IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v135y2001i1p128-141.html
   My bibliography  Save this article

Optimal investment in setup reduction in manufacturing systems with WIP inventories

Author

Listed:
  • Nye, T. J.
  • Jewkes, E. M.
  • Dilts, D. M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
  • Handle: RePEc:eee:ejores:v:135:y:2001:i:1:p:128-141
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(00)00308-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    2. Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
    3. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
    4. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
    5. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    6. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    7. Cheng, T. C. E., 1989. "An economic production quantity model with flexibility and reliability considerations," European Journal of Operational Research, Elsevier, vol. 39(2), pages 174-179, March.
    8. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
    9. Anne M. Spence & Evan L. Porteus, 1987. "Setup Reduction and Increased Effective Capacity," Management Science, INFORMS, vol. 33(10), pages 1291-1301, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. E J Comeaux & B R Sarker, 2005. "Joint optimization of process improvement investments for supplier–buyer cooperative commerce," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(11), pages 1310-1324, November.
    2. Hsu, P.H. & Wee, H.M. & Teng, H.M., 2010. "Preservation technology investment for deteriorating inventory," International Journal of Production Economics, Elsevier, vol. 124(2), pages 388-394, April.
    3. Biswajit Sarkar & Sharmila Saren & Mitali Sarkar & Yong Won Seo, 2016. "A Stackelberg Game Approach in an Integrated Inventory Model with Carbon-Emission and Setup Cost Reduction," Sustainability, MDPI, vol. 8(12), pages 1-23, December.
    4. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
    5. Umakanta Mishra & Jei-Zheng Wu & Anthony Shun Fung Chiu, 2019. "Effects of Carbon-Emission and Setup Cost Reduction in a Sustainable Electrical Energy Supply Chain Inventory System," Energies, MDPI, vol. 12(7), pages 1-18, March.
    6. Mehran Ullah & Biswajit Sarkar & Iqra Asghar, 2019. "Effects of Preservation Technology Investment on Waste Generation in a Two-Echelon Supply Chain Model," Mathematics, MDPI, vol. 7(2), pages 1-20, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
    2. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
    3. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    4. Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
    5. Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
    6. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
    7. Giri, B. C. & Moon, I., 2004. "Note on an economic lot scheduling problem under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 91(3), pages 229-234, October.
    8. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
    9. Matsuyama, Keisuke, 1995. "Inventory policy with time-dependent setup cost," International Journal of Production Economics, Elsevier, vol. 42(2), pages 149-160, December.
    10. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
    11. Leung, Kit-Nam Francis, 2007. "A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations"," European Journal of Operational Research, Elsevier, vol. 176(1), pages 240-251, January.
    12. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    13. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    14. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
    15. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
    16. Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
    17. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
    18. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
    19. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    20. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:135:y:2001:i:1:p:128-141. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.