When building a cross-border transmission line (a so-called interconnector) as a for-profit (merchant) project, where the regulator has required that capacity allocation be done non-discriminatorily by explicit auction, the identity of the investor can affect the profitability of the interconnector project and, once operational, the resulting allocation of its capacity. Specifically, when the investor is a generator (hereafter the integrated generator) who also can use the interconnector to export its electricity to a distant location, then, once operational, the integrated generator will bid more aggressively in the allocation auctions to increase the auction revenue and thus its profits. As a result, the integrated generator is more likely to win the auction and the capacity is sold for a higher price. This lowers the allocative efficiency of the auction, but it increases the expected ex-ante profitability of the merchant interconnector project. Unaffiliated, independent generators, however, are less likely to win the auction and, in any case, pay a higher price, which dramatically lowers their revenues from exporting electricity over this interconnector.

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://cadmus.eui.eu/bitstream/handle/1814/15797/RSCAS_2011_10.pdf?sequence=1
File Function: Full text
Download Restriction: no

Bibliographic Info

Paper provided by European University Institute in its series RSCAS Working Papers with number 2011/10.

as in new window
Length:
Date of creation: 25 Feb 2011
Date of revision:
Handle: RePEc:rsc:rsceui:2011/10

Contact details of provider:
Postal: Convento, Via delle Fontanelle, 19, 50014 San Domenico di Fiesole (FI) Italy
Web page: http://www.eui.eu/RSCAS/
More information through EDIRC

Related research

Keywords: electricity markets; regulation; cross-border electricity transmissions; vertical integration; asymmetric auctions; bidding behavior;

Other versions of this item:

This paper has been announced in the following NEP Reports:

References

References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
as in new window
  1. Helm, D., 2003. "Auctions and Energy Networks1," Utilities Policy, Elsevier, vol. 11(1), pages 21-25, March.
  2. Klemperer, Paul, 1999. " Auction Theory: A Guide to the Literature," Journal of Economic Surveys, Wiley Blackwell, vol. 13(3), pages 227-86, July.
  3. Yarrow, G., 2003. "Capacity auctions in the UK energy sector," Utilities Policy, Elsevier, vol. 11(1), pages 9-20, March.
  4. Paul Klemperer & Jeremy Bulow, 1998. "Toeholds and Takeovers," Economics Series Working Papers 1998-W04, University of Oxford, Department of Economics.
  5. Felix Höffler & Sebastian Kranz, 2007. "Legal Unbundling can be a Golden Mean between Vertical Integration and Separation," Bonn Econ Discussion Papers bgse15_2007, University of Bonn, Germany.
  6. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, 06.
  7. Silvester van Koten & Andreas Ortmann, 2007. "The Unbundling Regime for Electricity Utilities in the EU: A Case of Legislative and Regulatory Capture?," CERGE-EI Working Papers wp328, The Center for Economic Research and Graduate Education - Economic Institute, Prague.
  8. Smith, Vernon L & Walker, James M, 1993. "Monetary Rewards and Decision Cost in Experimental Economics," Economic Inquiry, Western Economic Association International, vol. 31(2), pages 245-61, April.
  9. Von der Fehr, N.H.M. & Harbord, D., 1992. "Spot Market Competition in the UK Electricity Industry," Memorandum 09/1992, Oslo University, Department of Economics.
  10. Leautier, Thomas-Olivier, 2001. "Transmission Constraints and Imperfect Markets for Power," Journal of Regulatory Economics, Springer, vol. 19(1), pages 27-54, January.
  11. Burkart, Mike, 1995. " Initial Shareholdings and Overbidding in Takeover Contests," Journal of Finance, American Finance Association, vol. 50(5), pages 1491-1515, December.
  12. Parisio, Lucia & Bosco, Bruno, 2008. "Electricity prices and cross-border trade: Volume and strategy effects," Energy Economics, Elsevier, vol. 30(4), pages 1760-1775, July.
  13. Brunekreeft, Gert, 2004. "Market-based investment in electricity transmission networks: controllable flow," Utilities Policy, Elsevier, vol. 12(4), pages 269-281, December.
  14. Stern, J. & Turvey, R., 2003. "Auctions of capacity in network industries," Utilities Policy, Elsevier, vol. 11(1), pages 1-8, March.
Full references (including those not matched with items on IDEAS)

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
  1. Silvester Koten, 2013. "Legal unbundling and auctions in vertically integrated (utilities) markets," European Journal of Law and Economics, Springer, vol. 36(3), pages 543-573, December.
  2. Lidia Puka & Kacper Szulecki, 2014. "Beyond the "Grid-Lock" in Electricity Interconnectors: The Case of Germany and Poland," Discussion Papers of DIW Berlin 1378, DIW Berlin, German Institute for Economic Research.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:rsc:rsceui:2011/10. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (RSCAS web unit).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.