IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v46-47y1996i1p261-276.html
   My bibliography  Save this article

Stochastic lot-sizing: Solution and heuristic methods

Author

Listed:
  • Dellaert, N. P.
  • Melo, M. T.

Abstract

No abstract is available for this item.

Suggested Citation

  • Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
  • Handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:261-276
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00112-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Abraham Seidmann & Milton L. Smith, 1981. "Due Date Assignment for Production Systems," Management Science, INFORMS, vol. 27(5), pages 571-581, May.
    2. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    3. Willard I. Zangwill, 1966. "A Deterministic Multi-Period Production Scheduling Model with Backlogging," Management Science, INFORMS, vol. 13(1), pages 105-119, September.
    4. Mattsson, Lars & Olhager, Jan & Ovrin, Peter & Rapp, Birger, 1989. "Computerization of manufacturing planning and control systems: Minicomputer-based systems 1980-1987," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 71-78, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.
    2. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
    2. Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
    3. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
    4. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    5. Minjiao Zhang & Simge Küçükyavuz & Saumya Goel, 2014. "A Branch-and-Cut Method for Dynamic Decision Making Under Joint Chance Constraints," Management Science, INFORMS, vol. 60(5), pages 1317-1333, May.
    6. Liu, Tieming, 2008. "Economic lot sizing problem with inventory bounds," European Journal of Operational Research, Elsevier, vol. 185(1), pages 204-215, February.
    7. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    8. van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
    9. Sana, S. & Goyal, S. K. & Chaudhuri, K. S., 2004. "A production-inventory model for a deteriorating item with trended demand and shortages," European Journal of Operational Research, Elsevier, vol. 157(2), pages 357-371, September.
    10. Hark‐Chin Hwang & Wilco van den Heuvel, 2012. "Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(3‐4), pages 244-253, April.
    11. repec:dgr:rugsom:02a72 is not listed on IDEAS
    12. Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
    13. Azaron, Amir & Fynes, Brian & Modarres, Mohammad, 2011. "Due date assignment in repetitive projects," International Journal of Production Economics, Elsevier, vol. 129(1), pages 79-85, January.
    14. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    15. Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
    16. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
    17. Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
    18. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    19. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    20. Luis A. Guardiola & Ana Meca & Justo Puerto, 2021. "Unitary Owen Points in Cooperative Lot-Sizing Models with Backlogging," Mathematics, MDPI, vol. 9(8), pages 1-19, April.
    21. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:46-47:y:1996:i:1:p:261-276. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.