IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v101y1997i3p474-485.html
   My bibliography  Save this article

Lead time and response time in a pull production control system

Author

Listed:
  • Kim, Ilhyung
  • Tang, Christopher S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
  • Handle: RePEc:eee:ejores:v:101:y:1997:i:3:p:474-485
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(96)00174-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ralph D. Badinelli, 1992. "A Model for Continuous-Review Pull Policies in Serial Inventory Systems," Operations Research, INFORMS, vol. 40(1), pages 142-156, February.
    2. Gabriel R. Bitran & Li Chang, 1987. "A Mathematical Programming Approach to a Deterministic Kanban System," Management Science, INFORMS, vol. 33(4), pages 427-441, April.
    3. Debasis Mitra & Isi Mitrani, 1990. "Analysis of a Kanban Discipline for Cell Coordination in Production Lines. I," Management Science, INFORMS, vol. 36(12), pages 1548-1566, December.
    4. Sridhar R. Tayur, 1993. "Structural Properties and a Heuristic for Kanban-Controlled Serial Lines," Management Science, INFORMS, vol. 39(11), pages 1347-1368, November.
    5. Jean-Luc Deleersnyder & Thom J. Hodgson & Henri Muller-Malek & Peter J. O'Grady, 1989. "Kanban Controlled Pull Systems: An Analytic Approach," Management Science, INFORMS, vol. 35(9), pages 1079-1091, September.
    6. Hong Chen & J. Michael Harrison & Avi Mandelbaum & Ann Van Ackere & Lawrence M. Wein, 1988. "Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication," Operations Research, INFORMS, vol. 36(2), pages 202-215, April.
    7. Tayur, S.R., 1992. "Properties of Serial Kanban Systems," GSIA Working Papers 1992-06, Carnegie Mellon University, Tepper School of Business.
    8. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    9. Debasis Mitra & Isi Mitrani, 1991. "Analysis of a Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands," Operations Research, INFORMS, vol. 39(5), pages 807-823, October.
    10. Eric V. Denardo & Christopher S. Tang, 1992. "Linear Control of a Markov Production System," Operations Research, INFORMS, vol. 40(2), pages 259-278, April.
    11. Buzacott, J. A., 1989. "Queueing models of Kanban and MRP controlled production systems," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 3-20, August.
    12. Wang, Hunglin & Hsu-Pin (Ben) Wang, 1991. "Optimum number of kanbans between two adjacent workstations in a JIT system," International Journal of Production Economics, Elsevier, vol. 22(3), pages 179-188, December.
    13. Christopher S. Tang, 1990. "The Impact of Uncertainty on a Production Line," Management Science, INFORMS, vol. 36(12), pages 1518-1531, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    2. Sandeep Jain & N. Raghavan, 2009. "A queuing approach for inventory planning with batch ordering in multi-echelon supply chains," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 17(1), pages 95-110, March.
    3. Ahn, Seongje & Rhim, Hosun & Hun Seog, S., 2008. "Response time and vendor-assembler relationship in a supply chain," European Journal of Operational Research, Elsevier, vol. 184(2), pages 652-666, January.
    4. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    2. Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
    3. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
    4. Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
    5. Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
    6. Kojima, Mitsutoshi & Nakashima, Kenichi & Ohno, Katsuhisa, 2008. "Performance evaluation of SCM in JIT environment," International Journal of Production Economics, Elsevier, vol. 115(2), pages 439-443, October.
    7. Andijani, A. A., 1998. "A multi-criterion approach for Kanban allocations," Omega, Elsevier, vol. 26(4), pages 483-493, August.
    8. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    9. Iwase, Masaharu & Ohno, Katsuhisa, 2011. "The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities," European Journal of Operational Research, Elsevier, vol. 214(2), pages 216-222, October.
    10. Mascolo, Maria Di, 1996. "Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands," European Journal of Operational Research, Elsevier, vol. 89(1), pages 147-163, February.
    11. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    12. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    13. Cigdem Gurgur, 2013. "Optimal configuration of a decentralized, market-driven production/inventory system," Annals of Operations Research, Springer, vol. 209(1), pages 139-157, October.
    14. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    15. Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
    16. L. Gong & H. Matsuo, 1997. "Control Policy for a Manufacturing System with Random Yield and Rework," Journal of Optimization Theory and Applications, Springer, vol. 95(1), pages 149-175, October.
    17. Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
    18. Sridhar Tayur, 2017. "OM Forum—An Essay on Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(4), pages 526-533, October.
    19. Albino, Vito & Dassisti, Michele & O. Okogbaa, Geoffrey, 1995. "Approximation approach for the performance analysis of production lines under a kanban discipline," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 197-207, August.
    20. Venky Nagar & Madhav V. Rajan & Richard Saouma, 2009. "The Incentive Value of Inventory and Cross‐training in Modern Manufacturing," Journal of Accounting Research, Wiley Blackwell, vol. 47(4), pages 991-1025, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:101:y:1997:i:3:p:474-485. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.