Time bucket size and lot-splitting approach

Author

Listed:
  • Riezebos, Jan

    (Groningen University)

Abstract

We address the problem of lot splitting for various time bucket lengths in MRP systems. Two approaches for lot splitting can be applied: either use the same (equal) or a variable number of subbatches. Equal subbatching strategies have logistical and computational advantages. Literature states that variable batching strategies are only marginal better. However, these results do not take into account the sensitivity for changes in time bucket length. Managers have reduced time bucket lengths in planning systems. We examine the sensitivity of lot splitting for these changes. Our study reveals that it is not cost-effective to disregard time bucket length when deciding on the number of subbatches. Using the same number of subbatches per time bucket for all products results in substantial cost-differences, where the magnitude is affected by the discontinuity of the total cost curve. For a given time bucket length, a cost difference with a variable number of subbatches per operation of only 2.1% can be obtained if an appropriate, equal number of subbatches for each product can be found. Other equal subbatching strategies show much larger cost differences on average, ranging from 4-11%. In order to obtain these results, a new variable subbatch heuristic has been designed.

Suggested Citation

  • Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  • Handle: RePEc:gro:rugsom:02a42
    as

    Download full text from publisher

    File URL: http://irs.ub.rug.nl/ppn/240804600
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Bogaschewsky, Ronald W. & Buscher, Udo D. & Lindner, Gerd, 2001. "Optimizing multi-stage production with constant lot size and varying number of unequal sized batches," Omega, Elsevier, vol. 29(2), pages 183-191, April.
    2. Lee J. Krajewski & Barry E. King & Larry P. Ritzman & Danny S. Wong, 1987. "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, INFORMS, vol. 33(1), pages 39-57, January.
    3. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    4. Enns, S. T., 2002. "MRP performance effects due to forecast bias and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 138(1), pages 87-102, April.
    5. Matsuura, Haruki & Tsubone, Hitoshi & Kanezashi, Masakazu, 1996. "Setting planned lead times for multi-operation jobs," European Journal of Operational Research, Elsevier, vol. 88(2), pages 287-303, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. repec:dgr:rugsom:02a42 is not listed on IDEAS
    2. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    3. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
    4. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    5. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    6. Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
    7. Shah, Purvi, 2020. "Managing customer reactions to brand deletion in B2B and B2C contexts," Journal of Retailing and Consumer Services, Elsevier, vol. 57(C).
    8. Debabrata Dey & Atanu Lahiri & Guoying Zhang, 2015. "Optimal Policies for Security Patch Management," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 462-477, August.
    9. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    10. Sohner, Volkmar & Schneeweiss, Christoph, 1995. "Hierarchically integrated lot size optimization," European Journal of Operational Research, Elsevier, vol. 86(1), pages 73-90, October.
    11. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    12. Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
    13. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
    14. Sen Lin & Bo Li & Antonio Arreola-Risa & Yiwei Huang, 2023. "Optimizing a single-product production-inventory system under constant absolute risk aversion," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(3), pages 510-537, October.
    15. Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Discussion Paper 1998-31, Tilburg University, Center for Economic Research.
    16. Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
    17. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    18. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    19. Van Nieuwenhuyse, Inneke & Vandaele, Nico, 2004. "Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations," International Journal of Production Economics, Elsevier, vol. 92(3), pages 221-239, December.
    20. Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
    21. Gregory Stock & Noel Greis & William Fischer, 2018. "Organisational Slack And New Product Time To Market Performance," International Journal of Innovation Management (ijim), World Scientific Publishing Co. Pte. Ltd., vol. 22(04), pages 1-34, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gro:rugsom:02a42. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Hanneke Tamling (email available below). General contact details of provider: https://edirc.repec.org/data/ferugnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.