The conditions of efficiency of a PPP for public finances

Author

Listed:
  • Alain Bonnafous

    (LET - Laboratoire d'économie des transports - UL2 - Université Lumière - Lyon 2 - ENTPE - École Nationale des Travaux Publics de l'État - CNRS - Centre National de la Recherche Scientifique)

  • Bruno Faivre d'Arcier

    (LET - Laboratoire d'économie des transports - UL2 - Université Lumière - Lyon 2 - ENTPE - École Nationale des Travaux Publics de l'État - CNRS - Centre National de la Recherche Scientifique)

Abstract

Public authorities seem increasingly to be involving the private sector in financing, building and operating new infrastructures. A lot of reasons are usually given to justify this private sector involvement but the reasons which are the most frequently mentioned relate to the ability of a private operator to manage the construction and operation of the project more efficiently. This amounts to assuming that the Internal Rate of Return (IRR) of the project is not the same depending on whether it is managed by an administration or public body or by a company which in theory keeps abreast of the progress in optimization techniques which is taking place all the time. This difference is explained in many ways: the private sector pays some categories of staff less well, is more flexible, offers faster construction times which speed up the return on investment and is also more able to resist political demands which generate additional costs. Nevertheless, with a public or a private operator, there is a target IRR, very near the standard notion of Weighted Average Capital Cost (WACC), which is larger in the case of the private alternative because this cost must also include the operator's profit. Thus, if the main stake for the national government relates, for each project of public infrastructure, to the need of subsidies, the fundamental issue is the result of two opposite effects: on one hand the effect of a bigger efficiency of the private operator, on the other hand the effect of a lower WACC for the public operator. The objective of this communication is to propose a modelling of the determination of the need of public financing which formalizes these two effects and allows analyzing the conditions under which the PPP would be advantageous for the public finances. We propose for that a model of the mechanism of financing of the projects with a restricted number of parameters. This modelling will be confronted with real French cases of projects of toll highways in order to verify the relevance of the model and to determine the actual range of these parameters and their dispersal. An analysis will finally be proposed, according to the intrinsic profitability of the projects, the conditions under which a PPP can relieve the public spending. This conclusion joins many other authors in arguing against a systematic choice of one or other solution and suggesting rather that the most appropriate solution will depend on the circumstances of each case. The original contribution of this communication consists of an original formalization and of econometric estimations of these circumstances.

Suggested Citation

  • Alain Bonnafous & Bruno Faivre d'Arcier, 2013. "The conditions of efficiency of a PPP for public finances," Post-Print halshs-00876446, HAL.
  • Handle: RePEc:hal:journl:halshs-00876446
    Note: View the original document on HAL open archive server: https://shs.hal.science/halshs-00876446v1
    as

    Download full text from publisher

    File URL: https://shs.hal.science/halshs-00876446v1/document
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2013. "The Basic Public Finance Of Public–Private Partnerships," Journal of the European Economic Association, European Economic Association, vol. 11(1), pages 83-111, February.
    2. Oliver Hart, 2003. "Incomplete Contracts and Public Ownership: Remarks, and an Application to Public-Private Partnerships," Economic Journal, Royal Economic Society, vol. 113(486), pages 69-76, March.
    3. Paul H. Malatesta & Kathryn L. DeWenter, 2001. "State-Owned and Privately Owned Firms: An Empirical Analysis of Profitability, Leverage, and Labor Intensity," American Economic Review, American Economic Association, vol. 91(1), pages 320-334, March.
    4. Alain Bonnafous & Pablo Jensen, 2005. "Ranking Transport Projects by their Socioeconomic Value or Financial Interest rate of return?," Post-Print halshs-00079721, HAL.
    5. Alain Bonnafous, 1999. "Infrastructures publiques et financement privé : le paradoxe de la rentabilité financière," Revue d'Économie Financière, Programme National Persée, vol. 51(1), pages 157-166.
    6. Claudine Desrieux, 2006. "Le rôle de l'autorité publique dans la gestion des services publics locaux. Une approche par la théorie des contrats incomplets," Revue économique, Presses de Sciences-Po, vol. 57(3), pages 529-539.
    7. Maskin, Eric & Tirole, Jean, 2008. "Public-private partnerships and government spending limits," International Journal of Industrial Organization, Elsevier, vol. 26(2), pages 412-420, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jesus Gonzalez-Feliu & Eichi Taniguchi & Bruno Faivre d'Arcier, 2014. "Financing urban logistics projects. From public utility to public-private partnerships," Working Papers halshs-01074619, HAL.
    2. Jesus Gonzalez-Feliu & Pierre Basck & Eleonora Morganti, 2013. "Urban logistics solutions and financing mechanisms: a scenario assessment analysis," European Transport \ Trasporti Europei, ISTIEE, Institute for the Study of Transport within the European Economic Integration, issue 54, pages 1-11.
    3. Crozet, Yves, 2014. "Extension of the high speed rail network in France: Facing the curse that affects PPPs in the rail sector," Research in Transportation Economics, Elsevier, vol. 48(C), pages 401-409.
    4. Bonnafous, Alain, 2015. "The economic regulation of French highways: Just how private did they become?," Transport Policy, Elsevier, vol. 41(C), pages 33-41.
    5. Yves Crozet, 2016. "Hyper-mobilité et politiques publiques - Changer d'époque ?," Post-Print halshs-01328814, HAL.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. David Martimort & Flavio Menezes & Myrna Wooders & ELISABETTA IOSSA & DAVID MARTIMORT, 2015. "The Simple Microeconomics of Public-Private Partnerships," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 17(1), pages 4-48, February.
    2. Baños-Pino, José F. & Boto-García, David & Zapico, Emma, 2021. "Persistence and dynamics in the efficiency of toll motorways: The Spanish case," Efficiency Series Papers 2021/03, University of Oviedo, Department of Economics, Oviedo Efficiency Group (OEG).
    3. Marco Buso & Luciano Greco, 2023. "The optimality of public–private partnerships under financial and fiscal constraints," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 32(4), pages 856-881, October.
    4. Herrera Dappe,Matias & Melecky,Martin & Turkgulu,Burak, 2022. "Fiscal Risks from Early Termination of Public-Private Partnerships in Infrastructure," Policy Research Working Paper Series 9972, The World Bank.
    5. Eduardo Engel & Ronald D. Fischer & Alexander Galetovic, 2020. "When and How to Use Public-Private Partnerships in Infrastructure: Lessons from the International Experience," NBER Chapters, in: Economic Analysis and Infrastructure Investment, pages 333-364, National Bureau of Economic Research, Inc.
    6. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    7. Buso, Marco & Marty, Frederic & Tran, Phuong Tra, 2017. "Public-private partnerships from budget constraints: Looking for debt hiding?," International Journal of Industrial Organization, Elsevier, vol. 51(C), pages 56-84.
    8. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2009. "Soft Budgets and Renegotiations in Public-Private Partnerships," Cowles Foundation Discussion Papers 1723, Cowles Foundation for Research in Economics, Yale University.
    9. Bonnafous, Alain, 2010. "Programming, optimal pricing and partnership contract for infrastructures in PPPs," Research in Transportation Economics, Elsevier, vol. 30(1), pages 15-22.
    10. Alain Bonnafous & Pablo Jensen & William Roy, 2006. "Le cofinancement usager - contribuable et le partenariat public-privé changent les termes de l'évaluation des programmes d'investissement public," Economie & Prévision, La Documentation Française, vol. 0(4), pages 15-30.
    11. Deng, Zhongqi & Song, Shunfeng & Chen, Yongjun, 2016. "Private participation in infrastructure project and its impact on the project cost," China Economic Review, Elsevier, vol. 39(C), pages 63-76.
    12. João M. Pinto & Mário Coutinho dos Santos & Pedro Verga Matos, 2021. "Contracting Out Public Transit Services: An Incentive Performance-Based Approach," Working Papers de Economia (Economics Working Papers) 02, Católica Porto Business School, Universidade Católica Portuguesa.
    13. Alain Bonnafous, 2005. "Infrastructure Funding and Public-Private Partnerships," Post-Print halshs-00079768, HAL.
    14. Bonnafous, Alain, 2015. "The economic regulation of French highways: Just how private did they become?," Transport Policy, Elsevier, vol. 41(C), pages 33-41.
    15. Alain Bonnafous & Pablo Jensen, 2005. "Ranking Transport Projects by their Socioeconomic Value or Financial Interest Rate of Return?," Post-Print halshs-00068313, HAL.
    16. Qu Deng & Hezun Li & Hong Yue, 2024. "Public–private partnership, cost of debt and accounting conservatism," Economics and Politics, Wiley Blackwell, vol. 36(1), pages 432-482, March.
    17. Irina Filatova & Liubov Nikolaichuk & Dokka Zakaev & Igor Ilin, 2021. "Public-Private Partnership as a Tool of Sustainable Development in the Oil-Refining Sector: Russian Case," Sustainability, MDPI, vol. 13(9), pages 1-23, May.
    18. Penyalver, Domingo & Turró, Mateu & Williamson, John B., 2019. "Measuring the value for money of transport infrastructure procurement; an intergenerational approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 119(C), pages 238-254.
    19. Bonnafous, Alain, 2012. "The use of PPP's and the profitability rate paradox," Research in Transportation Economics, Elsevier, vol. 36(1), pages 45-49.
    20. Baños-Pino, José F. & Boto-García, David & Zapico, Emma, 2022. "Persistence and dynamics in the efficiency of toll motorways: The Spanish case," Economics of Transportation, Elsevier, vol. 31(C).

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;
    ;

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:halshs-00876446. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.