IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v48y1997i1p63-72.html
   My bibliography  Save this article

Batching to minimize total production time for two part types

Author

Listed:
  • Ching, Chung Yaw
  • Liao, Ching-Jong
  • Wu, Chutao John

Abstract

No abstract is available for this item.

Suggested Citation

  • Ching, Chung Yaw & Liao, Ching-Jong & Wu, Chutao John, 1997. "Batching to minimize total production time for two part types," International Journal of Production Economics, Elsevier, vol. 48(1), pages 63-72, January.
  • Handle: RePEc:eee:proeco:v:48:y:1997:i:1:p:63-72
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(96)00063-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Rana, S. P. & Singh, N., 1994. "Group scheduling jobs on a single machine: A multi-objective approach with preemptive priority structure," European Journal of Operational Research, Elsevier, vol. 79(1), pages 38-50, November.
    2. Gregory Dobson & Uday S. Karmarkar & Jeffrey L. Rummel, 1987. "Batching to Minimize Flow Times on One Machine," Management Science, INFORMS, vol. 33(6), pages 784-799, June.
    3. Gregory Dobson & Uday S. Karmarkar & Jeffrey L. Rummel, 1989. "Batching to Minimize Flow Times on Parallel Heterogeneous Machines," Management Science, INFORMS, vol. 35(5), pages 607-613, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Edwin Cheng, T. C. & Kovalyov, Mikhail Y., 1998. "An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note," International Journal of Production Economics, Elsevier, vol. 55(1), pages 53-56, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gregory H. Graves & Chung‐Yee Lee, 1999. "Scheduling maintenance and semiresumable jobs on a single machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 845-863, October.
    2. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
    3. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    4. Shahvari, Omid & Logendran, Rasaratnam, 2016. "Hybrid flow shop batching and scheduling with a bi-criteria objective," International Journal of Production Economics, Elsevier, vol. 179(C), pages 239-258.
    5. Daniel Adelman & George L. Nemhauser & Mario Padron & Robert Stubbs & Ram Pandit, 1999. "Allocating Fibers in Cable Manufacturing," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 21-35.
    6. Bongjin Gim & Min-Hong Han, 1997. "Economic scheduling of products with N components on a single machine," European Journal of Operational Research, Elsevier, vol. 96(3), pages 570-577, February.
    7. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
    8. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
    9. Mor, Baruch & Mosheiov, Gur, 2014. "Batch scheduling with a rate-modifying maintenance activity to minimize total flowtime," International Journal of Production Economics, Elsevier, vol. 153(C), pages 238-242.
    10. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    11. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    12. Ying Chen & Yongxi Cheng & Guiqing Zhang, 2022. "Single machine lot scheduling with non-uniform lot capacities and processing times," Journal of Combinatorial Optimization, Springer, vol. 43(5), pages 1359-1367, July.
    13. Mosheiov, Gur & Oron, Daniel, 2008. "A single machine batch scheduling problem with bounded batch size," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1069-1079, June.
    14. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    15. Paul Schikora & Andrew Manikas & Michael Godfrey, 2015. "Determining Optimal Flow-Time Schedules For The Multiple-Product Batch-Flow Problem," International Journal of Management and Marketing Research, The Institute for Business and Finance Research, vol. 8(2), pages 19-35.
    16. Lin, B. M. T. & Jeng, A. A. K., 2004. "Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 91(2), pages 121-134, September.
    17. Liaee, Mohammad Mehdi & Emmons, Hamilton, 1997. "Scheduling families of jobs with setup times," International Journal of Production Economics, Elsevier, vol. 51(3), pages 165-176, September.
    18. Lin, Bertrand M. T., 2002. "Fabrication scheduling on a single machine with due date constraints," European Journal of Operational Research, Elsevier, vol. 136(1), pages 95-105, January.
    19. Chung-Lun Li & Chung-Yee Lee, 1997. "Scheduling with agreeable release times and due dates on a batch processing machine," European Journal of Operational Research, Elsevier, vol. 96(3), pages 564-569, February.
    20. Xinxin Hu & James D Blocher & Hans Sebastian Heese & Feng Zhou, 2016. "Scheduling products with subassemblies and changeover time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1025-1033, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:48:y:1997:i:1:p:63-72. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.