IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v118y1999i3p505-523.html
   My bibliography  Save this article

A distributed genetic algorithm for deterministic and stochastic labor scheduling problems

Author

Listed:
  • Easton, Fred F.
  • Mansour, Nashat

Abstract

No abstract is available for this item.

Suggested Citation

  • Easton, Fred F. & Mansour, Nashat, 1999. "A distributed genetic algorithm for deterministic and stochastic labor scheduling problems," European Journal of Operational Research, Elsevier, vol. 118(3), pages 505-523, November.
  • Handle: RePEc:eee:ejores:v:118:y:1999:i:3:p:505-523
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(98)00327-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fred F. Easton & Donald F. Rossin, 1991. "Sufficient Working Subsets for the Tour Scheduling Problem," Management Science, INFORMS, vol. 37(11), pages 1441-1451, November.
    2. Turgut Aykin, 1996. "Optimal Shift Scheduling with Multiple Break Windows," Management Science, INFORMS, vol. 42(4), pages 591-602, April.
    3. Michael J. Brusco & Larry W. Jacobs & Robert J. Bongiorno & Duane V. Lyons & Baoxing Tang, 1995. "Improving Personnel Scheduling at Airline Stations," Operations Research, INFORMS, vol. 43(5), pages 741-751, October.
    4. Philip E. Taylor & Stephen J. Huxley, 1989. "A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization-Based Decision Support System," Interfaces, INFORMS, vol. 19(1), pages 4-24, February.
    5. Vincent A. Mabert & Charles A. Watts, 1982. "A Simulation Analysis of Tour-Shift Construction Procedures," Management Science, INFORMS, vol. 28(5), pages 520-532, May.
    6. John J. Bartholdi, 1981. "A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering," Operations Research, INFORMS, vol. 29(3), pages 501-510, June.
    7. Ahmad I. Z. Jarrah & Jonathan F. Bard & Anura H. deSilva, 1994. "Solving Large-Scale Tour Scheduling Problems," Management Science, INFORMS, vol. 40(9), pages 1124-1144, September.
    8. Bechtold, Stephen E. & Brusco, Michael J., 1994. "Working set generation methods for labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 74(3), pages 540-551, May.
    9. Willie B. Henderson & William L. Berry, 1976. "Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis," Management Science, INFORMS, vol. 22(12), pages 1372-1380, August.
    10. Fred Glover, 1990. "Tabu Search: A Tutorial," Interfaces, INFORMS, vol. 20(4), pages 74-94, August.
    11. Bruce Andrews & Henry Parsons, 1993. "Establishing Telephone-Agent Staffing Levels through Economic Optimization," Interfaces, INFORMS, vol. 23(2), pages 14-20, April.
    12. Gary M. Thompson, 1995. "Improved Implicit Optimal Modeling of the Labor Shift Scheduling Problem," Management Science, INFORMS, vol. 41(4), pages 595-607, April.
    13. Bruce H. Andrews & Henry L. Parsons, 1989. "L. L. Bean Chooses a Telephone Agent Scheduling System," Interfaces, INFORMS, vol. 19(6), pages 1-9, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Edmund Burke & Jingpeng Li & Rong Qu, 2012. "A Pareto-based search methodology for multi-objective nurse scheduling," Annals of Operations Research, Springer, vol. 196(1), pages 91-109, July.
    2. U Aickelin & E K Burke & J Li, 2007. "An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(12), pages 1574-1585, December.
    3. K A H Kobbacy & S Vadera & M H Rasmy, 2007. "AI and OR in management of operations: history and trends," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 10-28, January.
    4. Restrepo, María I. & Gendron, Bernard & Rousseau, Louis-Martin, 2017. "A two-stage stochastic programming approach for multi-activity tour scheduling," European Journal of Operational Research, Elsevier, vol. 262(2), pages 620-635.
    5. Simon Taub & Oleg S Pianykh, 2022. "An alternative to the black box: Strategy learning," PLOS ONE, Public Library of Science, vol. 17(3), pages 1-15, March.
    6. Lü, Zhipeng & Hao, Jin-Kao, 2012. "Adaptive neighborhood search for nurse rostering," European Journal of Operational Research, Elsevier, vol. 218(3), pages 865-876.
    7. Chiaramonte, Michael V. & Chiaramonte, Laurel M., 2008. "An agent-based nurse rostering system under minimal staffing conditions," International Journal of Production Economics, Elsevier, vol. 114(2), pages 697-713, August.
    8. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    9. Kibaek Kim & Sanjay Mehrotra, 2015. "A Two-Stage Stochastic Integer Programming Approach to Integrated Staffing and Scheduling with Application to Nurse Management," Operations Research, INFORMS, vol. 63(6), pages 1431-1451, December.
    10. Castillo, Ignacio & Joro, Tarja & Li, Yong Yue, 2009. "Workforce scheduling with multiple objectives," European Journal of Operational Research, Elsevier, vol. 196(1), pages 162-170, July.
    11. Burke, Edmund K. & Li, Jingpeng & Qu, Rong, 2010. "A hybrid model of integer programming and variable neighbourhood search for highly-constrained nurse rostering problems," European Journal of Operational Research, Elsevier, vol. 203(2), pages 484-493, June.
    12. Thompson, Gary M. & Pullman, Madeleine E., 2007. "Scheduling workforce relief breaks in advance versus in real-time," European Journal of Operational Research, Elsevier, vol. 181(1), pages 139-155, August.
    13. Thompson, Gary M. & Goodale, John C., 2006. "Variable employee productivity in workforce scheduling," European Journal of Operational Research, Elsevier, vol. 170(2), pages 376-390, April.
    14. Li, Jingpeng & Burke, Edmund K. & Curtois, Tim & Petrovic, Sanja & Qu, Rong, 2012. "The falling tide algorithm: A new multi-objective approach for complex workforce scheduling," Omega, Elsevier, vol. 40(3), pages 283-293.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Michael J. Brusco & Larry W. Jacobs, 1998. "Personnel Tour Scheduling When Starting-Time Restrictions Are Present," Management Science, INFORMS, vol. 44(4), pages 534-547, April.
    2. Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
    3. S Casado & M Laguna & J Pacheco, 2005. "Heuristical labour scheduling to optimize airport passenger flows," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 649-658, June.
    4. Easton, F. F. & Rossin, D. F., 1997. "Overtime schedules for full-time service workers," Omega, Elsevier, vol. 25(3), pages 285-299, June.
    5. Casado Yusta, S. & Pacheco Bonrostro, J., 2003. "Estudio comparativo de diferentes estrategias metaheurísticas para la resolución del labor scheduling problem./Analisys of different methauristas for solving labor scheduling," Estudios de Economia Aplicada, Estudios de Economia Aplicada, vol. 21, pages 537-554, December.
    6. Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
    7. Brusco, Michael J. & Jacobs, Larry W., 1995. "Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations," European Journal of Operational Research, Elsevier, vol. 86(2), pages 249-261, October.
    8. Noah Gans & Ger Koole & Avishai Mandelbaum, 2003. "Telephone Call Centers: Tutorial, Review, and Research Prospects," Manufacturing & Service Operations Management, INFORMS, vol. 5(2), pages 79-141, September.
    9. Giovanni Felici & Claudio Gentile, 2004. "A Polyhedral Approach for the Staff Rostering Problem," Management Science, INFORMS, vol. 50(3), pages 381-393, March.
    10. Tolga Çezik & Oktay Günlük & Hanan Luss, 2001. "An integer programming model for the weekly tour scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(7), pages 607-624, October.
    11. Aykin, Turgut, 2000. "A comparative evaluation of modeling approaches to the labor shift scheduling problem," European Journal of Operational Research, Elsevier, vol. 125(2), pages 381-397, September.
    12. Anuj Mehrotra & Kenneth E. Murphy & Michael A. Trick, 2000. "Optimal shift scheduling: A branch‐and‐price approach," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(3), pages 185-200, April.
    13. Brusco, Michael J. & Jacobs, Larry W., 2001. "Starting-time decisions in labor tour scheduling: An experimental analysis and case study," European Journal of Operational Research, Elsevier, vol. 131(3), pages 459-475, June.
    14. Haase, Knut, 1999. "Retail business staff scheduling under complex labor relations," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 511, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Gary M. Thompson, 1997. "Labor staffing and scheduling models for controlling service levels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 719-740, December.
    16. Thompson, Gary M. & Pullman, Madeleine E., 2007. "Scheduling workforce relief breaks in advance versus in real-time," European Journal of Operational Research, Elsevier, vol. 181(1), pages 139-155, August.
    17. Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
    18. Linda V. Green & Peter J. Kolesar & João Soares, 2001. "Improving the Sipp Approach for Staffing Service Systems That Have Cyclic Demands," Operations Research, INFORMS, vol. 49(4), pages 549-564, August.
    19. Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
    20. Castillo, Ignacio & Joro, Tarja & Li, Yong Yue, 2009. "Workforce scheduling with multiple objectives," European Journal of Operational Research, Elsevier, vol. 196(1), pages 162-170, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:118:y:1999:i:3:p:505-523. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.