IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v129y2011i1p157-168.html
   My bibliography  Save this article

A survey of the application of fuzzy set theory in production and operations management: 1998-2009

Author

Listed:
  • Wong, Bo K.
  • Lai, Vincent S.

Abstract

The objectives of this research are to identify the research trends in and publication outlets for the applications of the fuzzy set theory technique in production and operations management (POM). The major findings indicate that (1) the most popular applications are capacity planning, scheduling, inventory control, and product design, (2) some application areas make more use of particular types of fuzzy techniques, (3) the percentage of applications that address semi/unstructured types of POM problems is increasing, (4) the most common technologies integrated with the fuzzy set theory technique are genetic/evolutionary algorithms and neural networks, and (5) the most popular development tool is C Language and its extension. Our survey confirms several research trends, some of which are unexpected and some of which contradict previous findings.

Suggested Citation

  • Wong, Bo K. & Lai, Vincent S., 2011. "A survey of the application of fuzzy set theory in production and operations management: 1998-2009," International Journal of Production Economics, Elsevier, vol. 129(1), pages 157-168, January.
  • Handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:157-168
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00351-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Wei & Wang, Dingwei & Ip, W. H., 1999. "JIT production planning approach with fuzzy due date for OKP manufacturing systems," International Journal of Production Economics, Elsevier, vol. 58(2), pages 209-215, January.
    2. Triantis, Konstantinos & Sarangi, Sudipta & Kuchta, Dorota, 2003. "Fuzzy pair-wise dominance and fuzzy indices: An evaluation of productive performance," European Journal of Operational Research, Elsevier, vol. 144(2), pages 412-428, January.
    3. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
    4. Chen, Shih-Pin, 2007. "Analysis of critical paths in a project network with fuzzy activity times," European Journal of Operational Research, Elsevier, vol. 183(1), pages 442-459, November.
    5. Fortemps, P., 2003. "Fuzzy sets in scheduling and planning," European Journal of Operational Research, Elsevier, vol. 147(2), pages 229-230, June.
    6. Amid, Amin & Ghodsypour, S.H. & O'Brien, Christopher, 2009. "A weighted additive fuzzy multiobjective model for the supplier selection problem under price breaks in a supply Chain," International Journal of Production Economics, Elsevier, vol. 121(2), pages 323-332, October.
    7. Bogataj, Marija & Usenik, Janez, 2005. "Fuzzy approach to the spatial games in the total market area," International Journal of Production Economics, Elsevier, vol. 93(1), pages 493-503, January.
    8. Famuyiwa, Oluwafemi & Monplaisir, Leslie & Nepal, Bimal, 2008. "An integrated fuzzy-goal-programming-based framework for selecting suppliers in strategic alliance formation," International Journal of Production Economics, Elsevier, vol. 113(2), pages 862-875, June.
    9. Qin, X.S. & Huang, G.H. & Zeng, G.M. & Chakma, A. & Huang, Y.F., 2007. "An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1331-1357, August.
    10. Chanas, Stefan & Kasperski, Adam, 2003. "On two single machine scheduling problems with fuzzy processing times and fuzzy due dates," European Journal of Operational Research, Elsevier, vol. 147(2), pages 281-296, June.
    11. Bottani, Eleonora & Rizzi, Antonio, 2006. "Strategic management of logistics service: A fuzzy QFD approach," International Journal of Production Economics, Elsevier, vol. 103(2), pages 585-599, October.
    12. F-M Tseng, 2008. "Quadratic interval innovation diffusion models for new product sales forecasting," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1120-1127, August.
    13. Petrovic, Dobrila & Xie, Ying & Burnham, Keith & Petrovic, Radivoj, 2008. "Coordinated control of distribution supply chains in the presence of fuzzy customer demand," European Journal of Operational Research, Elsevier, vol. 185(1), pages 146-158, February.
    14. Yao, Jing-Shing & Ouyang, Liang-Yuh & Chang, Hung-Chi, 2003. "Models for a fuzzy inventory of two replaceable merchandises without backorder based on the signed distance of fuzzy sets," European Journal of Operational Research, Elsevier, vol. 150(3), pages 601-616, November.
    15. Chou, Shuo-Yan & Chang, Yao-Hui & Shen, Chun-Ying, 2008. "A fuzzy simple additive weighting system under group decision-making for facility location selection with objective/subjective attributes," European Journal of Operational Research, Elsevier, vol. 189(1), pages 132-145, August.
    16. Büyüközkan, Gülçin & Feyzioglu, Orhan & Nebol, Erdal, 2008. "Selection of the strategic alliance partner in logistics value chain," International Journal of Production Economics, Elsevier, vol. 113(1), pages 148-158, May.
    17. Nepal, Bimal & Monplaisir, Leslie & Singh, Nanua, 2005. "Integrated fuzzy logic-based model for product modularization during concept development phase," International Journal of Production Economics, Elsevier, vol. 96(2), pages 157-174, May.
    18. Petrovic, Dobrila, 2001. "Simulation of supply chain behaviour and performance in an uncertain environment," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 429-438, May.
    19. Fang-Mei Tseng, 2008. "Quadratic-Interval Innovation Diffusion Models for New Product Sales Forecasting," World Scientific Book Chapters, in: Mostafa Hashem Sherif & Tarek M Khalil (ed.), Management Of Technology Innovation And Value Creation Selected Papers from the 16th International Conference on Management of Technology, chapter 25, pages 415-433, World Scientific Publishing Co. Pte. Ltd..
    20. R Tavakkoli-Moghaddam & N Safaei & M M O Kah, 2008. "Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(4), pages 431-442, April.
    21. Das, S. K. & Goswami, A. & Alam, S. S., 1999. "Multiobjective transportation problem with interval cost, source and destination parameters," European Journal of Operational Research, Elsevier, vol. 117(1), pages 100-112, August.
    22. Faez, F. & Ghodsypour, S.H. & O'Brien, C., 2009. "Vendor selection and order allocation using an integrated fuzzy case-based reasoning and mathematical programming model," International Journal of Production Economics, Elsevier, vol. 121(2), pages 395-408, October.
    23. Balan, S. & Vrat, Prem & Kumar, Pradeep, 2009. "Information distortion in a supply chain and its mitigation using soft computing approach," Omega, Elsevier, vol. 37(2), pages 282-299, April.
    24. Liu, Shiang-Tai & Kao, Chiang, 2004. "Solving fuzzy transportation problems based on extension principle," European Journal of Operational Research, Elsevier, vol. 153(3), pages 661-674, March.
    25. Thomassey, Sebastien & Happiette, Michel & Castelain, Jean-Marie, 2005. "A global forecasting support system adapted to textile distribution," International Journal of Production Economics, Elsevier, vol. 96(1), pages 81-95, April.
    26. Katagiri, Hideki & Ishii, Hiroaki, 2002. "Fuzzy inventory problems for perishable commodities," European Journal of Operational Research, Elsevier, vol. 138(3), pages 545-553, May.
    27. Chen, Shan Huo & Chang, Shu Man, 2008. "Optimization of fuzzy production inventory model with unrepairable defective products," International Journal of Production Economics, Elsevier, vol. 113(2), pages 887-894, June.
    28. Xie, Ying & Petrovic, Dobrila & Burnham, Keith, 2006. "A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand," International Journal of Production Economics, Elsevier, vol. 102(1), pages 37-50, July.
    29. Shiromaru, Isao & Inuiguchi, Masahiro & Sakawa, Masatoshi, 2000. "A fuzzy satisficing method for electric power plant coal purchase using genetic algorithms," European Journal of Operational Research, Elsevier, vol. 126(1), pages 218-230, October.
    30. Wang, Juite & Hwang, W.-L., 2007. "A fuzzy set approach for R&D portfolio selection using a real options valuation model," Omega, Elsevier, vol. 35(3), pages 247-257, June.
    31. Thomassey, Sebastien & Happiette, Michel & Castelain, Jean Marie, 2005. "A short and mean-term automatic forecasting system--application to textile logistics," European Journal of Operational Research, Elsevier, vol. 161(1), pages 275-284, February.
    32. Bottani, Eleonora & Rizzi, Antonio, 2008. "An adapted multi-criteria approach to suppliers and products selection--An application oriented to lead-time reduction," International Journal of Production Economics, Elsevier, vol. 111(2), pages 763-781, February.
    33. Sakawa, Masatoshi & Kubota, Ryo, 2000. "Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms," European Journal of Operational Research, Elsevier, vol. 120(2), pages 393-407, January.
    34. Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj, 1999. "Supply chain modelling using fuzzy sets," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 443-453, March.
    35. Sakawa, Masatoshi & Nishizaki, Ichiro & Uemura, Yoshio, 2002. "A decentralized two-level transportation problem in a housing material manufacturer: Interactive fuzzy programming approach," European Journal of Operational Research, Elsevier, vol. 141(1), pages 167-185, August.
    36. Kulak, Osman & Kahraman, Cengiz, 2005. "Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach," International Journal of Production Economics, Elsevier, vol. 95(3), pages 415-424, March.
    37. J R Wang, 1999. "A fuzzy set approach to activity scheduling for product development," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(12), pages 1217-1228, December.
    38. Kahraman, Cengiz & Ertay, Tijen & Buyukozkan, Gulcin, 2006. "A fuzzy optimization model for QFD planning process using analytic network approach," European Journal of Operational Research, Elsevier, vol. 171(2), pages 390-411, June.
    39. Hua Tan, Kim & Peng Lim, Chee & Platts, Ken & Shen Koay, Hooi, 2006. "An intelligent decision support system for manufacturing technology investments," International Journal of Production Economics, Elsevier, vol. 104(1), pages 179-190, November.
    40. Sheu, Jiuh-Biing, 2008. "A hybrid neuro-fuzzy analytical approach to mode choice of global logistics management," European Journal of Operational Research, Elsevier, vol. 189(3), pages 971-986, September.
    41. Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj, 1998. "Modelling and simulation of a supply chain in an uncertain environment," European Journal of Operational Research, Elsevier, vol. 109(2), pages 299-309, September.
    42. Chan, Felix T. S. & Jiang, Bing & Tang, Nelson K. H., 2000. "The development of intelligent decision support tools to aid the design of flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 65(1), pages 73-84, April.
    43. Anglani, Alfredo & Grieco, Antonio & Guerriero, Emanuela & Musmanno, Roberto, 2005. "Robust scheduling of parallel machines with sequence-dependent set-up costs," European Journal of Operational Research, Elsevier, vol. 161(3), pages 704-720, March.
    44. Slyeptsov, Anatoliy I. & Tyshchuk, Tetyana A., 2003. "Fuzzy temporal characteristics of operations for project management on the network models basis," European Journal of Operational Research, Elsevier, vol. 147(2), pages 253-265, June.
    45. K A H Kobbacy & S Vadera & M H Rasmy, 2007. "AI and OR in management of operations: history and trends," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 10-28, January.
    46. Hellendoorn, Hans, 1997. "After the fuzzy wave reached Europe," European Journal of Operational Research, Elsevier, vol. 99(1), pages 58-71, May.
    47. Handfield, Robert & Warsing, Don & Wu, Xinmin, 2009. "(Q,r) Inventory policies in a fuzzy uncertain supply chain environment," European Journal of Operational Research, Elsevier, vol. 197(2), pages 609-619, September.
    48. Chen, Yizeng & Fung, Richard Y.K. & Tang, Jiafu, 2006. "Rating technical attributes in fuzzy QFD by integrating fuzzy weighted average method and fuzzy expected value operator," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1553-1566, November.
    49. Ma, Li-Ching & Li, Han-Lin, 2008. "A fuzzy ranking method with range reduction techniques," European Journal of Operational Research, Elsevier, vol. 184(3), pages 1032-1043, February.
    50. Zhu, Ke-Jun & Jing, Yu & Chang, Da-Yong, 1999. "A discussion on Extent Analysis Method and applications of fuzzy AHP," European Journal of Operational Research, Elsevier, vol. 116(2), pages 450-456, July.
    51. Abdi, M.R., 2009. "Fuzzy multi-criteria decision model for evaluating reconfigurable machines," International Journal of Production Economics, Elsevier, vol. 117(1), pages 1-15, January.
    52. Chen, Chien-Ming, 2009. "A fuzzy-based decision-support model for rebuy procurement," International Journal of Production Economics, Elsevier, vol. 122(2), pages 714-724, December.
    53. Fernandez, Eduardo & Navarro, Jorge & Bernal, Sergio, 2009. "Multicriteria sorting using a valued indifference relation under a preference disaggregation paradigm," European Journal of Operational Research, Elsevier, vol. 198(2), pages 602-609, October.
    54. Becher, Michael, 2009. "Simultaneous capacity and price control based on fuzzy controllers," International Journal of Production Economics, Elsevier, vol. 121(2), pages 365-382, October.
    55. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2003. "A fuzzy echelon approach for inventory management in supply chains," European Journal of Operational Research, Elsevier, vol. 149(1), pages 185-196, August.
    56. Munda, Giuseppe, 2009. "A conflict analysis approach for illuminating distributional issues in sustainability policy," European Journal of Operational Research, Elsevier, vol. 194(1), pages 307-322, April.
    57. Noci, Giuliano & Toletti, Giovanni, 2000. "Selecting quality-based programmes in small firms: A comparison between the fuzzy linguistic approach and the analytic hierarchy process," International Journal of Production Economics, Elsevier, vol. 67(2), pages 113-133, September.
    58. Wen, Meilin & Iwamura, Kakuzo, 2008. "Fuzzy facility location-allocation problem under the Hurwicz criterion," European Journal of Operational Research, Elsevier, vol. 184(2), pages 627-635, January.
    59. Liang, Gin-Shuh, 1999. "Fuzzy MCDM based on ideal and anti-ideal concepts," European Journal of Operational Research, Elsevier, vol. 112(3), pages 682-691, February.
    60. Buyukozkan, G.Gulcin & Feyzioglu, Orhan, 2004. "A fuzzy-logic-based decision-making approach for new product development," International Journal of Production Economics, Elsevier, vol. 90(1), pages 27-45, July.
    61. Uno, Takeshi & Katagiri, Hideki, 2008. "Single- and multi-objective defensive location problems on a network," European Journal of Operational Research, Elsevier, vol. 188(1), pages 76-84, July.
    62. Bonfatti, M. & Caridi, M. & Schiavina, L., 2006. "A fuzzy model for load-oriented manufacturing control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 502-513, December.
    63. Abd El-Wahed, Waiel F. & Lee, Sang M., 2006. "Interactive fuzzy goal programming for multi-objective transportation problems," Omega, Elsevier, vol. 34(2), pages 158-166, April.
    64. Bin, Hongzan & Jin, Jianxin & Sun, Yu & Yang, Ming, 1999. "Performance-based control for the machining process and its application," International Journal of Production Economics, Elsevier, vol. 60(1), pages 491-496, April.
    65. Cheng, Jinliang & Steiner, George & Stephenson, Paul, 2001. "A computational study with a new algorithm for the three-machine permutation flow-shop problem with release times," European Journal of Operational Research, Elsevier, vol. 130(3), pages 559-575, May.
    66. Wang, Juite, 2004. "A fuzzy robust scheduling approach for product development projects," European Journal of Operational Research, Elsevier, vol. 152(1), pages 180-194, January.
    67. Mok, P.Y. & Kwong, C.K. & Wong, W.K., 2007. "Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1876-1893, March.
    68. Allet, Samir, 2003. "Handling flexibility in a "generalised job shop" with a fuzzy approach," European Journal of Operational Research, Elsevier, vol. 147(2), pages 312-333, June.
    69. Kunsch, P. & Springael, J., 2008. "Simulation with system dynamics and fuzzy reasoning of a tax policy to reduce CO2 emissions in the residential sector," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1285-1299, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jing Zhao & Jie Wei & Xiaochen Sun, 2017. "Coordination of fuzzy closed-loop supply chain with price dependent demand under symmetric and asymmetric information conditions," Annals of Operations Research, Springer, vol. 257(1), pages 469-489, October.
    2. Seyed Mahmoud Zanjirchi & Mina Rezaeian Abrishami & Negar Jalilian, 2019. "Four decades of fuzzy sets theory in operations management: application of life-cycle, bibliometrics and content analysis," Scientometrics, Springer;Akadémiai Kiadó, vol. 119(3), pages 1289-1309, June.
    3. Caiado, Rodrigo Goyannes Gusmão & Scavarda, Luiz Felipe & Gavião, Luiz Octávio & Ivson, Paulo & Nascimento, Daniel Luiz de Mattos & Garza-Reyes, Jose Arturo, 2021. "A fuzzy rule-based industry 4.0 maturity model for operations and supply chain management," International Journal of Production Economics, Elsevier, vol. 231(C).
    4. Dang, Jr-Fong & Hong, I-Hsuan, 2013. "The equilibrium quantity and production strategy in a fuzzy random decision environment: Game approach and case study in glass substrates industries," International Journal of Production Economics, Elsevier, vol. 145(2), pages 724-732.
    5. Li, Yan-Lai & Tang, Jia-Fu & Chin, Kwai-Sang & Jiang, Yu-Shi & Han, Yi & Pu, Yun, 2011. "Estimating the final priority ratings of engineering characteristics in mature-period product improvement by MDBA and AHP," International Journal of Production Economics, Elsevier, vol. 131(2), pages 575-586, June.
    6. José M. Merigó & Claudio Muller & Nikunja Mohan Modak & Sigifredo Laengle, 2019. "Research in Production and Operations Management: A University-Based Bibliometric Analysis," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 20(1), pages 1-29, March.
    7. Wenhao Kang & Chi Fai Cheung, 2023. "Banking System Incidents Analysis Using Knowledge Graph," International Journal of Knowledge and Systems Science (IJKSS), IGI Global, vol. 14(1), pages 1-23, January.
    8. Rodrigues, Filipe & Agra, Agostinho, 2022. "Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey," European Journal of Operational Research, Elsevier, vol. 303(2), pages 501-524.
    9. Mandeep Mittal & Vibhor Jain & Jayanti Tripathi Pandey & Muskan Jain & Himani Dem, 2023. "Optimizing Inventory Management: A Comprehensive Analysis of Models Integrating Diverse Fuzzy Demand Functions," Mathematics, MDPI, vol. 12(1), pages 1-18, December.
    10. Yao, Shiqing & Jiang, Zhibin & Li, Na & Zhang, Huai & Geng, Na, 2011. "A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing," International Journal of Production Economics, Elsevier, vol. 130(1), pages 125-133, March.
    11. Bolaños, Rubén Darío Solarte & Barbalho, Sanderson César Macêdo, 2021. "Exploring product complexity and prototype lead-times to predict new product development cycle-times," International Journal of Production Economics, Elsevier, vol. 235(C).
    12. George S. Atsalakis & Eftychios E. Protopapadakis & Kimon P. Valavanis, 2016. "Stock trend forecasting in turbulent market periods using neuro-fuzzy systems," Operational Research, Springer, vol. 16(2), pages 245-269, July.
    13. David Opresnik & Maurizio Fiasché & Marco Taisch & Manuel Hirsch, 2017. "An evolving fuzzy inference system for extraction of rule set for planning a product–service strategy," Information Technology and Management, Springer, vol. 18(2), pages 131-147, June.
    14. Md. Abdul Moktadir & Towfique Rahman & Syed Mithun Ali & Nazmun Nahar & Sanjoy Kumar Paul, 2020. "Examining barriers to reverse logistics practices in the leather footwear industry," Annals of Operations Research, Springer, vol. 293(2), pages 715-746, October.
    15. Silva, Maisa Mendonça & Costa, Ana Paula Cabral Seixas & de Gusmão, Ana Paula Henriques, 2014. "Continuous cooperation: A proposal using a fuzzy multicriteria sorting method," International Journal of Production Economics, Elsevier, vol. 151(C), pages 67-75.
    16. Shih-Pin Chen, 2017. "Effects of fuzzy data on decision making in a competitive supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1146-1160, October.
    17. Osama Abdulaziz Alamri & Navneet Kumar Lamba & Mahesh Kumar Jayaswal & Mandeep Mittal, 2024. "A Sustainable Inventory Model with Advertisement Effort for Imperfect Quality Items under Learning in Fuzzy Monsoon Demand," Mathematics, MDPI, vol. 12(15), pages 1-41, August.
    18. David Opresnik & Maurizio Fiasché & Marco Taisch & Manuel Hirsch, 0. "An evolving fuzzy inference system for extraction of rule set for planning a product–service strategy," Information Technology and Management, Springer, vol. 0, pages 1-17.
    19. Kenneth David Strang, 2012. "Man versus math: Behaviorist exploration of post-crisis non-banking asset management," Journal of Asset Management, Palgrave Macmillan, vol. 13(5), pages 348-367, October.
    20. Linmin Hu & Dequan Yue & Ruiling Tian, 2015. "Fuzzy Availability Assessment for a Repairable Multistate Series-Parallel System," Discrete Dynamics in Nature and Society, Hindawi, vol. 2015, pages 1-11, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Peidro, David & Mula, Josefa & Jiménez, Mariano & del Mar Botella, Ma, 2010. "A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment," European Journal of Operational Research, Elsevier, vol. 205(1), pages 65-80, August.
    2. Zhao, Jing & Tang, Wansheng & Zhao, Ruiqing & Wei, Jie, 2012. "Pricing decisions for substitutable products with a common retailer in fuzzy environments," European Journal of Operational Research, Elsevier, vol. 216(2), pages 409-419.
    3. Jie Wei & Jing Zhao, 2016. "Pricing decisions for substitutable products with horizontal and vertical competition in fuzzy environments," Annals of Operations Research, Springer, vol. 242(2), pages 505-528, July.
    4. Shih-Pin Chen, 2017. "Effects of fuzzy data on decision making in a competitive supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1146-1160, October.
    5. Wang, Juite & Shu, Yun-Feng, 2007. "A possibilistic decision model for new product supply chain design," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1044-1061, March.
    6. Tien-Fu Liang, 2012. "Integrated manufacturing/distribution planning decisions with multiple imprecise goals in an uncertain environment," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(1), pages 137-153, January.
    7. Roozbeh Nia, Ali & Hemmati Far, Mohammad & Akhavan Niaki, Seyed Taghi, 2014. "A fuzzy vendor managed inventory of multi-item economic order quantity model under shortage: An ant colony optimization algorithm," International Journal of Production Economics, Elsevier, vol. 155(C), pages 259-271.
    8. Kristianto, Yohanes & Helo, Petri & Jiao, Jianxin (Roger) & Sandhu, Maqsood, 2012. "Adaptive fuzzy vendor managed inventory control for mitigating the Bullwhip effect in supply chains," European Journal of Operational Research, Elsevier, vol. 216(2), pages 346-355.
    9. J. Behnamian, 2016. "Survey on fuzzy shop scheduling," Fuzzy Optimization and Decision Making, Springer, vol. 15(3), pages 331-366, September.
    10. L. A. Shah & A. Etienne & A. Siadat & F. Vernadat, 2016. "Decision-making in the manufacturing environment using a value-risk graph," Journal of Intelligent Manufacturing, Springer, vol. 27(3), pages 617-630, June.
    11. Carnevalli, Jose A. & Miguel, Paulo Cauchick, 2008. "Review, analysis and classification of the literature on QFD--Types of research, difficulties and benefits," International Journal of Production Economics, Elsevier, vol. 114(2), pages 737-754, August.
    12. Lokesh Nagar & Pankaj Dutta & Karuna Jain, 2014. "An integrated supply chain model for new products with imprecise production and supply under scenario dependent fuzzy random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 873-887, May.
    13. K A H Kobbacy & S Vadera & M H Rasmy, 2007. "AI and OR in management of operations: history and trends," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 10-28, January.
    14. Handfield, Robert & Warsing, Don & Wu, Xinmin, 2009. "(Q,r) Inventory policies in a fuzzy uncertain supply chain environment," European Journal of Operational Research, Elsevier, vol. 197(2), pages 609-619, September.
    15. Tang, Christopher S. & Davarzani, Hoda & Sarkis, Joseph, 2015. "Quantitative models for managing supply chain risks: A reviewAuthor-Name: Fahimnia, Behnam," European Journal of Operational Research, Elsevier, vol. 247(1), pages 1-15.
    16. Azadegan, Arash & Porobic, Lejla & Ghazinoory, Sepehr & Samouei, Parvaneh & Saman Kheirkhah, Amir, 2011. "Fuzzy logic in manufacturing: A review of literature and a specialized application," International Journal of Production Economics, Elsevier, vol. 132(2), pages 258-270, August.
    17. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    18. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Managing real-time demand fluctuation under a supplier–retailer coordinated system," International Journal of Production Economics, Elsevier, vol. 158(C), pages 231-243.
    19. Xie, Ying & Petrovic, Dobrila & Burnham, Keith, 2006. "A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand," International Journal of Production Economics, Elsevier, vol. 102(1), pages 37-50, July.
    20. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:157-168. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.