IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v183y2007i1p442-459.html
   My bibliography  Save this article

Analysis of critical paths in a project network with fuzzy activity times

Author

Listed:
  • Chen, Shih-Pin

Abstract

No abstract is available for this item.

Suggested Citation

  • Chen, Shih-Pin, 2007. "Analysis of critical paths in a project network with fuzzy activity times," European Journal of Operational Research, Elsevier, vol. 183(1), pages 442-459, November.
  • Handle: RePEc:eee:ejores:v:183:y:2007:i:1:p:442-459
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00613-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chanas, Stefan & Zielinski, Pawel, 2002. "The computational complexity of the criticality problems in a network with interval activity times," European Journal of Operational Research, Elsevier, vol. 136(3), pages 541-550, February.
    2. Dubois, Didier & Fargier, Helene & Galvagnon, Vincent, 2003. "On latest starting times and floats in activity networks with ill-known durations," European Journal of Operational Research, Elsevier, vol. 147(2), pages 266-280, June.
    3. Ragsdale, C, 1989. "The current state of network simulation in project management theory and practice," Omega, Elsevier, vol. 17(1), pages 21-25.
    4. Slyeptsov, Anatoliy I. & Tyshchuk, Tetyana A., 2003. "Fuzzy temporal characteristics of operations for project management on the network models basis," European Journal of Operational Research, Elsevier, vol. 147(2), pages 253-265, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 119-140, September.
    2. Luz Stella Cardona-Meza & Gerard Olivar-Tost, 2017. "Modeling and Simulation of Project Management through the PMBOK® Standard Using Complex Networks," Complexity, Hindawi, vol. 2017, pages 1-12, December.
    3. Fernando Acebes & Javier Pajares & José M. González-Varona & Adolfo López-Paredes, 2021. "Project risk management from the bottom-up: Activity Risk Index," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1375-1396, December.
    4. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 1-22, September.
    5. Dorota Kuchta, 2010. "Generalization of the critical chain method supporting the management of projects with a high degree of uncertainty and imperfect information," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 20(2), pages 77-90.
    6. Yakhchali, Siamak Haji & Ghodsypour, Seyed Hassan, 2010. "Computing latest starting times of activities in interval-valued networks with minimal time lags," European Journal of Operational Research, Elsevier, vol. 200(3), pages 874-880, February.
    7. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2022. "Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 297(2), pages 451-466.
    8. Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2021. "Using Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 288(3), pages 736-752.
    9. Mukesh Kumar Mehlawat & Nishtha Grover, 2018. "Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection," Annals of Operations Research, Springer, vol. 269(1), pages 505-520, October.
    10. Chen, Shih-Pin & Tsai, Ming-Jiun, 2011. "Time-cost trade-off analysis of project networks in fuzzy environments," European Journal of Operational Research, Elsevier, vol. 212(2), pages 386-397, July.
    11. Conde, Eduardo, 2009. "A minmax regret approach to the critical path method with task interval times," European Journal of Operational Research, Elsevier, vol. 197(1), pages 235-242, August.
    12. Wright, Daniel G. & Dey, Prasanta K. & Brammer, John G., 2013. "A fuzzy levelised energy cost method for renewable energy technology assessment," Energy Policy, Elsevier, vol. 62(C), pages 315-323.
    13. Madadi, M. & Iranmanesh, H., 2012. "A management oriented approach to reduce a project duration and its risk (variability)," European Journal of Operational Research, Elsevier, vol. 219(3), pages 751-761.
    14. Wong, Bo K. & Lai, Vincent S., 2011. "A survey of the application of fuzzy set theory in production and operations management: 1998-2009," International Journal of Production Economics, Elsevier, vol. 129(1), pages 157-168, January.
    15. Zhao, Mingxuan & Zhou, Jian & Wang, Ke & Pantelous, Athanasios A., 2023. "Project scheduling problem with fuzzy activity durations: A novel operational law based solution framework," European Journal of Operational Research, Elsevier, vol. 306(2), pages 519-534.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yakhchali, Siamak Haji & Ghodsypour, Seyed Hassan, 2010. "Computing latest starting times of activities in interval-valued networks with minimal time lags," European Journal of Operational Research, Elsevier, vol. 200(3), pages 874-880, February.
    2. Kasperski, Adam & Zielinski, Pawel, 2010. "Minmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weights," European Journal of Operational Research, Elsevier, vol. 200(3), pages 680-687, February.
    3. Mukesh Kumar Mehlawat & Nishtha Grover, 2018. "Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection," Annals of Operations Research, Springer, vol. 269(1), pages 505-520, October.
    4. Meloni, Carlo & Pranzo, Marco & Samà, Marcella, 2022. "Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops," International Journal of Production Economics, Elsevier, vol. 247(C).
    5. Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
    6. Badinelli, Ralph D., 1996. "Approximating probability density functions and their convolutions using orthogonal polynomials," European Journal of Operational Research, Elsevier, vol. 95(1), pages 211-230, November.
    7. Conde, Eduardo, 2012. "On a constant factor approximation for minmax regret problems using a symmetry point scenario," European Journal of Operational Research, Elsevier, vol. 219(2), pages 452-457.
    8. Williams, Terry, 1999. "Towards realism in network simulation," Omega, Elsevier, vol. 27(3), pages 305-314, June.
    9. V. Sireesha & N. Ravi Shankar, 2013. "A new approach to find project characteristics and multiple possible critical paths in a fuzzy project network," Fuzzy Information and Engineering, Springer, vol. 5(1), pages 69-85, March.
    10. Williams, Terry, 1995. "A classified bibliography of recent research relating to project risk management," European Journal of Operational Research, Elsevier, vol. 85(1), pages 18-38, August.
    11. N-H Shih, 2005. "Estimating completion-time distribution in stochastic activity networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 744-749, June.
    12. Carlo Meloni & Marco Pranzo, 2020. "Expected shortfall for the makespan in activity networks under imperfect information," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 668-692, September.
    13. Mehdi Zandebasiri & Hrald Vacik & Daniel Etongo & Yasmin Dorfstetter & Javad Soosani & Mehdi Pourhashemi, 2019. "Application of time-cost trade-off model in forest management projects: The case of Oak decline project," Journal of Forest Science, Czech Academy of Agricultural Sciences, vol. 65(12), pages 481-492.
    14. Dawson, C. W., 1995. "A dynamic sampling technique for the simulation of probabilistic and generalized activity networks," Omega, Elsevier, vol. 23(5), pages 557-566, October.
    15. Kasperski, Adam & Zielinski, Pawel, 2007. "On combinatorial optimization problems on matroids with uncertain weights," European Journal of Operational Research, Elsevier, vol. 177(2), pages 851-864, March.
    16. Li He & Qiyan Cao & Fengjun Shang, 2019. "Measuring Component Importance for Network System Using Cellular Automata," Complexity, Hindawi, vol. 2019, pages 1-11, May.
    17. Conde, Eduardo, 2009. "A minmax regret approach to the critical path method with task interval times," European Journal of Operational Research, Elsevier, vol. 197(1), pages 235-242, August.
    18. Madadi, M. & Iranmanesh, H., 2012. "A management oriented approach to reduce a project duration and its risk (variability)," European Journal of Operational Research, Elsevier, vol. 219(3), pages 751-761.
    19. Wong, Bo K. & Lai, Vincent S., 2011. "A survey of the application of fuzzy set theory in production and operations management: 1998-2009," International Journal of Production Economics, Elsevier, vol. 129(1), pages 157-168, January.
    20. Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:183:y:2007:i:1:p:442-459. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.