IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v33y1987i3p409-418.html
   My bibliography  Save this item

Lot Sizes, Lead Times and In-Process Inventories

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Awi Federgruen & Ziv Katalan, 1999. "The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System," Management Science, INFORMS, vol. 45(7), pages 980-994, July.
  2. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
  3. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
  4. repec:dgr:rugsom:95a23 is not listed on IDEAS
  5. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
  6. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
  7. Kate, Hans A. ten, 1995. "Tightness of lead times," Research Report 95A23, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  8. Shambu, Girish & Suresh, Nallan C., 2000. "Performance of hybrid cellular manufacturing systems: A computer simulation investigation," European Journal of Operational Research, Elsevier, vol. 120(2), pages 436-458, January.
  9. Shah, Purvi, 2020. "Managing customer reactions to brand deletion in B2B and B2C contexts," Journal of Retailing and Consumer Services, Elsevier, vol. 57(C).
  10. Bo Li & Antonio Arreola‐Risa, 2022. "Minimizing conditional value‐at‐risk under a modified basestock policy," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1822-1838, April.
  11. Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
  12. Bertrand, J. W. M. & van Ooijen, H. P. G., 1996. "Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems," International Journal of Production Economics, Elsevier, vol. 46(1), pages 1-12, December.
  13. Vandaele, Nico & Van Nieuwenhuyse, Inneke & Cupers, Sascha, 2003. "Optimal grouping for a nuclear magnetic resonance scanner by means of an open queueing model," European Journal of Operational Research, Elsevier, vol. 151(1), pages 181-192, November.
  14. Matsuura, Haruki & Tsubone, Hitoshi & Kanezashi, Masakazu, 1996. "Setting planned lead times for multi-operation jobs," European Journal of Operational Research, Elsevier, vol. 88(2), pages 287-303, January.
  15. Escudero, L. F. & Galindo, E. & Garcia, G. & Gomez, E. & Sabau, V., 1999. "Schumann, a modeling framework for supply chain management under uncertainty," European Journal of Operational Research, Elsevier, vol. 119(1), pages 14-34, November.
  16. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
  17. Ocampo y Vilas, Carlos & Vandaele, Nico, 2002. "A cost and operations based product heterogeneity index," International Journal of Production Economics, Elsevier, vol. 79(1), pages 45-55, September.
  18. I. Robert Chiang & Jhih‐Hua Jhang‐Li, 2020. "Competition through Exclusivity in Digital Content Distribution," Production and Operations Management, Production and Operations Management Society, vol. 29(5), pages 1270-1286, May.
  19. Chih-Yang Tsai, 2017. "The impact of cost structure on supply chain cash flow risk," International Journal of Production Research, Taylor & Francis Journals, vol. 55(22), pages 6624-6637, November.
  20. Hwarng, H. Brian & Xie, Na, 2008. "Understanding supply chain dynamics: A chaos perspective," European Journal of Operational Research, Elsevier, vol. 184(3), pages 1163-1178, February.
  21. Choi, Sangjin & Enns, S. T., 2004. "Multi-product capacity-constrained lot sizing with economic objectives," International Journal of Production Economics, Elsevier, vol. 91(1), pages 47-62, September.
  22. I. Van Nieuwenhuyse, 2008. "Lot sizing in stochastic flowshops. Striking the balance between capacity and flow," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(2), pages 147-160.
  23. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
  24. Yao Zhao & Benjamin Melamed, 2006. "IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders," Methodology and Computing in Applied Probability, Springer, vol. 8(2), pages 191-222, June.
  25. Debabrata Dey & Atanu Lahiri & Guoying Zhang, 2015. "Optimal Policies for Security Patch Management," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 462-477, August.
  26. Piramuthu, Selwyn, 2005. "Knowledge-based framework for automated dynamic supply chain configuration," European Journal of Operational Research, Elsevier, vol. 165(1), pages 219-230, August.
  27. Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
  28. Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
  29. Sohner, Volkmar & Schneeweiss, Christoph, 1995. "Hierarchically integrated lot size optimization," European Journal of Operational Research, Elsevier, vol. 86(1), pages 73-90, October.
  30. Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
  31. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  32. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
  33. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
  34. Bo Li & Antonio Arreola‐Risa, 2021. "On minimizing downside risk in make‐to‐stock, risk‐averse firms," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(2), pages 199-213, March.
  35. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  36. Panda, D. & Kar, S. & Maity, K. & Maiti, M., 2008. "A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints," European Journal of Operational Research, Elsevier, vol. 188(1), pages 121-139, July.
  37. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
  38. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
  39. Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
  40. Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
  41. Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
  42. McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
  43. Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
  44. Szwejczewski, Marek & Mapes, John & New, Colin, 1997. "Delivery and trade-offs," International Journal of Production Economics, Elsevier, vol. 53(3), pages 323-330, December.
  45. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
  46. repec:dgr:rugsom:02a42 is not listed on IDEAS
  47. Weng, Z. Kevin, 1996. "Manufacturing lead times, system utilization rates and lead-time-related demand," European Journal of Operational Research, Elsevier, vol. 89(2), pages 259-268, March.
  48. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
  49. Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
  50. Sen Lin & Bo Li & Antonio Arreola-Risa & Yiwei Huang, 2023. "Optimizing a single-product production-inventory system under constant absolute risk aversion," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(3), pages 510-537, October.
  51. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
  52. Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
  53. Van Nieuwenhuyse, Inneke & Vandaele, Nico, 2006. "The impact of delivery lot splitting on delivery reliability in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 104(2), pages 694-708, December.
  54. De Toni, Alberto & Meneghetti, Antonella, 2000. "The production planning process for a network of firms in the textile-apparel industry," International Journal of Production Economics, Elsevier, vol. 65(1), pages 17-32, April.
  55. Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
  56. Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
  57. Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
  58. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
  59. Kim, Ilhyung, 1998. "Managing variances in manufacturing system design," European Journal of Operational Research, Elsevier, vol. 109(3), pages 571-586, September.
  60. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
  61. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
  62. Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
  63. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
  64. Yajaira Cardona-Valdés & Samuel Nucamendi-Guillén & Rodrigo E. Peimbert-García & Gustavo Macedo-Barragán & Eduardo Díaz-Medina, 2020. "A New Formulation for the Capacitated Lot Sizing Problem with Batch Ordering Allowing Shortages," Mathematics, MDPI, vol. 8(6), pages 1-16, June.
  65. Van Nieuwenhuyse, Inneke & Vandaele, Nico, 2004. "Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations," International Journal of Production Economics, Elsevier, vol. 92(3), pages 221-239, December.
  66. Ahn, Seongje & Rhim, Hosun & Hun Seog, S., 2008. "Response time and vendor-assembler relationship in a supply chain," European Journal of Operational Research, Elsevier, vol. 184(2), pages 652-666, January.
  67. Wagner A. Kamakura & Bruce S. Kossar & Michel Wedel, 2004. "Identifying Innovators for the Cross-Selling of New Products," Management Science, INFORMS, vol. 50(8), pages 1120-1133, August.
  68. Süral, Haldun & Denizel, Meltem & Van Wassenhove, Luk N., 2009. "Lagrangean relaxation based heuristics for lot sizing with setup times," European Journal of Operational Research, Elsevier, vol. 194(1), pages 51-63, April.
  69. S. Creemers & M. Lambrecht & N. Vandaele, 2007. "Queueing Models in Healthcare," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(3), pages 471-498.
  70. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
  71. Gregory Stock & Noel Greis & William Fischer, 2018. "Organisational Slack And New Product Time To Market Performance," International Journal of Innovation Management (ijim), World Scientific Publishing Co. Pte. Ltd., vol. 22(04), pages 1-34, May.
  72. Spitter, J.M. & de Kok, A.G. & Dellaert, N.P., 2005. "Timing production in LP models in a rolling schedule," International Journal of Production Economics, Elsevier, vol. 93(1), pages 319-329, January.
  73. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
  74. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
  75. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
  76. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
  77. Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
  78. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.