IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v173y2016icp170-183.html
   My bibliography  Save this article

Supplier flexibility and postponement implementation: An empirical analysis

Author

Listed:
  • Saghiri, Soroosh S.
  • Barnes, Stuart J.

Abstract

Postponement has been recognized as a strategy to manage uncertainties in demand. Its performance however depends on various prerequisites. Numerous technical factors that influence postponement such as product modularity and process redesign have been widely studied. Notwithstanding, the effect of external factors on postponement have been paid much less attention. This paper addresses the external factors which affect postponement application, and in particular, concentrates on the relationship between supplier flexibility and postponement implementation. Four constructs of flexibility and three constructs of postponement – namely volume flexibility, mix flexibility, new product design flexibility, product modification flexibility, manufacturing postponement, ordering postponement and product design postponement – are identified, and measured variables for each construct are extracted from the literature. Supported by a theoretical ground, built based on the literature, the positive relationships among supplier flexibility and postponement constructs are then tested through structural equation modeling (SEM) using empirical data from a sample of 219 manufacturing SMEs in one country. The results indicate that the supplier impacts on postponement implementation for the buying firm are not identical for all types of postponements and supplier flexibilities. While manufacturing postponement and ordering postponement are supported by supplier volume and mix flexibilities, design postponement is only related with product modification flexibility. These findings enhance the postponement knowledge with respect to external influencing factors from a general level to a more precise, specific level. The implications of the research outcomes are discussed and directions for future research are provided.

Suggested Citation

  • Saghiri, Soroosh S. & Barnes, Stuart J., 2016. "Supplier flexibility and postponement implementation: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 173(C), pages 170-183.
  • Handle: RePEc:eee:proeco:v:173:y:2016:i:c:p:170-183
    DOI: 10.1016/j.ijpe.2015.12.015
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731500540X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.12.015?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Joseph M. Milner & Panos Kouvelis, 2002. "On the Complementary Value of Accurate Demand Information and Production and Supplier Flexibility," Manufacturing & Service Operations Management, INFORMS, vol. 4(2), pages 99-113, December.
    2. Bengtsson, Jens & Olhager, Jan, 2002. "Valuation of product-mix flexibility using real options," International Journal of Production Economics, Elsevier, vol. 78(1), pages 13-28, July.
    3. Jarvis, Cheryl Burke & MacKenzie, Scott B & Podsakoff, Philip M, 2003. "A Critical Review of Construct Indicators and Measurement Model Misspecification in Marketing and Consumer Research," Journal of Consumer Research, Journal of Consumer Research Inc., vol. 30(2), pages 199-218, September.
    4. Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
    5. Gary C. Moore & Izak Benbasat, 1991. "Development of an Instrument to Measure the Perceptions of Adopting an Information Technology Innovation," Information Systems Research, INFORMS, vol. 2(3), pages 192-222, September.
    6. Armstrong, J. Scott & Overton, Terry S., 1977. "Estimating Nonresponse Bias in Mail Surveys," MPRA Paper 81694, University Library of Munich, Germany.
    7. Hallgren, Mattias & Olhager, Jan, 2009. "Flexibility configurations: Empirical analysis of volume and product mix flexibility," Omega, Elsevier, vol. 37(4), pages 746-756, August.
    8. McQuitty, Shaun, 2004. "Statistical power and structural equation models in business research," Journal of Business Research, Elsevier, vol. 57(2), pages 175-183, February.
    9. Erhan Kesen, Saadettin & Kanchanapiboon, Atipol & Das, Sanchoy K., 2010. "Evaluating supply chain flexibility with order quantity constraints and lost sales," International Journal of Production Economics, Elsevier, vol. 126(2), pages 181-188, August.
    10. Wong, Hartanto & Potter, Andrew & Naim, Mohamed, 2011. "Evaluation of postponement in the soluble coffee supply chain: A case study," International Journal of Production Economics, Elsevier, vol. 131(1), pages 355-364, May.
    11. Lettice, Fiona & Wyatt, Clare & Evans, Stephen, 2010. "Buyer-supplier partnerships during product design and development in the global automotive sector: Who invests, in what and when?," International Journal of Production Economics, Elsevier, vol. 127(2), pages 309-319, October.
    12. Kisperska-Moron, Danuta & Swierczek, Artur, 2011. "The selected determinants of manufacturing postponement within supply chain context: An international study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 192-200, September.
    13. Tsubakitani, Shigeru & Deckro, Richard F., 1990. "A heuristic for multi-project scheduling with limited resources in the housing industry," European Journal of Operational Research, Elsevier, vol. 49(1), pages 80-91, November.
    14. Brun, Alessandro & Zorzini, Marta, 2009. "Evaluation of product customization strategies through modularization and postponement," International Journal of Production Economics, Elsevier, vol. 120(1), pages 205-220, July.
    15. Qing Li & Xiaoli Wu & Ki Ling Cheung, 2009. "Optimal Policies for Inventory Systems with Separate Delivery-Request and Order-Quantity Decisions," Operations Research, INFORMS, vol. 57(3), pages 626-636, June.
    16. Garavelli, A. Claudio, 2003. "Flexibility configurations for the supply chain management," International Journal of Production Economics, Elsevier, vol. 85(2), pages 141-153, August.
    17. Bidault, Francis & Despres, Charles & Butler, Christina, 1998. "The drivers of cooperation between buyers and suppliers for product innovation," Research Policy, Elsevier, vol. 26(7-8), pages 719-732, April.
    18. Peter Schentler, 2009. "Implementing mass customisation in the automotive industry: an analysis of requirements for procurement and procurement objects," International Journal of Automotive Technology and Management, Inderscience Enterprises Ltd, vol. 9(3), pages 260-274.
    19. Boulaksil, Youssef & Fransoo, Jan C., 2009. "Order release strategies to control outsourced operations in a supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 149-160, May.
    20. Gosling, J. & Purvis, L. & Naim, M.M., 2010. "Supply chain flexibility as a determinant of supplier selection," International Journal of Production Economics, Elsevier, vol. 128(1), pages 11-21, November.
    21. Fu, Qi & Lee, Chung-Yee & Teo, Chung-Piaw, 2012. "Modified critical fractile approach for a class of partial postponement problems," International Journal of Production Economics, Elsevier, vol. 136(1), pages 185-193.
    22. Sharifi, H. & Zhang, Z., 1999. "A methodology for achieving agility in manufacturing organisations: An introduction," International Journal of Production Economics, Elsevier, vol. 62(1-2), pages 7-22, May.
    23. MacCarthy, Bart & Brabazon, Philip G. & Bramham, Johanna, 2003. "Fundamental modes of operation for mass customization," International Journal of Production Economics, Elsevier, vol. 85(3), pages 289-304, September.
    24. Hau L. Lee & Christopher S. Tang, 1997. "Modelling the Costs and Benefits of Delayed Product Differentiation," Management Science, INFORMS, vol. 43(1), pages 40-53, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lee, Chang-Yong & Lee, Dongju, 2018. "An efficient method for solving a correlated multi-item inventory system," Operations Research Perspectives, Elsevier, vol. 5(C), pages 13-21.
    2. Marta Pérez-Pérez & Canan Kocabasoglu-Hillmer & Ana María Serrano-Bedia & María Concepción López-Fernández, 2019. "Manufacturing and Supply Chain Flexibility: Building an Integrative Conceptual Model Through Systematic Literature Review and Bibliometric Analysis," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 20(1), pages 1-23, December.
    3. Jafari, Hamid & Eslami, Mohammad H. & Paulraj, Antony, 2022. "Postponement and logistics flexibility in retailing: The moderating role of logistics integration and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
    4. Xiongyong Zhou & Zhiduan Xu, 2018. "An Integrated Sustainable Supplier Selection Approach Based on Hybrid Information Aggregation," Sustainability, MDPI, vol. 10(7), pages 1-49, July.
    5. Choi, Tsan-Ming & Chen, Yue & Chung, Sai Ho, 2019. "Online-offline fashion franchising supply chains without channel conflicts: Choices on postponement and contracts," International Journal of Production Economics, Elsevier, vol. 215(C), pages 174-184.
    6. Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
    7. Hosseini, Seyedmohsen & Barker, Kash, 2016. "A Bayesian network model for resilience-based supplier selection," International Journal of Production Economics, Elsevier, vol. 180(C), pages 68-87.
    8. Wu, Jun & Du, Gang & Jiao, Roger J., 2021. "Optimal postponement contracting decisions in crowdsourced manufacturing: A three-level game-theoretic model for product family architecting considering subcontracting," European Journal of Operational Research, Elsevier, vol. 291(2), pages 722-737.
    9. Ghomi, Vahid & Gligor, David & Parast, Mahour & Shokoohyar, Sina & Esfahani, Mina Ghofrani, 2021. "Antecedents and consequences of customer flexibility: Establishing the link to firm competitive advantage," Journal of Retailing and Consumer Services, Elsevier, vol. 62(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liao, Kun & Deng, Xiaodong & Marsillac, Erika, 2013. "Factors that influence Chinese automotive suppliers’ mass customization capabilities," International Journal of Production Economics, Elsevier, vol. 146(1), pages 25-36.
    2. Raschke, Robyn L., 2010. "Process-based view of agility: The value contribution of IT and the effects on process outcomes," International Journal of Accounting Information Systems, Elsevier, vol. 11(4), pages 297-313.
    3. Das, Kanchan, 2011. "Integrating effective flexibility measures into a strategic supply chain planning model," European Journal of Operational Research, Elsevier, vol. 211(1), pages 170-183, May.
    4. Kim, Yusoon & Choi, Thomas Y., 2021. "Supplier relationship strategies and outcome dualities: An empirical study of embeddedness perspective," International Journal of Production Economics, Elsevier, vol. 232(C).
    5. Chowdhury, Md Maruf H. & Quaddus, Mohammed, 2017. "Supply chain resilience: Conceptualization and scale development using dynamic capability theory," International Journal of Production Economics, Elsevier, vol. 188(C), pages 185-204.
    6. Thomé, Antonio Márcio T. & Scavarda, Luiz Felipe & Pires, Sílvio R.I. & Ceryno, Paula & Klingebiel, Katja, 2014. "A multi-tier study on supply chain flexibility in the automotive industry," International Journal of Production Economics, Elsevier, vol. 158(C), pages 91-105.
    7. Arun Rai & Xinlin Tang, 2010. "Leveraging IT Capabilities and Competitive Process Capabilities for the Management of Interorganizational Relationship Portfolios," Information Systems Research, INFORMS, vol. 21(3), pages 516-542, September.
    8. Wen-Lung Shiau & Yogesh K. Dwivedi, 2013. "Citation and co-citation analysis to identify core and emerging knowledge in electronic commerce research," Scientometrics, Springer;Akadémiai Kiadó, vol. 94(3), pages 1317-1337, March.
    9. Lockström, Martin & Lei, Liu, 2013. "Antecedents to supplier integration in China: A partial least squares analysis," International Journal of Production Economics, Elsevier, vol. 141(1), pages 295-306.
    10. Enrique, Daisy Valle & Lerman, Laura Visintainer & Sousa, Paulo Renato de & Benitez, Guilherme Brittes & Bigares Charrua Santos, Fernando M. & Frank, Alejandro G., 2022. "Being digital and flexible to navigate the storm: How digital transformation enhances supply chain flexibility in turbulent environments," International Journal of Production Economics, Elsevier, vol. 250(C).
    11. Moon, Karen Ka-Leung & Yi, Candace Ying & Ngai, E.W.T., 2012. "An instrument for measuring supply chain flexibility for the textile and clothing companies," European Journal of Operational Research, Elsevier, vol. 222(2), pages 191-203.
    12. Sousa, Carlos M.P. & Bradley, Frank, 2008. "Antecedents of international pricing adaptation and export performance," Journal of World Business, Elsevier, vol. 43(3), pages 307-320, July.
    13. Aziz Barhmi & Omar Hajaji, 2023. "Multidisciplinary Approach to Supply Chain Resilience: Conceptualization and Scale Development," Central European Business Review, Prague University of Economics and Business, vol. 2023(5), pages 43-69.
    14. Schneider, Christian O. & Bremen, Philipp & Schönsleben, Paul & Alard, Robert, 2013. "Transaction cost economics in global sourcing: Assessing regional differences and implications for performance," International Journal of Production Economics, Elsevier, vol. 141(1), pages 243-254.
    15. von den Driesch, Till & Eva Susanne da Costa, Maika & Christina Flatten, Tessa & Brettel, Malte, 2015. "How CEO experience, personality, and network affect firms' dynamic capabilities," European Management Journal, Elsevier, vol. 33(4), pages 245-256.
    16. Riffat Ara Zannat Tama & Md Mahmudul Hoque & Ying Liu & Mohammad Jahangir Alam & Mark Yu, 2023. "An Application of Partial Least Squares Structural Equation Modeling (PLS-SEM) to Examining Farmers’ Behavioral Attitude and Intention towards Conservation Agriculture in Bangladesh," Agriculture, MDPI, vol. 13(2), pages 1-22, February.
    17. Maria Ripollés & Andreu Blesa, 2020. "And yet, non-equity cooperative entries do improve international performance: uncovering the role of networks’ social capital," Small Business Economics, Springer, vol. 55(3), pages 761-776, October.
    18. Christina Boedker & Kar Ming Chong, 2022. "The mediating role of accounting controls between supervisors' empowering leadership style and subordinates' creativity and goal productivity," Accounting and Finance, Accounting and Finance Association of Australia and New Zealand, vol. 62(4), pages 4587-4614, December.
    19. Rogier van de Wetering & Sherah Kurnia & Svyatoslav Kotusev, 2020. "The Effect of Enterprise Architecture Deployment Practices on Organizational Benefits: A Dynamic Capability Perspective," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
    20. Peters, Matt D. & Wieder, Bernhard & Sutton, Steve G. & Wakefield, James, 2016. "Business intelligence systems use in performance measurement capabilities: Implications for enhanced competitive advantage," International Journal of Accounting Information Systems, Elsevier, vol. 21(C), pages 1-17.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:173:y:2016:i:c:p:170-183. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.