IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v39y1989i2p174-179.html
   My bibliography  Save this article

An economic production quantity model with flexibility and reliability considerations

Author

Listed:
  • Cheng, T. C. E.

Abstract

No abstract is available for this item.

Suggested Citation

  • Cheng, T. C. E., 1989. "An economic production quantity model with flexibility and reliability considerations," European Journal of Operational Research, Elsevier, vol. 39(2), pages 174-179, March.
  • Handle: RePEc:eee:ejores:v:39:y:1989:i:2:p:174-179
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(89)90190-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mandal, Nirmal Kumar & Roy, Tapan Kumar & Maiti, Manoranjan, 2006. "Inventory model of deteriorated items with a constraint: A geometric programming approach," European Journal of Operational Research, Elsevier, vol. 173(1), pages 199-210, August.
    2. P K Tripathy & W-M Wee & P R Majhi, 2003. "An EOQ model with process reliability considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 549-554, May.
    3. Jung, Hoon & Klein, Cerry M., 2005. "Optimal inventory policies for an economic order quantity model with decreasing cost functions," European Journal of Operational Research, Elsevier, vol. 165(1), pages 108-126, August.
    4. Vörös, József, 2003. "A minőség figyelembevételének szükségessége az egyensúlyi állapot meghatározásában [The need to consider quality when determining a state of equilibrium]," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 6-21.
    5. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Real time disruption management for a two-stage batch production–inventory system with reliability considerations," European Journal of Operational Research, Elsevier, vol. 237(1), pages 113-128.
    6. Ganeshan, Ram & Kulkarni, Shailesh & Boone, Tonya, 2001. "Production economics and process quality: A Taguchi perspective," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 343-350, May.
    7. J-C Tsou & J-M Chen, 2005. "Dynamic model for a defective production system with Poka-Yoke," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 799-803, July.
    8. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
    9. Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
    10. Leung, Kit-Nam Francis, 2007. "A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations"," European Journal of Operational Research, Elsevier, vol. 176(1), pages 240-251, January.
    11. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Managing real-time demand fluctuation under a supplier–retailer coordinated system," International Journal of Production Economics, Elsevier, vol. 158(C), pages 231-243.
    12. Voros, Jozsef, 2002. "Product balancing under conditions of quality inflation, cost pressures and growth strategies," European Journal of Operational Research, Elsevier, vol. 141(1), pages 153-166, August.
    13. Guchhait, Partha & Kumar Maiti, Manas & Maiti, Manoranjan, 2013. "Production-inventory models for a damageable item with variable demands and inventory costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 144(1), pages 180-188.
    14. Sanjoy Kumar Paul & Ruhul Sarker & Daryl Essam & Paul Tae-Woo Lee, 2019. "A mathematical modelling approach for managing sudden disturbances in a three-tier manufacturing supply chain," Annals of Operations Research, Springer, vol. 280(1), pages 299-335, September.
    15. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    16. Voros, Jozsef, 1999. "Lot sizing with quality improvement and setup time reduction," European Journal of Operational Research, Elsevier, vol. 113(3), pages 568-574, March.
    17. Jung, Hoon & Klein, Cerry M., 2006. "Optimal inventory policies for profit maximizing EOQ models under various cost functions," European Journal of Operational Research, Elsevier, vol. 174(2), pages 689-705, October.
    18. Jung, Hoon & Klein, Cerry M., 2001. "Optimal inventory policies under decreasing cost functions via geometric programming," European Journal of Operational Research, Elsevier, vol. 132(3), pages 628-642, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:39:y:1989:i:2:p:174-179. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.