IDEAS home Printed from https://ideas.repec.org/a/inm/orinte/v15y1985i2p1-9.html
   My bibliography  Save this article

Lot-Sizing and Lead-time Performance in a Manufacturing Cell

Author

Listed:
  • Uday S. Karmarkar

    (The Graduate School of Management, University of Rochester, Rochester, New York 14627)

  • Sham Kekre

    (Eastman Kodak Company, Rochester, New York 14650)

  • Sunder Kekre

    (The Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh, Pennsylvania 15213)

  • Susan Freeman

    (Eastman Kodak Company, Rochester, New York 14650)

Abstract

Many complex multi-item manufacturing shops have high levels of work-in-process because of queueing delays at machines and consequently long manufacturing lead times. These delays are directly related to lot sizes. Two alternative approaches applied to modeling a manufacturing cell---simulation and a novel analytical lot-sizing model (Q-LOTS)---provide very similar results and validate the analytical model.

Suggested Citation

  • Uday S. Karmarkar & Sham Kekre & Sunder Kekre & Susan Freeman, 1985. "Lot-Sizing and Lead-time Performance in a Manufacturing Cell," Interfaces, INFORMS, vol. 15(2), pages 1-9, April.
  • Handle: RePEc:inm:orinte:v:15:y:1985:i:2:p:1-9
    DOI: 10.1287/inte.15.2.1
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/inte.15.2.1
    Download Restriction: no

    File URL: https://libkey.io/10.1287/inte.15.2.1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
    2. Shambu, Girish & Suresh, Nallan C., 2000. "Performance of hybrid cellular manufacturing systems: A computer simulation investigation," European Journal of Operational Research, Elsevier, vol. 120(2), pages 436-458, January.
    3. McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
    4. G-C Lee & Y-D Kim & J-G Kim & S-H Choi, 2003. "A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1038-1049, October.
    5. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    6. Adacher, Ludovica & Cassandras, Christos G., 2014. "Lot size optimization in manufacturing systems: The surrogate method," International Journal of Production Economics, Elsevier, vol. 155(C), pages 418-426.
    7. De Toni, Alberto & Meneghetti, Antonella, 2000. "The production planning process for a network of firms in the textile-apparel industry," International Journal of Production Economics, Elsevier, vol. 65(1), pages 17-32, April.
    8. Radhakrishnan, Suresh & Balachandran, Kashi R., 2004. "Service capacity decision and incentive compatible cost allocation for reporting usage forecasts," European Journal of Operational Research, Elsevier, vol. 157(1), pages 180-195, August.
    9. Shafer, S. M. & Meredith, J. R. & Marsh, R. F., 1995. "A taxonomy for alternative equipment groupings in batch environments," Omega, Elsevier, vol. 23(4), pages 361-376, August.
    10. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
    11. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    12. Benjaafar, Saifallah, 1996. "Modeling and analysis of machine sharing in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 91(1), pages 56-73, May.
    13. Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    14. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    15. Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
    16. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    17. repec:dgr:rugsom:02a49 is not listed on IDEAS
    18. Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
    19. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:15:y:1985:i:2:p:1-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.