Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Additional information is available for the following registered editor(s):
Stefan Minner .
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
August 1997, Volume 51, Issue 1-2
- 37-46 Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure
by Kogan, Konstantin & Khmelnitsky, Eugene & Shtub, Avraham & Maimon, Oded
- 47-57 Team-oriented assembly system design: A new approach
by Bukchin, Joseph & Darel, Ezey & Rubinovitz, Jacob
- 59-67 Integrating corporate learning with project management
by Ayas, Karen
- 69-81 The Metered Inventory Routing Problem, an integrative heuristic algorithm
by Herer, Yale T. & Levy, Roberto
- 83-98 Operations management of multiple machine automatic warehousing systems
by Eben-Chaime, Moshe & Pliskin, Nava
- 99-107 Design of a simulation library for CIM
by Pollatschek, M. A.
- 109-113 Real-time operational control of an FMS with full routing flexibility
by Byrne, M. D. & Chutima, P.
- 115-122 A parallel genetic-neuro scheduler for job-shop scheduling problems
by Lee, H. C. & Dagli, Cihan H.
- 123-134 Analytical approach of determining job division in manual assembly systems
by Zulch, Gert & Braun, Wolfgang J. & Schiller, Emmerich F.
- 135-148 Design and testing of piezoelectric actuator-controlled boring bar for active compensation of cutting force induced errors
by Chiu, W. M. & Chan, K. W.
- 149-153 Investigation of chip formation during milling
by Kovac, Pavel & Sidjanin, Leposava
June 1997, Volume 50, Issue 2-3
- 65-68 Business process reengineering: Modelling and analysis
by Gunasekaran, A. & Ichimura, T.
- 69-78 An example of the application of production system design tools for the implementation of business process reengineering
by Jones, Thomas M. & Noble, James S. & Crowe, Thomas J.
- 79-89 Evaluating product and process design changes with warranty data
by Majeske, Karl D. & Lynch-Caris, Terri & Herrin, Gary
- 91-104 The role of information technology in business process reengineering
by Gunasekaran, A. & Nath, B.
- 105-116 Reengineering the production planning process in the food industry
by Houghton, Erne & Portougal, Victor
- 117-128 The effects of task and information asymmetry on business process redesign
by Seidmann, Abraham & Sundararajan, Arun
- 129-140 Formal business process engineering based on graph grammars
by Klauck, Christoph & Muller, Heinz-Jurgen
- 141-153 A strategic alignment approach for effective business process reengineering: linking strategy, processes and customers for competitive advantage
by Lockamy, Archie III & Smith, Wilbur I.
- 155-168 Market share and warranty costs for renewable warranty programs
by Mitra, Amitava & Patankar, Jayprakash G.
- 169-181 From TQM to BPR: Two case studies in personnel administration
by De Bruyn, Barbara & Gelders, Ludo
- 183-197 Process reengineering: A review of enablers
by Love, P. E. D. & Gunasekaran, A.
- 199-210 Empirically testing the antecedents of BPR success
by Guimaraes, Tor
- 211-223 A conceptual and analytical framework for business process reengineering
by Chan, Stephen L. & Choi, Chung For
- 225-243 Evolving requirements for a reengineering model for ferrous foundries in India -- An experience
by Shivappa, D. N. & Babu, A. Subash
- 245-259 Empirically testing ES success factors in business process reengineering
by Guimaraes, Tor & Yoon, Youngohc & Clevenson, Aaron
- 261-274 The strategic evaluation of candidate business process reengineering projects
by Sarkis, Joseph & Presley, Adrien & Liles, Donald
May 1997, Volume 50, Issue 1
- 1-12 Yield comparison of push and pull control methods on production systems with unreliable machines
by Ou, Jihong & Jiang, Jiong
- 13-22 Using "look ahead" techniques in job-shop scheduling with random operations
by Golenko-Ginzburg, Dimitri & Gonik, Aharon
- 23-33 Identifying investment opportunities for advanced manufacturing systems with comparative-integrated performance measurement
by Kim, Gyutai & Park, Chan S. & Yoon, K. Paul
- 35-41 Optimal inventory policies for perishable items with time-dependent demand
by Hariga, Moncer
- 43-49 Business process re-engineering new applications for the techniques of production engineering
by Macintosh, Robert
- 51-59 Product ranking, budget allocation and monopolistic pricing in a multiproduct firm an application at Nonius, a division of Delft Instruments
by van Maaren, Hans & Molenkamp, Jan Bertus & Reus, Henk Jan
- 61-61 Observation on the economic lot scheduling problem: Theory and practice
by Goyal, S. K.
May 1997, Volume 49, Issue 3
- 189-204 A decision analysis model for comparing well completion techniques
by Stewart, Brian R. & Lee, Jim
- 205-213 An EOQ model for deteriorating items with a linear trend in demand and shortages in all cycles
by Chakrabarti, T. & Chaudhuri, K. S.
- 215-223 An extended EMQ model for a failure prone machine with general lifetime distribution
by Kim, Chang Hyun & Hong, Yushin
- 225-235 Scheduling in an automated flow shop to minimize cost: Backward-meta scheduling method
by Kawtummachai, Ruengsak & Yanagawa, Yoshinari & Ohashi, Kazumasa & Miyazaki, Shigeji
- 237-247 Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
by Sarker, Bhaba R. & Coates, Eyler Robert
- 249-254 The restricted profit function and the application of the generalised Leontief and the translog functional forms
by Bergman, Mats A.
- 255-263 An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence-dependent setup times of jobs
by Parthasarathy, Srinivasaraghavan & Rajendran, Chandrasekharan
- 265-283 Assessing success factors for implementing CE a case study in Hong Kong electronics industry by AHP
by Tummala, V. M. Rao & Chin, K. S. & Ho, S. H.
April 1997, Volume 49, Issue 2
- 85-90 Selection of postharvest technology routes by mixed-integer linear programming
by Maia, Luis Otavio Aleotti & Lago, Regina Araujo & Qassim, Raad Yahya
- 91-99 The optimum target values for a production process with three-class screening
by Lee, Min Koo & Jang, Joong Soon
- 101-115 Computational model for a Belgian chemical engineering plant cost index
by Pintelon, Liliane & Geeroms, Kris
- 117-130 Technological progress and optimal factor demand
by Nti, Kofi O. & Dompere, Kofi K.
- 131-143 Order release and sequence-dependent setup times
by Missbauer, H.
- 145-156 A production order quantity model with stochastic demand for a chocolate milk manufacturer
by de Castro, Edgar L. & Tabucanon, Mario T. & Nagarur, Nagen N.
- 157-174 Stock allocation in general multi-echelon distribution systems with (R, S) order-up-to-policies
by van der Heijden, M. C. & Diks, E. B. & de Kok, A. G.
- 175-182 Setup utilization as a performance indicator in production planning and control
by Kuik, Roelof & Tielemans, Peter F. J.
March 1997, Volume 49, Issue 1
- 1-15 Economic-statistical design of an adaptive chart
by Prabhu, Sharad S. & Montgomery, Douglas C. & Runger, George C.
- 17-28 Revision of industrial supply conditions and game theory
by Gallo, Paolo & Luciano, Elisa & Peccati, Lorenzo
- 29-44 Capacity driven due date settings in make-to-order production systems
by Ozdamar, Linet & Yazgac, Tulin
- 45-54 Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation
by Fumero, Francesca & Vercellis, Carlo
- 55-64 A multicriteria approach to the selection of preventive maintenance intervals
by Chareonsuk, Chaichan & Nagarur, Nagen & Tabucanon, Mario T.
- 65-75 Economic and strategic justification of AMT inferences from industrial practices
by Small, Michael H. & Chen, Injazz J.
- 77-82 A note on scheduling of two-stage flow shop with multiple processors
by Suresh, V.
February 1997, Volume 48, Issue 3
- 207-225 An integrated dynamic performance measurement system for improving manufacturing competitiveness
by Ghalayini, Alaa M. & Noble, James S. & Crowe, Thomas J.
- 227-236 An order-level lot size inventory model with inventory-level dependent demand and deterioration
by Sarker, Bhaba R. & Mukherjee, Subhasis & Balan, Chidambaram V.
- 237-247 Selection of routes in a flexible manufacturing facility
by Das, Sanchoy K. & Nagendra, Prashanth
- 249-257 The scientific approach to problem solving and decision support systems
by Ho, J. K. K. & Sculli, D.
- 259-265 Efficiency of size sorting of fish
by Booman, A. C. & Parin, M. A. & Zugarramurdi, A.
- 267-267 Erratum : "Cover-time planning, a method for calculation of material requirements" [Int. J. Production Economics 41 (1995) 355-368]
by Segerstedt, Anders
January 1997, Volume 48, Issue 2
- 109-119 Examples of production dynamics control for cost efficiency
by Holmstrom, Jan & Hameri, A. -P. & Nielsen, Niels H. & Pankakoshi, Juha & Slotte, Jonas
- 121-128 Some results on implementing a multi-item multi-constraint single-period inventory model
by Lau, Hon-Shiang & Lau, Amy Hing-Ling
- 129-139 Analytical evaluation of heuristics performance for the single-level lot-sizing problem for products with constant demand
by Ganas, Ioannis S. & Papachristos, Sotirios
- 141-155 Economic lot size model for price-dependent demand under quantity and freight discounts
by Burwell, Timothy H. & Dave, Dinesh S. & Fitzpatrick, Kathy E. & Roy, Melvin R.
- 157-165 Policies for lot sizing with setup learning
by Rachamadugu, Ram & Tan, Chong Leng
- 167-175 A deterministic order level inventory model for deteriorating items with two storage facilities
by Benkherouf, Lakdere
- 177-185 A goal programming approach to mixed-model assembly line balancing problem
by Gokcen, Hadi & Erel, Erdal
- 187-204 Scheduling policies for remanufacturing
by Guide, V. Daniel R. & Kraus, Mark E. & Srivastava, Rajesh
January 1997, Volume 48, Issue 1
- 1-6 Comparison of echelon stock and installation stock policies with policy adjusted order quantities
by Axsater, Sven & Juntti, Lars
- 7-19 Adoption and implementation of advanced manufacturing technology in Singapore
by Zhao, Hongxin & Co, Henry C.
- 21-28 Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies
by Moon, Ilkyeong & Choi, Sangjin
- 29-37 Stochastic network project scheduling with non-consumable limited resources
by Golenko-Ginzburg, Dimitri & Gonik, Aharon
- 39-48 An empirical analysis of productivity and complexity for flexible manufacturing systems
by Sarkis, Joseph
- 49-61 Cluster goodness: A new measure of performance for cluster formation in the design of cellular manufacturing systems
by Nair, G. Jayakrishnan & Narendran, T. T.
- 63-72 Batching to minimize total production time for two part types
by Ching, Chung Yaw & Liao, Ching-Jong & Wu, Chutao John
- 73-86 The scheduling of economic lot sizes on volume flexible production systems
by Khouja, Moutaz
- 87-105 Efficient dispatching rules for scheduling in a job shop
by Holthaus, Oliver & Rajendran, Chandrasekharan
December 1996, Volume 46-47, Issue 1
- 1-1 Preface
by Grubbstrom, Robert W. & Hinterhuber, Hans H.
- 1-12 Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems
by Bertrand, J. W. M. & van Ooijen, H. P. G.
- 13-26 Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study
by Fortemps, Ph. & Ost, Ch. & Pirlot, M. & Teghem, J. & Tuyttens, D.
- 27-38 Concepts for improving scheduling decisions: An application in the chemical industry
by Frauendorfer, K. & Konigsperger, E.
- 39-54 Hierarchical decision-making model for planning and controlling stochastic projects
by Golenko-Ginzburg, Dimitri & Gonik, Aharon & Kesler, Shmuel
- 55-63 A multilevel decision-making system with multiple resources for controlling cotton harvesting
by Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir
- 65-87 Periodic production scheduling at a fastener manufacturer
by McGee, Victor E. & Pyke, David F.
- 89-108 Managing and reducing total cycle time: models and analysis
by Miltenburg, John & Sparling, David
- 109-118 Modelling production scheduling systems
by Schmidt, Gunter
- 119-125 Parallel machine scheduling with release dates, due dates and family setup times
by Schutten, J. M. J. & Leussink, R. A. M.
- 127-136 Formulas of MRP
by Segerstedt, Anders
- 137-152 Complexity and uncertainty of materials procurement in assembly situations
by van der Vaart, J. T. & de Vries, J. & Wijngaard, J.
- 153-164 Production planning in the case of uncertain individual demand Extension for an MRP II concept
by Zapfel, Gunther
- 165-179 Capacity planning and lead time management
by Zijm, W. H. M. & Buitenhek, R.
- 181-196 Quantifying the relative improvements of redesign strategies in a P.C. supply chain
by Berry, D. & Naim, M. M.
- 197-209 A framework for selecting and introducing appropriate production technology in developing countries
by Bruun, Peter & Mefford, Robert N.
- 211-217 Evaluating designing principles of Japanese production systems
by Frohner, K. -D. & Iwata, K.
- 219-231 Responding to customer enquiries in make-to-order companies Problems and solutions
by Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio
- 233-240 Evaluating manufacturing strategy formulation processess
by Platts, K. W. & Mills, J. F. & Neely, A. D. & Gregory, M. J. & Richards, A. H.
- 241-250 A new method for evaluating worst- and best-case (WBC) economic consequences of technological development
by Schjaer-Jacobsen, Hans
- 251-260 Shaping the organization of order processing with the simulation tool FEMOS
by Zulch, Gert & Grobel, Thomas
- 261-276 Stochastic lot-sizing: Solution and heuristic methods
by Dellaert, N. P. & Melo, M. T.
- 277-284 Global inventory control in an academic hospital
by Dellaert, Nico & van de Poel, Erik
- 285-295 Two replenishment strategies for the lost sales inventory model: A comparison
by van Donselaar, Karel & de Kok, Ton & Rutten, Werner
- 297-309 Safety production plans in MRP-systems using transform methodology
by Grubbstrom, Robert W. & Molinder, Anders
- 311-321 Optimal allocation policies in a two-echelon inventory problem with fixed shipment costs
by Gullu, Refik & Erkip, Nesim
- 323-338 Analysis of order-up-to-S inventory policies under cash flow market value maximization
by Inderfurth, Karl & Schefer, Rainer
- 339-350 An (s, Q) inventory model with remanufacturing and disposal
by van der Laan, Erwin & Dekker, Rommert & Salomon, Marc & Ridder, Ad
- 351-358 Transfer pricing of a service department facing random demand
by Johansen, Soren Glud
- 359-371 Optimal (r, Q) inventory policies with Poisson demands and lost sales: discounted and undiscounted cases
by Johansen, Soren Glud & Thorstenson, Anders
- 373-385 The marking for bucking under uncertainty in automatic harvesting of forests
by Liski, Erkki P. & Nummi, Tapio
- 387-399 Optimization of cyclic manufacturing systems with stochastic manufacturing times using event graphs
by Sauer, Nathalie
- 401-411 A coherent methodology for productivity analysis employing integrated partial efficiency
by Agrell, Per J. & Wikner, Joakim
- 413-421 Input congestion in loan operations
by Hartman, Thomas E. & Storbeck, James E.
- 423-431 Performance measurement system design: Should process based approaches be adopted?
by Neely, Andy & Mills, John & Platts, Ken & Gregory, Mike & Richards, Huw
- 433-439 Choice of metric in the measurement of relative productive efficiency
by Ritchie, P. C. & Rowcroft, J. E.
- 441-457 Product costing in ten Swedish manufacturing companies
by Alnestig, Peter & Segerstedt, Anders
- 459-467 Life-cycle cost analysis of the labor factor
by Dahlen, Per & Bolmsjo, Gunnar S
- 469-476 Cost of free capacity
by Paranko, Jari
- 477-488 An analysis of research on international operations networks
by Boone, Tonya & Johnson, Susan Paul & Sisk, Maia & Whybark, D. Clay
- 489-496 Services provided by manufacturing The Hungarian case
by Chikan, Attila & Demeter, Krisztina
- 497-509 American health care reform: An international perspective
by Roberta Minifie, J. & West, V. L.
- 511-520 An analytical approach to process planning with rework option
by Abdel-Malek, Layek & Asadathorn, Nutthapol
- 521-533 Tool sharing in parallel part production
by Gaalman, G. J. C. & Nawijn, W. M.
- 535-548 Workload control concepts in job shops A critical assessment
by Land, Martin & Gaalman, Gerard
- 549-561 Strategic FMS design under uncertainty: A fuzzy set theory based model
by Perrone, Giovanni & La Diega, Sergio Noto
- 563-573 Guidelines for tool store dimensioning in flexible manufacturing using an analytical technique
by Zavanella, Lucio
- 575-585 What and how about quality function deployment (QFD)
by Govers, C. P. M.
- 587-593 Inspection and correction policies in setting economic product tolerance
by Irianto, Dradjad
- 595-603 Storage location assignment: Using the product structure to reduce order picking times
by Brynzer, H. & Johansson, M. I.
- 605-620 A decision support system for strategic issues management of logistics
by Korpela, Jukka & Tuominen, Markku
- 621-630 Computer-aided packing shop scheduling in a manufacturing plant
by Lagodimos, A. G. & Charalambopoulos, A. & Kavgalaki, A.
August 1996, Volume 45, Issue 1-3
- 1-1 Preface
by Attila Chikan
- 1-7 The volume and structure of inventories
by Chikan, Attila
- 9-19 Inventories cycle in an augmented RBC model
by Collard, Fabrice & Jacques, Jean-Francois
- 21-27 Temporal aggregation and estimation of inventory functions
by Ghali, Moheb
- 29-36 Conditional volatility and the production smoothing hypothesis of inventory investment
by Ginama, Isamu
- 37-46 Has inventory management in the US become more efficient and flexible? A macroeconomic perspective
by Hirsch, Albert A.
- 47-54 Inventory investment in Greek manufacturing industry: Effects from participation in the European market
by Louri, Helen
- 55-64 Macroeconomic implications of S,s versus accelerator finished goods inventory strategies
by Lovell, Michael C.
- 65-75 Financing constraints and reordering rules
by Milne, Alistair
- 77-81 Does the time shape of inventory data hold clues on inventory behaviour
by Reinhardt, Paul & Beyer, Dirk
- 83-90 Heuristic production triggering mechanisms under discrete unequal inventory withdrawals
by Banerjee, Avijit & Burton, Jonathan & Banerjee, Snehamay
- 91-99 Inventory and enterprise integration
by Bonney, M. C. & Head, M. A. & Tien, C. C. & Huang, N. & Barson, R. J.
- 101-109 A visually interactive expert system for a distribution center environment
by Carlson, John G. & Yao, Andrew C.
- 111-119 A conceptual framework for managing congestion in manufacturing
by Gunasekaran, A. & Martikainen, T. & Virtanen, I. & Yli-Olli, P.
- 121-130 Systems design of a two-echelon steel industry supply chain
by Hafeez, K. & Griffiths, M. & Griffiths, J. & Naim, M. M.
- 131-137 A framework for cost-service analysis in differentiation of logistics services
by Pirttila, Timo & Huiskonen, Janne
- 139-146 A comparison of fixed and adaptive type controls for multi-product processing
by Kelle, Peter & Peak, David
- 147-157 Inventories and customer service in Polish manufacturing companies
by Kisperska-Moron, Danuta
- 159-168 Inventory forecasting with a multiple criteria decision tool
by Korpela, Jukka & Tuominen, Markku
- 169-180 A decision aid in warehouse site selection
by Korpela, Jukka & Tuominen, Markku
- 181-186 Information systems design requirements for inventory management: A conceptual approach
by Manthou, Vassiliki & Notopoulos, Panagiotis & Vlachopoulou, Maro
- 187-193 The implementation and use of material requirements planning system in Northern Greece: A case study
by Manthou, Vassiliki & Vlachopoulou, Maro & Theodorou, Petros
- 195-202 Generic organizational choices for logistics in decentralized organizations Implications for inventory management
by Pirttila, Timo & Niemi, Petri
- 203-214 The new management paradigm: An extension through the IFAM perspective
by Nyerges, Richard T.
- 215-222 Import related inventory management in Indian economy
by Prasad, K. N. & A.M. Swaminathan, (Miss) & Parkar, R. G.
- 223-230 A step-wise method for product range management and production control decisions: A case study at a board industry company
by Pirttila, Timo & Sandstrom, Robert
- 231-237 Macroeconomic analyses of inventories: learning from practice
by Sprague, Linda G. & Wacker, John G.
- 239-249 Reducing inventories in a multi-echelon manufacturing firm A case study
by Stenger, Alan J.
- 251-260 Restructuring the bill of material for productivity: A strategic evaluation of product configuration
by Stonebraker, Peter W.
- 261-270 Grain stocking and storing in Benue State: An appraisal of the Federal Government of Nigeria's food grain storage policy
by Chinedu Umeh, J. & Agunwamba, C. C. & Agada, O. A. D.
- 271-278 Positioning inventory in distribution systems
by Whybark, D. Clay & Yang, Shitao
- 279-292 An MCDM framework for dynamic systems
by Agrell, Per J. & Wikner, Joakim
- 293-302 Tracking signals in inventory control systems A simulation study
by Alstrom, Poul & Madsen, Per
- 303-310 Comparison of echelon stock and installation stock policies for two-level inventory systems
by Axsater, Sven & Juntti, Lars
- 311-320 The undershoot of the reorder point: Tests of an approximation
by Baganha, Manuel P. & Pyke, David F. & Ferrer, Geraldo
- 321-327 Investment policy for multiple product setup reduction under budgetary and capacity constraints
by Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae
- 329-336 Stochastic considerations of Grubbstrom--Molinder model of MRP, input-output and multi-echelon inventory systems
by Bogataj, Ludvik & Horvat, Liljana
- 337-342 Inventories in spatial models
by Bogataj, Marija
- 343-352 Variance laws for inventory management
by Boylan, I. E. & Johnston, F. R.
- 353-359 Stability problems in inventory theory
by Bulinskaya, E. V.
- 361-368 Inventory model with two stocks
by Bylka, S. & Komar, J.
- 369-379 Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy
by Diks, E. B. & de Kok, A. G.
- 381-388 Continuous review inventory control when capacity is variable
by Wang, Yunzeng & Gerchak, Yigal
- 389-395 Some comments on normal approximation for stochastic demand processes
by Girlich, Hans-Joachim
- 397-406 Inventory trigger control policies developed in terms of control theory
by Grubbstrom, Robert W. & Wikner, Joakim
- 407-419 Stochastic properties of a production--inventory process with planned production using transform methodology
by Grubbstrom, Robert W.
- 421-427 Batching policies for a product life cycle
by Hill, Roger M.
- 429-433 On queueing models for some multi-location problems
by Kochel, Peter
- 435-441 Fuzzy models for the newsboy problem
by Petrovic, Dobrila & Petrovic, Radivoj & Vujosevic, Mirko
- 443-447 The extended EOQ repair and waste disposal model
by Richter, Knut
- 449-461 A capacity-constrained multi-level inventory and production control problem
by Segerstedt, Anders
- 463-472 Some insights regarding selecting sets of scenarios in combinatorial stochastic problems
by Jonsson, Henrik & Silver, Edward A.
- 473-478 Optimal solution of a total time distribution problem
by Tsouros, C. & Satratzemi, M.
- 479-487 A dynamic game model for distribution problems with non-stochastic uncertainty
by Blanchini, Franco & Rinaldi, Franca & Ukovich, Walter
- 489-498 Product remanufacturing and disposal: A numerical comparison of alternative control strategies
by van der Laan, Erwin & Dekker, Rommert & Salomon, Marc
- 499-504 EOQ formula when inventory cost is fuzzy
by Vujosevic, Mirko & Petrovic, Dobrila & Petrovic, Radivoj
July 1996, Volume 44, Issue 3
- 177-187 Modelling resource supply and demand: Expanding the utility of ABC
by Salafatinos, Chris
- 189-199 The role of logistics in concurrent engineering
by Dowlatshahi, S.
- 201-206 A comment on Standish et al.: The problem with CALS: Barriers to the development of product data exchange and the US continuous acquisition and life-cycle support programme
by Spinardi, Graham & Graham, Ian & Williams, Robin
- 207-224 The payback method of investment appraisal: A review and synthesis
by Lefley, Frank
- 225-237 Efficient heuristic and optimal approaches for n/2/F/[sigma]Ci scheduling problems
by Wang, Chengen & Chu, Chengbin & Proth, Jean-Marie
- 239-248 Inventory models for fast moving spare parts subject to "sudden death" obsolescence
by Cobbaert, Koen & Van Oudheusden, Dirk
- 249-253 Scheduling to minimize the coefficient of variation
by De, Prabuddha & Ghosh, Jay B. & Wells, Charles E.
- 255-265 Discounted costs, obsolescence and planned stockouts with the EOQ formula
by van Delft, Ch. & Vial, J. P.
- 267-275 A two-item newsboy problem with substitutability
by Khouja, Moutaz & Mehrez, Abraham & Rabinowitz, Gad
June 1996, Volume 44, Issue 1-2