Author
Listed:
- Harry Groenevelt
(William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York 14627)
- Liliane Pintelon
(Katholieke Universiteit Leuven, Leuven, Belgium)
- Abraham Seidmann
(William E. Simon Graduate School of Business Administration, University of Rochester, Rochester, New York 14627)
Abstract
Economic lot sizing and batching models often assume reliable manufacturing facilities. In this research, we focus on the effects of machine breakdowns and corrective maintenance on the economic lot sizing decisions. Two production control policies are proposed for coping with these stochastic interferences. The first policy assumes that production of the interrupted lots is not resumed after a breakdown. Instead, the on-hand inventory is depleted before a new cycle is initiated. Under the second policy studied here, production is immediately resumed after a breakdown, if the current on-hand inventory is below a certain threshold level. It is shown that this control structure is optimal among all stationary policies. We show that under both policies the optimal lot sizes will always be bigger than the ones in a corresponding deterministic case, and that the optimal lot size increases with the failure rate. We also provide exact optimal and closed form approximate lot sizing formulas and derive tight bounds on the average cost per unit time for the approximations. In addition, we present various structural properties for these policies and operational insights relevant to such management decisions as machine replacement or maintenance schedules.
Suggested Citation
Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992.
"Production Lot Sizing with Machine Breakdowns,"
Management Science, INFORMS, vol. 38(1), pages 104-123, January.
Handle:
RePEc:inm:ormnsc:v:38:y:1992:i:1:p:104-123
DOI: 10.1287/mnsc.38.1.104
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:38:y:1992:i:1:p:104-123. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.