IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v170y2006i2p376-390.html
   My bibliography  Save this article

Variable employee productivity in workforce scheduling

Author

Listed:
  • Thompson, Gary M.
  • Goodale, John C.

Abstract

No abstract is available for this item.

Suggested Citation

  • Thompson, Gary M. & Goodale, John C., 2006. "Variable employee productivity in workforce scheduling," European Journal of Operational Research, Elsevier, vol. 170(2), pages 376-390, April.
  • Handle: RePEc:eee:ejores:v:170:y:2006:i:2:p:376-390
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00513-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fred F. Easton & Donald F. Rossin, 1991. "Sufficient Working Subsets for the Tour Scheduling Problem," Management Science, INFORMS, vol. 37(11), pages 1441-1451, November.
    2. Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
    3. Thomas J. Holloran & Judson E. Byrn, 1986. "United Airlines Station Manpower Planning System," Interfaces, INFORMS, vol. 16(1), pages 39-50, February.
    4. Brusco, Michael J. & Jacobs, Larry W., 1998. "Eliminating redundant columns in continuous tour scheduling problems," European Journal of Operational Research, Elsevier, vol. 111(3), pages 518-525, December.
    5. D. Dowling & M. Krishnamoorthy & H. Mackenzie & D. Sier, 1997. "Staff rostering at a large international airport," Annals of Operations Research, Springer, vol. 72(0), pages 125-147, January.
    6. Vincent A. Mabert & Charles A. Watts, 1982. "A Simulation Analysis of Tour-Shift Construction Procedures," Management Science, INFORMS, vol. 28(5), pages 520-532, May.
    7. Vincent A. Mabert, 1979. "A Case Study of Encoder Shift Scheduling under Uncertainty," Management Science, INFORMS, vol. 25(7), pages 623-631, July.
    8. Beaumont, Nicholas, 1997. "Scheduling staff using mixed integer programming," European Journal of Operational Research, Elsevier, vol. 98(3), pages 473-484, May.
    9. Easton, Fred F. & Mansour, Nashat, 1999. "A distributed genetic algorithm for deterministic and stochastic labor scheduling problems," European Journal of Operational Research, Elsevier, vol. 118(3), pages 505-523, November.
    10. Michael J. Brusco & Larry W. Jacobs, 1998. "Personnel Tour Scheduling When Starting-Time Restrictions Are Present," Management Science, INFORMS, vol. 44(4), pages 534-547, April.
    11. M.J. Brusco & L.W. Jacobs & G.M. Thompson, 1999. "A morphing procedure to supplement a simulated annealing heuristic for cost‐ andcoverage‐correlated set‐covering problems," Annals of Operations Research, Springer, vol. 86(0), pages 611-627, January.
    12. Hamilton Emmons & Du-Shean Fuh, 1997. "Sizing and scheduling a full-time and part-time workforce with off-day and off-weekend constraints," Annals of Operations Research, Springer, vol. 70(0), pages 473-492, April.
    13. Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
    14. L. J. Krajewski & L. P. Ritzman & Phil McKenzie, 1980. "Shift Scheduling in Banking Operations: A Case Application," Interfaces, INFORMS, vol. 10(2), pages 1-8, April.
    15. Peter J. Kolesar & Kenneth L. Rider & Thomas B. Crabill & Warren E. Walker, 1975. "A Queuing-Linear Programming Approach to Scheduling Police Patrol Cars," Operations Research, INFORMS, vol. 23(6), pages 1045-1062, December.
    16. Bruce H. Andrews & Henry L. Parsons, 1989. "L. L. Bean Chooses a Telephone Agent Scheduling System," Interfaces, INFORMS, vol. 19(6), pages 1-9, December.
    17. Alberto Caprara & Paolo Toth & Matteo Fischetti, 2000. "Algorithms for the Set Covering Problem," Annals of Operations Research, Springer, vol. 98(1), pages 353-371, December.
    18. Stephen E. Bechtold & Ralph E. Janaro & De Witt L. Sumners, 1984. "Maximization of Labor Productivity Through Optimal Rest-Break Schedules," Management Science, INFORMS, vol. 30(12), pages 1442-1458, December.
    19. Brusco, Michael J. & Jacobs, Larry W., 1995. "Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations," European Journal of Operational Research, Elsevier, vol. 86(2), pages 249-261, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ighravwe, D.E. & Oke, S.A., 2014. "A non-zero integer non-linear programming model for maintenance workforce sizing," International Journal of Production Economics, Elsevier, vol. 150(C), pages 204-214.
    2. Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
    3. Marta Rocha & José Oliveira & Maria Carravilla, 2014. "A constructive heuristic for staff scheduling in the glass industry," Annals of Operations Research, Springer, vol. 217(1), pages 463-478, June.
    4. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    5. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    6. Fernandes, Rui & Gouveia, Borges & Pinho, Carlos, 2013. "A real options approach to labour shifts planning under different service level targets," European Journal of Operational Research, Elsevier, vol. 231(1), pages 182-189.
    7. Lin, Shih-Wei & Ying, Kuo-Ching, 2014. "Minimizing shifts for personnel task scheduling problems: A three-phase algorithm," European Journal of Operational Research, Elsevier, vol. 237(1), pages 323-334.
    8. Farahani, Poorya & Grunow, Martin & Akkerman, Renzo, 2013. "Design and operations planning of municipal foodservice systems," International Journal of Production Economics, Elsevier, vol. 144(1), pages 383-396.
    9. Farzad Zaerpour & Marco Bijvank & Huiyin Ouyang & Zhankun Sun, 2022. "Scheduling of Physicians with Time‐Varying Productivity Levels in Emergency Departments," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 645-667, February.
    10. Cao, Nguyen Vi & Fragniere, Emmanuel, 2014. "A Service Production Planning Model Integrating Human Risk Factors," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Kersten, Wolfgang & Blecker, Thorsten & Ringle, Christian M. (ed.), Next Generation Supply Chains: Trends and Opportunities. Proceedings of the Hamburg International Conference of Logistics (HICL), Vol. 18, volume 18, pages 345-359, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
    11. Andreas Drexl & Martin Mundschenk, 2008. "Long-term staffing based on qualification profiles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 68(1), pages 21-47, August.
    12. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    13. Gang Li & Joy M. Field & Hongxun Jiang & Tian He & Youming Pang, 2019. "Decision Models for Workforce and Technology Planning in Services," Papers 1909.12829, arXiv.org.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Thompson, Gary M. & Pullman, Madeleine E., 2007. "Scheduling workforce relief breaks in advance versus in real-time," European Journal of Operational Research, Elsevier, vol. 181(1), pages 139-155, August.
    2. Brusco, Michael J. & Jacobs, Larry W., 2001. "Starting-time decisions in labor tour scheduling: An experimental analysis and case study," European Journal of Operational Research, Elsevier, vol. 131(3), pages 459-475, June.
    3. Easton, F. F. & Rossin, D. F., 1997. "Overtime schedules for full-time service workers," Omega, Elsevier, vol. 25(3), pages 285-299, June.
    4. Castillo, Ignacio & Joro, Tarja & Li, Yong Yue, 2009. "Workforce scheduling with multiple objectives," European Journal of Operational Research, Elsevier, vol. 196(1), pages 162-170, July.
    5. Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
    6. M J Brusco & T R Johns, 2011. "An integrated approach to shift-starting time selection and tour-schedule construction," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1357-1364, July.
    7. Michael J. Brusco & Larry W. Jacobs, 1998. "Personnel Tour Scheduling When Starting-Time Restrictions Are Present," Management Science, INFORMS, vol. 44(4), pages 534-547, April.
    8. Easton, Fred F. & Mansour, Nashat, 1999. "A distributed genetic algorithm for deterministic and stochastic labor scheduling problems," European Journal of Operational Research, Elsevier, vol. 118(3), pages 505-523, November.
    9. Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
    10. Gary M. Thompson, 1997. "Labor staffing and scheduling models for controlling service levels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 719-740, December.
    11. Giovanni Felici & Claudio Gentile, 2004. "A Polyhedral Approach for the Staff Rostering Problem," Management Science, INFORMS, vol. 50(3), pages 381-393, March.
    12. Batta, Rajan & Berman, Oded & Wang, Qian, 2007. "Balancing staffing and switching costs in a service center with flexible servers," European Journal of Operational Research, Elsevier, vol. 177(2), pages 924-938, March.
    13. Linda V. Green & Peter J. Kolesar & João Soares, 2001. "Improving the Sipp Approach for Staffing Service Systems That Have Cyclic Demands," Operations Research, INFORMS, vol. 49(4), pages 549-564, August.
    14. Masoud Yaghini & Mohammad Karimi & Mohadeseh Rahbar, 2015. "A set covering approach for multi-depot train driver scheduling," Journal of Combinatorial Optimization, Springer, vol. 29(3), pages 636-654, April.
    15. Edmund Burke & Jingpeng Li & Rong Qu, 2012. "A Pareto-based search methodology for multi-objective nurse scheduling," Annals of Operations Research, Springer, vol. 196(1), pages 91-109, July.
    16. Brusco, Michael J. & Jacobs, Larry W., 1995. "Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations," European Journal of Operational Research, Elsevier, vol. 86(2), pages 249-261, October.
    17. Robbins, Thomas R. & Harrison, Terry P., 2010. "A stochastic programming model for scheduling call centers with global Service Level Agreements," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1608-1619, December.
    18. Linda V. Green & Peter J. Kolesar, 1998. "A Note on Approximating Peak Congestion in Mt/G/\infty Queues with Sinusoidal Arrivals," Management Science, INFORMS, vol. 44(11-Part-2), pages 137-144, November.
    19. Burke, Edmund K. & Li, Jingpeng & Qu, Rong, 2010. "A hybrid model of integer programming and variable neighbourhood search for highly-constrained nurse rostering problems," European Journal of Operational Research, Elsevier, vol. 203(2), pages 484-493, June.
    20. Brusco, Michael J., 2015. "A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives," European Journal of Operational Research, Elsevier, vol. 247(1), pages 46-59.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:170:y:2006:i:2:p:376-390. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.