IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v54y1998i1p1-28.html
   My bibliography  Save this article

Waiting line model applications in manufacturing

Author

Listed:
  • Subba Rao, S.
  • Gunasekaran, A.
  • Goyal, S. K.
  • Martikainen, T.

Abstract

No abstract is available for this item.

Suggested Citation

  • Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
  • Handle: RePEc:eee:proeco:v:54:y:1998:i:1:p:1-28
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00129-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Campbell, Gerard M., 1991. "Cyclical queueing systems," European Journal of Operational Research, Elsevier, vol. 51(2), pages 155-167, March.
    2. M. E. Paté-Cornell & H. L. Lee & G. Tagaras, 1987. "Warnings of Malfunction: The Decision to Inspect and Maintain Production Processes on Schedule or on Demand," Management Science, INFORMS, vol. 33(10), pages 1277-1290, October.
    3. Dellaert, Nico P., 1989. "Multi-item production control for production to order," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 167-173, August.
    4. David D. Yao & J. A. Buzacott, 1987. "Modeling a Class of Flexible Manufacturing Systems with Reversible Routing," Operations Research, INFORMS, vol. 35(1), pages 87-93, February.
    5. E. G. Coffman, Jr. & E. N. Gilbert, 1992. "Service by a Queue and a Cart," Management Science, INFORMS, vol. 38(6), pages 867-883, June.
    6. Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P., 1993. "Determining economic inventory policies in a multi-stage just-in-time production system," International Journal of Production Economics, Elsevier, vol. 30(1), pages 531-542, July.
    7. Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
    8. Ward Whitt, 1985. "The Best Order for Queues in Series," Management Science, INFORMS, vol. 31(4), pages 475-487, April.
    9. David D. Yao & S. C. Kim, 1987. "Reducing the Congestion in a Class of Job Shops," Management Science, INFORMS, vol. 33(9), pages 1165-1172, September.
    10. Gabriel R. Bitran & Devanath Tirupati, 1988. "Multiproduct Queueing Networks with Deterministic Routing: Decomposition Approach and the Notion of Interference," Management Science, INFORMS, vol. 34(1), pages 75-100, January.
    11. S. Saboo & L. Wang & W. E. Wilhelm, 1989. "Recursion Models for Describing and Managing the Transient Flow of Materials in Generalized Flowlines," Management Science, INFORMS, vol. 35(6), pages 722-742, June.
    12. Rao, S. Subba, 1992. "The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 221-227, February.
    13. Jean-Luc Deleersnyder & Thom J. Hodgson & Henri Muller-Malek & Peter J. O'Grady, 1989. "Kanban Controlled Pull Systems: An Analytic Approach," Management Science, INFORMS, vol. 35(9), pages 1079-1091, September.
    14. Hong Chen & J. Michael Harrison & Avi Mandelbaum & Ann Van Ackere & Lawrence M. Wein, 1988. "Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication," Operations Research, INFORMS, vol. 36(2), pages 202-215, April.
    15. Katsuhisa Ohno & Kuniyoshi Ichiki, 1987. "Computing Optimal Policies for Controlled Tandem Queueing Systems," Operations Research, INFORMS, vol. 35(1), pages 121-126, February.
    16. Paul J. Schweitzer & Abraham Seidmann, 1991. "Optimizing Processing Rates for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 37(4), pages 454-466, April.
    17. James R. Jackson, 1957. "Networks of Waiting Lines," Operations Research, INFORMS, vol. 5(4), pages 518-521, August.
    18. Coffman, E. G. & Gelenbe, E. & Gilbert, E. N., 1988. "Analysis of a conveyor queue in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 35(3), pages 382-392, June.
    19. Mohamed A. Ahmed & Donald Gross & Douglas R. Miller, 1992. "Control Variate Models for Estimating Transient Performance Measures in Repairable Item Systems," Management Science, INFORMS, vol. 38(3), pages 388-399, March.
    20. Lawrence M. Wein & Philippe B. Chevalier, 1992. "A Broader View of the Job-Shop Scheduling Problem," Management Science, INFORMS, vol. 38(7), pages 1018-1033, July.
    21. J. Michael Harrison & Lawrence M. Wein, 1990. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Closed Network," Operations Research, INFORMS, vol. 38(6), pages 1052-1064, December.
    22. Alexandre Brandwajn & Yung-Li Lily Jow, 1988. "An Approximation Method for Tandem Queues with Blocking," Operations Research, INFORMS, vol. 36(1), pages 73-83, February.
    23. Hanan Luss, 1983. "An Inspection Policy Model for Production Facilities," Management Science, INFORMS, vol. 29(9), pages 1102-1109, September.
    24. Stecke, Kathryn E. & Kim, Ilyong, 1989. "Performance evaluation for systems of pooled machines of unequal sizes: Unbalancing versus balancing," European Journal of Operational Research, Elsevier, vol. 42(1), pages 22-38, September.
    25. J. MacGregor Smith & Sophia Daskalaki, 1988. "Buffer Space Allocation in Automated Assembly Lines," Operations Research, INFORMS, vol. 36(2), pages 343-358, April.
    26. Yao, David D. & Buzacott, J. A., 1986. "The exponentialization approach to flexible manufacturing system models with general processing times," European Journal of Operational Research, Elsevier, vol. 24(3), pages 410-416, March.
    27. Albright, S. Christian & Soni, A., 1988. "Approximate steady-state distribution for a large repairable item inventory system," European Journal of Operational Research, Elsevier, vol. 34(3), pages 351-361, March.
    28. J. George Shanthikumar & David D. Yao, 1992. "Multiclass Queueing Systems: Polymatroidal Structure and Optimal Scheduling Control," Operations Research, INFORMS, vol. 40(3-supplem), pages 293-299, June.
    29. Buzacott, J. A., 1989. "Queueing models of Kanban and MRP controlled production systems," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 3-20, August.
    30. Genji Yamazaki & Hirotaka Sakasegawa & J. George Shanthikumar, 1992. "On Optimal Arrangement of Stations in a Tandem Queueing System with Blocking," Management Science, INFORMS, vol. 38(1), pages 137-153, January.
    31. Betsy S. Greenberg & Ronald W. Wolff, 1988. "Optimal Order of Servers for Tandem Queues in Light Traffic," Management Science, INFORMS, vol. 34(4), pages 500-508, April.
    32. Yu-Sheng Zheng & Paul Zipkin, 1990. "A Queueing Model to Analyze the Value of Centralized Inventory Information," Operations Research, INFORMS, vol. 38(2), pages 296-307, April.
    33. Robert C. Leachman & André Gascon, 1988. "A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands," Management Science, INFORMS, vol. 34(3), pages 377-390, March.
    34. Richard Conway & William Maxwell & John O. McClain & L. Joseph Thomas, 1988. "The Role of Work-in-Process Inventory in Serial Production Lines," Operations Research, INFORMS, vol. 36(2), pages 229-241, April.
    35. Yao, David D. W. & Buzacott, J. A., 1985. "Queueing models for a flexible machining station Part I: The diffusion approximation," European Journal of Operational Research, Elsevier, vol. 19(2), pages 233-240, February.
    36. Debashish Sarkar & Willard I. Zangwill, 1991. "Variance Effects in Cyclic Production Systems," Management Science, INFORMS, vol. 37(4), pages 444-453, April.
    37. Yves Dallery & Kathryn E. Stecke, 1990. "On the Optimal Allocation of Servers and Workloads in Closed Queueing Networks," Operations Research, INFORMS, vol. 38(4), pages 694-703, August.
    38. Teghem, J., 1986. "Control of the service process in a queueing system," European Journal of Operational Research, Elsevier, vol. 23(2), pages 141-158, February.
    39. Stephen C. Graves, 1986. "A Tactical Planning Model for a Job Shop," Operations Research, INFORMS, vol. 34(4), pages 522-533, August.
    40. Rajan Suri & Gregory W. Diehl, 1986. "A Variable Buffer-Size Model and Its Use in Analyzing Closed Queueing Networks with Blocking," Management Science, INFORMS, vol. 32(2), pages 206-224, February.
    41. Shanthikumar, J. George & Stecke, Kathryn E., 1986. "Reducing work-in-process inventory in certain classes of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 26(2), pages 266-271, August.
    42. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    43. J. A. Buzacott & J. G. Shanthikumar, 1985. "On Approximate Queueing Models of Dynamic Job Shops," Management Science, INFORMS, vol. 31(7), pages 870-887, July.
    44. J. George Shanthikumar & David D. Yao, 1987. "Optimal Server Allocation in a System of Multi-Server Stations," Management Science, INFORMS, vol. 33(9), pages 1173-1180, September.
    45. Awi Federgruen & Kut C. So, 1990. "Optimal Maintenance Policies for Single-Server Queueing Systems Subject to Breakdowns," Operations Research, INFORMS, vol. 38(2), pages 330-343, April.
    46. Ardavan Nozari & Ward Whitt, 1988. "Estimating Average Production Intervals Using Inventory Measurements: Little's Law for Partially Observable Processes," Operations Research, INFORMS, vol. 36(2), pages 308-323, April.
    47. Pourbabai, Behnam, 1987. "Performance modeling of a closed loop material handling system," European Journal of Operational Research, Elsevier, vol. 32(3), pages 340-352, December.
    48. Debasis Mitra & Isi Mitrani, 1990. "Analysis of a Kanban Discipline for Cell Coordination in Production Lines. I," Management Science, INFORMS, vol. 36(12), pages 1548-1566, December.
    49. Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.
    50. Stanley B. Gershwin, 1987. "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking," Operations Research, INFORMS, vol. 35(2), pages 291-305, April.
    51. Kiessler, Peter C. & Disney, Ralph L., 1988. "Further remarks on queueing network theory," European Journal of Operational Research, Elsevier, vol. 36(3), pages 285-296, September.
    52. Stecke, Kathryn E. & Morin, Thomas L., 1985. "The optimality of balancing workloads in certain types of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 20(1), pages 68-82, April.
    53. Joel M. Calabrese & Warren H. Hausman, 1991. "Simultaneous Determination of Lot Sizes and Routing Mix in Job Shops," Management Science, INFORMS, vol. 37(8), pages 1043-1057, August.
    54. J. G. Shanthikumar & C. C. Tien, 1983. "An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units," Management Science, INFORMS, vol. 29(9), pages 1069-1086, September.
    55. Morris A. Cohen & Hau L. Lee, 1988. "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Operations Research, INFORMS, vol. 36(2), pages 216-228, April.
    56. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    57. Vinod, B. & Sabbagh, M., 1986. "Optimal performance analysis of manufacturing systems subject to tool availability," European Journal of Operational Research, Elsevier, vol. 24(3), pages 398-409, March.
    58. Kathryn E. Stecke & James J. Solberg, 1985. "The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues," Operations Research, INFORMS, vol. 33(4), pages 882-910, August.
    59. Lawrence M. Wein & Jihong Ou, 1991. "The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling," Management Science, INFORMS, vol. 37(8), pages 1002-1014, August.
    60. Kahn, James A, 1987. "Inventories and the Volatility of Production," American Economic Review, American Economic Association, vol. 77(4), pages 667-679, September.
    61. Mark L. Spearman & Michael A. Zazanis, 1992. "Push and Pull Production Systems: Issues and Comparisons," Operations Research, INFORMS, vol. 40(3), pages 521-532, June.
    62. Yao, David D. W. & Buzacott, J. A., 1985. "Queueing models for a flexible machining station Part II: The method of Coxian phases," European Journal of Operational Research, Elsevier, vol. 19(2), pages 241-252, February.
    63. Sohner, Volkmar & Schneeweiss, Christoph, 1995. "Hierarchically integrated lot size optimization," European Journal of Operational Research, Elsevier, vol. 86(1), pages 73-90, October.
    64. Lawrence M. Wein, 1991. "Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue," Management Science, INFORMS, vol. 37(7), pages 834-850, July.
    65. Olhager, Jan & Rapp, Birger, 1985. "Balancing capacity and lot sizes," European Journal of Operational Research, Elsevier, vol. 19(3), pages 337-344, March.
    66. Christopher S. Tang, 1990. "The Impact of Uncertainty on a Production Line," Management Science, INFORMS, vol. 36(12), pages 1518-1531, December.
    67. Hyo-Seong Lee & Stephen M. Pollock, 1990. "Approximation Analysis of Open Acyclic Exponential Queueing Networks with Blocking," Operations Research, INFORMS, vol. 38(6), pages 1123-1134, December.
    68. Gabriel R. Bitran & D. Tirupati, 1989. "Approximations for Product Departures from a Single-Server Station with Batch Processing in Multi-Product Queues," Management Science, INFORMS, vol. 35(7), pages 851-878, July.
    69. Uday S. Karmarkar & Sham Kekre & Sunder Kekre & Susan Freeman, 1985. "Lot-Sizing and Lead-time Performance in a Manufacturing Cell," Interfaces, INFORMS, vol. 15(2), pages 1-9, April.
    70. Lawrence M. Wein, 1990. "Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs," Operations Research, INFORMS, vol. 38(6), pages 1065-1078, December.
    71. Hsu, Lie-Fern & Tapiero, Charles S., 1989. "Quality control of the M/G/1 queue," European Journal of Operational Research, Elsevier, vol. 42(1), pages 88-100, September.
    72. Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
    73. Mark L. Spearman, 1991. "An Analytic Congestion Model for Closed Production Systems with IFR Processing Times," Management Science, INFORMS, vol. 37(8), pages 1015-1029, August.
    74. Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
    2. Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
    3. Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
    4. Pourvaziri, Hani & Pierreval, Henri, 2017. "Dynamic facility layout problem based on open queuing network theory," European Journal of Operational Research, Elsevier, vol. 259(2), pages 538-553.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    2. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    3. Bitran, Gabriel R. & Morabito, Reinaldo., 1994. "Open queueing networks : optimization and performance evaluation models for discrete manufacturing systems," Working papers 3743-94., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    4. Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
    5. Noa Zychlinski & Avishai Mandelbaum & Petar Momčilović, 2018. "Time-varying tandem queues with blocking: modeling, analysis, and operational insights via fluid models with reflection," Queueing Systems: Theory and Applications, Springer, vol. 89(1), pages 15-47, June.
    6. Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
    7. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    8. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    9. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    10. Koltai, Tamas & Lozano, Sebastian, 1998. "Sensitivity calculation of the throughput of an FMS with respect to the routing mix using perturbation analysis," European Journal of Operational Research, Elsevier, vol. 105(3), pages 483-493, March.
    11. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    12. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
    13. Kirkavak, Nureddin & Dincer, Cemal, 1999. "The general behavior of pull production systems: The allocation problems," European Journal of Operational Research, Elsevier, vol. 119(2), pages 479-494, December.
    14. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
    15. Refael Hassin & Yair Y. Shaki & Uri Yovel, 2015. "Optimal service‐capacity allocation in a loss system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(2), pages 81-97, March.
    16. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
    17. Xiuli Chao & Liming Liu & Shaohui Zheng, 2003. "Resource Allocation in Multisite Service Systems with Intersite Customer Flows," Management Science, INFORMS, vol. 49(12), pages 1739-1752, December.
    18. Morabito, Reinaldo & de Souza, Mauricio C. & Vazquez, Mariana, 2014. "Approximate decomposition methods for the analysis of multicommodity flow routing in generalized queuing networks," European Journal of Operational Research, Elsevier, vol. 232(3), pages 618-629.
    19. Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
    20. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:54:y:1998:i:1:p:1-28. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.