IDEAS home Printed from https://ideas.repec.org/
MyIDEAS: Login to follow this author

Suresh P. Sethi

This is information that was supplied by Suresh Sethi in registering through RePEc. If you are Suresh P. Sethi , you may change this information at the RePEc Author Service. Or if you are not registered and would like to be listed as well, register at the RePEc Author Service. When you register or update your RePEc registration, you may identify the papers and articles you have authored.

Personal Details

First Name:Suresh
Middle Name:P.
Last Name:Sethi
Suffix:
RePEc Short-ID:pse207
Email:
Homepage:http://www.utdallas.edu/~sethi
Postal Address:
Phone:
Location: Dallas, Texas (United States)
Homepage: http://som.utdallas.edu/
Email:
Phone:
Fax:
Postal:
Handle: RePEc:edi:smutdus (more details at EDIRC)

This author is featured on the following reading lists, publication compilations or Wikipedia entries:

  1. Suresh P. Sethi in Wikipedia (English)
in new window

  1. Bensoussan, Alain & Chutani, Anshuman & Sethi, Suresh, 2009. "Optimal Cash Management Under Uncertainty," MPRA Paper 19896, University Library of Munich, Germany.
  2. Arrow, Kenneth J. & Bensoussan, Alain & Feng, Qi & Sethi, Suresh P., 2008. "The Genuine Saving Criterion and the Value of Population in an Economy with Endogenous Population Changes," MPRA Paper 14622, University Library of Munich, Germany.
  1. Haifeng Wang & Xiaoying Liang & Suresh Sethi & Houmin Yan, 2014. "Inventory Commitment and Prioritized Backlogging Clearance with Alternative Delivery Lead Times," Production and Operations Management, Production and Operations Management Society, vol. 23(7), pages 1227-1242, 07.
  2. Li, Tao & Sethi, Suresh P. & Zhang, Jun, 2014. "Supply diversification with isoelastic demand," International Journal of Production Economics, Elsevier, vol. 157(C), pages 2-6.
  3. Chao Liang & Suresh P. Sethi & Ruixia Shi & Jun Zhang, 2014. "Inventory Sharing with Transshipment: Impacts of Demand Distribution Shapes and Setup Costs," Production and Operations Management, Production and Operations Management Society, vol. 23(10), pages 1779-1794, October.
  4. Zhao, Yingxue & Choi, Tsan-Ming & Cheng, T.C.E. & Sethi, Suresh P. & Wang, Shouyang, 2014. "Buyback contracts with price-dependent demands: Effects of demand uncertainty," European Journal of Operational Research, Elsevier, vol. 239(3), pages 663-673.
  5. Anshuman Chutani & Suresh Sethi, 2012. "Cooperative Advertising in a Dynamic Retail Market Oligopoly," Dynamic Games and Applications, Springer, vol. 2(4), pages 347-375, December.
  6. Haruvy, Ernan E. & Li, Tao & Sethi, Suresh P., 2012. "Two-stage pricing for custom-made products," European Journal of Operational Research, Elsevier, vol. 219(2), pages 405-414.
  7. Alain Bensoussan & Qi Feng & Suresh P. Sethi, 2011. "Achieving a Long-Term Service Target with Periodic Demand Signals: A Newsvendor Framework," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 73-88, February.
  8. Krishnamoorthy, Anand & Prasad, Ashutosh & Sethi, Suresh P., 2010. "Optimal pricing and advertising in a durable-good duopoly," European Journal of Operational Research, Elsevier, vol. 200(2), pages 486-497, January.
  9. Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
  10. Gan, Xianghua & Sethi, Suresh P. & Zhou, Jing, 2010. "Commitment-penalty contracts in drop-shipping supply chains with asymmetric demand information," European Journal of Operational Research, Elsevier, vol. 204(3), pages 449-462, August.
  11. Choi, Tsan-Ming & Sethi, Suresh, 2010. "Innovative quick response programs: A review," International Journal of Production Economics, Elsevier, vol. 127(1), pages 1-12, September.
  12. Chen, Haoya & Chen, Youhua (Frank) & Chiu, Chun-Hung & Choi, Tsan-Ming & Sethi, Suresh, 2010. "Coordination mechanism for the supply chain with leadtime consideration and price-dependent demand," European Journal of Operational Research, Elsevier, vol. 203(1), pages 70-80, May.
  13. Alain Bensoussan & Jussi Keppo & Suresh P. Sethi, 2009. "Optimal Consumption And Portfolio Decisions With Partially Observed Real Prices," Mathematical Finance, Wiley Blackwell, vol. 19(2), pages 215-236.
  14. Kumar, Subodha & Sethi, Suresh P., 2009. "Dynamic pricing and advertising for web content providers," European Journal of Operational Research, Elsevier, vol. 197(3), pages 924-944, September.
  15. Dawande, Milind & Gavirneni, Srinagesh & Naranpanawe, Sanjeewa & Sethi, Suresh P., 2009. "Discrete forecast horizons for two-product variants of the dynamic lot-size problem," International Journal of Production Economics, Elsevier, vol. 120(2), pages 430-436, August.
  16. Prasad A. Naik & Ashutosh Prasad & Suresh P. Sethi, 2008. "Building Brand Awareness in Dynamic Oligopoly Markets," Management Science, INFORMS, vol. 54(1), pages 129-138, January.
  17. Alain Bensoussan & Suresh P. Sethi, 2007. "The Machine Maintenance and Sale Age Model of Kamien and Schwartz Revisited," Management Science, INFORMS, vol. 53(12), pages 1964-1976, December.
  18. Drobouchevitch, Inna G. & Sethi, Suresh P. & Sriskandarajah, Chelliah, 2006. "Scheduling dual gripper robotic cell: One-unit cycles," European Journal of Operational Research, Elsevier, vol. 171(2), pages 598-631, June.
  19. Feng, Qi & Mookerjee, Vijay S. & Sethi, Suresh. P., 2006. "Optimal policies for the sizing and timing of software maintenance projects," European Journal of Operational Research, Elsevier, vol. 173(3), pages 1047-1066, September.
  20. Frank M. Bass & Anand Krishnamoorthy & Ashutosh Prasad & Suresh P. Sethi, 2005. "Generic and Brand Advertising Strategies in a Dynamic Duopoly," Marketing Science, INFORMS, vol. 24(4), pages 556-568, February.
  21. S. P. Sethi & H. Yan & H. Zhang & Q. Zhang, 2002. "Optimal and Hierarchical Controls in Dynamic Stochastic Manufacturing Systems: A Survey," Manufacturing & Service Operations Management, INFORMS, vol. 4(2), pages 133-170.
  22. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
  23. Milind Dawande & Chelliah Sriskandarajah & Suresh Sethi, 2002. "On Throughput Maximization in Constant Travel-Time Robotic Cells," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 296-312, August.
  24. Feng Cheng & Suresh P. Sethi, 1999. "A Periodic Review Inventory Model with Demand Influenced by Promotion Decisions," Management Science, INFORMS, vol. 45(11), pages 1510-1523, November.
  25. Yang, Jun & Yan, Houmin & Sethi, Suresh P., 1999. "Optimal production planning in pull flow lines with multiple products," European Journal of Operational Research, Elsevier, vol. 119(3), pages 582-604, December.
  26. Sethi, Suresh P, 1996. "When Does the Share Price Equal the Present Value of Future Dividends? A Modified Dividend Approach," Economic Theory, Springer, vol. 8(2), pages 307-19, August.
  27. Suresh P. Sethi, 1996. "When does the share price equal the present value of future dividend approach? A modified dividend approach (*)," Economic Theory, Springer, vol. 8(2), pages 307-319.
  28. Presman, E. & Sethi, S., 1996. "Distribution of bankruptcy time in a consumption/portfolio problem," Journal of Economic Dynamics and Control, Elsevier, vol. 20(1-3), pages 471-477.
  29. Chu, Chengbin & Proth, Jean-Marie & Sethi, Suresh, 1995. "Heuristic procedures for minimizing makespan and the number of required pallets," European Journal of Operational Research, Elsevier, vol. 86(3), pages 491-502, November.
  30. Sethi, Suresh P. & Taksar, Michael I. & Presman, Ernst L., 1995. "Erratum," Journal of Economic Dynamics and Control, Elsevier, vol. 19(5-7), pages 1297-1298.
  31. Gustav Feichtinger & Richard F. Hartl & Suresh P. Sethi, 1994. "Dynamic Optimal Control Models in Advertising: Recent Developments," Management Science, INFORMS, vol. 40(2), pages 195-226, February.
  32. Sethi, Suresh P. & Kubiak, Wieslaw, 1994. "Complexity of a class of nonlinear combinatorial problems related to their linear counterparts," European Journal of Operational Research, Elsevier, vol. 73(3), pages 569-576, March.
  33. Lou, S. & Sethi, S. P. & Zhang, Q., 1994. "Optimal feedback production planning in a stochastic two-machine flowshop," European Journal of Operational Research, Elsevier, vol. 73(2), pages 331-345, March.
  34. Sethi, Suresh & Yan, Houmin & Zhang, Qing & Zhou, Xun Yu, 1993. "Feedback production planning in a stochastic two-machine flowshop: Asymptotic analysis and computational results," International Journal of Production Economics, Elsevier, vol. 30(1), pages 79-93, July.
  35. Suresh Chand & Suresh P. Sethi & Gerhard Sorger, 1992. "Forecast Horizons in the Discounted Dynamic Lot Size Model," Management Science, INFORMS, vol. 38(7), pages 1034-1048, July.
  36. Sethi, Suresh P. & Taksar, Michael I. & Presman, Ernst L., 1992. "Explicit solution of a general consumption/portfolio problem with subsistence consumption and bankruptcy," Journal of Economic Dynamics and Control, Elsevier, vol. 16(3-4), pages 747-768.
  37. S. P. Sethi & N. A. Derzko & J. P. Lehoczky, 1991. "A Stochastic Extension of the Miller-Modigliani Framework," Mathematical Finance, Wiley Blackwell, vol. 1(4), pages 57-76.
  38. Wieslaw Kubiak & Suresh Sethi, 1991. "A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"," Management Science, INFORMS, vol. 37(1), pages 121-122, January.
  39. Hall, Nicholas G. & Sethi, Suresh P. & Sriskandarajah, Chelliah, 1991. "On the complexity of generalized due date scheduling problems," European Journal of Operational Research, Elsevier, vol. 51(1), pages 100-109, March.
  40. E. Presman & S. Sethi, 1991. "Risk-Aversion Behavior In Consumption/Investment Problems," Mathematical Finance, Wiley Blackwell, vol. 1(1), pages 100-124.
  41. Donald Erlenkotter & Suresh Sethi & Norio Okada, 1989. "Planning for Surprise: Water Resources Development Under Demand and Supply Uncertainty I. The General Model," Management Science, INFORMS, vol. 35(2), pages 149-163, February.
  42. Sriskandarajah, C. & Sethi, S. P., 1989. "Scheduling algorithms for flexible flowshops: Worst and average case performance," European Journal of Operational Research, Elsevier, vol. 43(2), pages 143-160, November.
  43. Sethi, Suresh P. & Taksar, Michael, 1988. "A note on Merton's "Optimum Consumption and Portfolio Rules in a continuous-Time Model"," Journal of Economic Theory, Elsevier, vol. 46(2), pages 395-401, December.
  44. Sethi, S. P. & Thompson, G. L. & Udayabhanu, V., 1985. "Profit maximization models for exponential decay processes," European Journal of Operational Research, Elsevier, vol. 22(1), pages 101-115, October.
  45. Thompson, Gerald L. & Sethi, Suresh P. & Teng, Jinn-Tsair, 1984. "Strong planning and forecast horizons for a model with simultaneous price and production decisions," European Journal of Operational Research, Elsevier, vol. 16(3), pages 378-388, June.
  46. Suresh P. Sethi, 1983. "Note---Optimal Long-Run Equilibrium Advertising Level for the Blattberg-Jeuland Model," Management Science, INFORMS, vol. 29(12), pages 1436-1443, December.
  47. Caines, P. E. & Keng, C. W. & Sethi, S. P., 1981. "Causality analysis and multivariate Autoregressive modelling with an application to supermarket sales analysis," Journal of Economic Dynamics and Control, Elsevier, vol. 3(1), pages 267-298, November.
  48. Sethi, Suresh P. & Lehoczky, John P., 1981. "A comparison of the Ito and Stratonovich formulations of problems in finance," Journal of Economic Dynamics and Control, Elsevier, vol. 3(1), pages 343-356, November.
  49. Bourguignon, Francoise & Sethi, Suresh P., 1981. "Dynamic optimal pricing and (possibly) advertising in the face of various kinds of potential entrants," Journal of Economic Dynamics and Control, Elsevier, vol. 3(1), pages 119-140, November.
  50. Gerald L. Thompson & Suresh P. Sethi, 1980. "Turnpike Horizons for Production Planning," Management Science, INFORMS, vol. 26(3), pages 229-241, March.
  51. Suresh P. Sethi, 1979. "Optimal Pilfering Policies for Dynamic Continuous Thieves," Management Science, INFORMS, vol. 25(6), pages 535-542, June.
  52. Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
  53. Sethi, Suresh P., 1978. "A Note on Modeling Simple Dynamic Cash Balance Problem: Errata," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 13(03), pages 585-586, September.
  54. Sethi, Suresh P., 1978. "Optimal Equity and Financing Model of Krouse and Lee: Corrections and Extensions," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 13(03), pages 487-505, September.
  55. Sethi, Suresh P., 1973. "A Note on Modeling Simple Dynamic Cash Balance Problems," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 8(04), pages 685-687, September.
  56. Sethi, Suresh P., 1971. "A Note on a Planning Horizon Model of Cash Management," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 6(01), pages 659-664, January.
  57. Sethi, Suresh P. & Thompson, Gerald L., 1970. "Applications of Mathematical Control Theory to Finance: Modeling Simple Dynamic Cash Balance Problems," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 5(4-5), pages 381-394, December.
  1. P. E. Caines & S. P. Sethi & T. W. Brotherton, 1977. "Impulse Response Identification and Causality Detection for the Lydia-Pinkham Data," NBER Chapters, in: Annals of Economic and Social Measurement, Volume 6, number 2, pages 147-163 National Bureau of Economic Research, Inc.
2 papers by this author were announced in NEP, and specifically in the following field reports (number of papers):
  1. NEP-AGE: Economics of Ageing (1) 2009-04-18. Author is listed
  2. NEP-FDG: Financial Development & Growth (1) 2009-04-18. Author is listed
This author is among the top 5% authors according to these criteria:
  1. Number of Distinct Works, Weighted by Number of Authors
  2. Number of Journal Pages
  3. Number of Journal Pages, Weighted by Number of Authors

Most cited item

Most downloaded item (past 12 months)

Access and download statistics for all items

Co-authorship network on CollEc

For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Suresh Sethi should log into the RePEc Author Service

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.