.
- 178-190 Multicommodity flow models for spanning trees with hop constraints
by Gouveia, Luis
- 191-200 Random search in the one-dimensional cutting stock problem
by Vahrenkamp, Richard
- 201-210 New polynomial bounds for matroidal knapsacks
by Amado, Ligia & Barcia, Paulo
- 211-230 Approximating probability density functions and their convolutions using orthogonal polynomials
by Badinelli, Ralph D.
- 231-236 Ranking in quadratic integer programming problems
by Gupta, Renu & Bandopadhyaya, Lakshmisree & Puri, M. C.
- 237-239 A note on hashing functions and tabu search algorithms
by Carlton, William B. & Barnes, J. Wesley
November 1996, Volume 94, Issue 3
- 425-438 Imperfect maintenance
by Pham, Hoang & Wang, Hongzhou
- 439-452 Assessing the comparative spatial disadvantage (CSD) of regions in the European Union using non-radial data envelopment analysis methods
by Athanassopoulos, Antreas D.
- 453-466 Resource allocation to defensive marketing and manufacturing strategies
by Ravi Kumar, K. & Hadjinicola, George C.
- 467-476 A model for the relative importance of the criteria in the Multiplicative AHP and SMART
by Lootsma, F. A.
- 477-487 Reducing performance variation in the canning problem
by Arcelus, F. J. & Rahim, M. A.
- 488-504 Approximate representation of probabilistic data in expert systems
by Sarkar, Sumit & Mendelson, Haim & Storey, Veda C.
- 505-516 Combining ranked mean value forecasts
by Mostaghimi, Mehdi
- 517-526 A tree search algorithm for the crew scheduling problem
by Beasley, J. E. & Cao, B.
- 527-547 A periodic review inventory system with two supply modes
by Chiang, Chi & Gutierrez, Genaro J.
- 548-560 Staged and constrained two-dimensional guillotine cutting problems: An AND/OR-graph approach
by Morabito, Reinaldo & Arenales, Marcos N.
- 561-581 Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
by Stadtler, Hartmut
- 582-593 Tight linear programming relaxations of uncapacitated p-hub median problems
by Skorin-Kapov, Darko & Skorin-Kapov, Jadranka & O'Kelly, Morton
- 594-598 Multiobjective programming in optimization of interval objective functions -- A generalized approach
by Chanas, Stefan & Kuchta, Dorota
- 599-609 Comparing the predictive validity of alternatively assessed multi-attribute preference models when relevant decision attributes are missing
by Fry, Phillip C. & Rinks, Dan B. & Ringuest, Jeffrey L.
- 610-617 Kuratowski convergence of the efficient sets in the parametric linear vector semi-infinite optimization
by Todorov, Maxim Ivanov
- 618-625 Evolution program for deterministic and stochastic optimizations
by Gen, Mitsuo & Liu, Baoding & Ida, Kenichi
- 626-630 Conditions for government support of private research and development
by Joglekar, Prafulla & Hamburg, Morris
October 1996, Volume 94, Issue 2
- 213-214 Dagstuhl seminar on "Scheduling in computer and manufacturing systems"
by Blazewicz, Jacek & Ecker, Klaus & Weglarz, Jan
- 215-230 Scheduling multiprocessor tasks -- An overview
by Drozdowski, Maciej
- 231-241 Scheduling multiprocessor tasks with chain constraints
by Blazwicz, Jacek & Liu, Zhen
- 242-251 Preemptive versus nonpreemptive scheduling of biprocessor tasks on dedicated processors
by Kubale, Marek
- 252-260 On the complexity of scheduling with large communication delays
by Bampis, Evripidis & Giannakos, Aristotelis & Konig, Jean-Claude
- 261-270 Minimizing the overhead for some tree-scheduling problems
by Bampis, Evripidis & Guinand, Frederic & Trystram, Denis
- 271-276 Scheduling tasks and communications on a virtual distributed system
by Colin, J. -Y. & Colin, P.
- 277-283 Single machine scheduling with batch deliveries
by Cheng, T. C. Edwin & Gordon, Valery S. & Kovalyov, Mikhail Y.
- 284-291 Single machine scheduling subject to deadlines and resource dependent processing times
by Janiak, Adam & Kovalyov, Mikhail Y.
- 292-301 A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
by Sridharan, V. & Zhou, Z.
- 302-309 Discrete-continuous scheduling problems -- Mean completion time results
by Jozefowska, Joanna & Weglarz, Jan
- 310-320 Total completion time minimization in two-machine job shops with unit-time operations
by Kubiak, Wieslaw & Timkovsky, Vadim
- 321-334 Agricultural product development using multidimensional and multicriteria analyses: The case of wine
by Baourakis, G. & Matsatsinis, N. F. & Siskos, Y.
- 335-348 Tool allocation and machining conditions optimization for CNC machines
by Akturk, M. Selim & Avci, Selcuk
- 349-361 Comparison of iterative improvement techniques for schedule optimization
by Dorn, Jurgen & Girsch, Mario & Skele, Gunther & Slany, Wolfgang
- 362-376 A robustness approach to uncapacitated network design problems
by Gutierrez, Genaro J. & Kouvelis, Panagiotis & Kurawarwala, Abbas A.
- 377-383 A note on "hierarchical models for multi-project planning and scheduling"
by Hartmann, Sonke & Sprecher, Arno
- 384-391 A low-rank bilinear programming approach for sub-optimal solution of the quadratic assignment problem
by Torki, Abdolhamid & Yajima, Yatsutoshi & Enkawa, Takao
- 392-404 A genetic algorithm for the set covering problem
by Beasley, J. E. & Chu, P. C.
- 405-418 PAC-learning a decision tree with pruning
by Kim, Hyunsoo & Koehler, Gary J.
October 1996, Volume 94, Issue 1
- 1-15 Coordinated supply chain management
by Thomas, Douglas J. & Griffin, Paul M.
- 16-28 A two-stage multiobjective scheduling model for [faculty-course-time] assignments
by Badri, Masood A.
- 29-42 The newsstand problem: A capacitated multiple-product single-period inventory problem
by Lau, Hon-Shiang & Hing-Ling Lau, Amy
- 43-53 Tactical design of rail freight networks. Part II: Local search methods with statistical analysis
by Marin, Angel & Salmeron, Javier
- 54-65 An interactive decision support system for the resource Constrained Scheduling Problem
by Norbis, Mario & MacGregor Smith, J.
- 66-86 Multicriteria planar location problems
by Hamacher, H. W. & Nickel, S.
- 87-96 Project selection with discounted returns and multiple constraints
by Kyparisis, George J. & Gupta, Sushil K. & Ip, Chi-Ming
- 97-105 On finding a biconnected spanning planar subgraph with applications to the facilities layout problem
by Goldschmidt, Olivier & Takvorian, Alexis & Yu, Gang
- 106-111 A new adaptive method for extrapolative forecasting algorithms
by Pantazopoulos, Sotiris N. & Pappis, Costas P.
- 112-121 A ratio model for discriminant analysis using linear programming
by Retzlaff-Roberts, Donna L.
- 122-133 The coordinated replenishment dynamic lot-sizing problem with quantity discounts
by Chung, Chia-Shin & Hum, Sin-Hoon & Kirca, Omer