Deterministic models for premature and postponed replacement
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2013.01.002
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Huisman, Kuno J. M. & Kort, Peter M., 2004.
"Strategic technology adoption taking into account future technological improvements: A real options approach,"
European Journal of Operational Research, Elsevier, vol. 159(3), pages 705-728, December.
- Huisman, K.J.M. & Kort, P.M., 2000. "Strategic Technology Adoptation Taking into Account Future Technological Improvements : A Real Options Approach," Other publications TiSEM 58197f38-6bbe-4797-b1f6-d, Tilburg University, School of Economics and Management.
- Huisman, K.J.M. & Kort, P.M., 2004. "Strategic technology adoption taking into account future technological improvements : A real options approach," Other publications TiSEM cfab60d6-970e-4dc7-b11c-e, Tilburg University, School of Economics and Management.
- Huisman, K.J.M. & Kort, P.M., 2000. "Strategic Technology Adoptation Taking into Account Future Technological Improvements : A Real Options Approach," Discussion Paper 2000-52, Tilburg University, Center for Economic Research.
- Jörnsten, Kurt & Lise Nonås, Sigrid & Sandal, Leif & Ubøe, Jan, 2013. "Mixed contracts for the newsvendor problem with real options and discrete demand," Omega, Elsevier, vol. 41(5), pages 809-819.
- Martzoukos, Spiros H. & Zacharias, Eleftherios, 2013.
"Real option games with R&D and learning spillovers,"
Omega, Elsevier, vol. 41(2), pages 236-249.
- Martzoukos, Spiros H & Zacharias, Eleftherios, 2008. "Real Option Games with R&D and Learning Spillovers," MPRA Paper 12686, University Library of Munich, Germany.
- Huisman, Kuno J. M. & Kort, Peter M., 2003.
"Strategic investment in technological innovations,"
European Journal of Operational Research, Elsevier, vol. 144(1), pages 209-223, January.
- Huisman, K.J.M. & Kort, P.M., 1998. "Strategic Investment in Technological Innovations," Other publications TiSEM 2019f108-688f-41f3-9baf-f, Tilburg University, School of Economics and Management.
- Huisman, K.J.M. & Kort, P.M., 1998. "Strategic Investment in Technological Innovations," Discussion Paper 1998-114, Tilburg University, Center for Economic Research.
- Huisman, K.J.M. & Kort, P.M., 2003. "Strategic investment in technological innovations," Other publications TiSEM 19205076-9017-44f3-8658-3, Tilburg University, School of Economics and Management.
- Feldstein, Martin S & Rothschild, Michael, 1974. "Towards an Economic Theory of Replacement Investment," Econometrica, Econometric Society, vol. 42(3), pages 393-423, May.
- Chin Tan & Joseph Hartman, 2010. "Equipment replacement analysis with an uncertain finite horizon," IISE Transactions, Taylor & Francis Journals, vol. 42(5), pages 342-353.
- Yatsenko, Yuri & Hritonenko, Natali, 2011. "Economic life replacement under improving technology," International Journal of Production Economics, Elsevier, vol. 133(2), pages 596-602, October.
- Margaret H. Smith, 2005. "Uncertainty and the adoption of complementary technologies," Industrial and Corporate Change, Oxford University Press and the Associazione ICC, vol. 14(4), pages 639-650, August.
- Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
- Adkins, Roger & Paxson, Dean, 2011. "Renewing Assets with Uncertain Revenues and Operating Costs," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 46(3), pages 785-813, June.
- Westwood, John B, 1981. "An empirical excursion into the quicksand of vehicle replacement," Omega, Elsevier, vol. 9(2), pages 195-202.
- de Sousa, Jorge Freire & Guimaraes, Rui Campos, 1997. "Setting the length of the planning horizon in the vehicle replacement problem," European Journal of Operational Research, Elsevier, vol. 101(3), pages 550-559, September.
- Ye, Meng-Hua, 1990. "Optimal replacement policy with stochastic maintenance and operation costs," European Journal of Operational Research, Elsevier, vol. 44(1), pages 84-94, January.
- T. Goldstein & S. P. Ladany & A. Mehrez, 1986. "Technical Note—A Dual Machine Replacement Model: A Note on Planning Horizon Procedures for Machine Replacements," Operations Research, INFORMS, vol. 34(6), pages 938-941, December.
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
- Benjamin Caplan, 1940. "The Premature Abandonment of Machinery," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 7(2), pages 113-122.
- Nair, Suresh K. & Hopp, Wallace J., 1992. "A model for equipment replacement due to technological obsolescence," European Journal of Operational Research, Elsevier, vol. 63(2), pages 207-221, December.
- Wu, Chin-Chun & Chou, Chao-Yu & Huang, Chikong, 2009. "Optimal price, warranty length and production rate for free replacement policy in the static demand market," Omega, Elsevier, vol. 37(1), pages 29-39, February.
- Fraser, Jane M. & Posey, Jack W., 1989. "A framework for replacement analysis," European Journal of Operational Research, Elsevier, vol. 40(1), pages 43-57, May.
- Joseph T. Williams, 1997. "Redevelopment of Real Assets," Real Estate Economics, American Real Estate and Urban Economics Association, vol. 25(3), pages 387-407, September.
- Dentskevich, P & Salkin, G, 1991. "Valuation of real projects using option pricing techniques," Omega, Elsevier, vol. 19(4), pages 207-222.
- Pae, Jae H. & Hyun, Jung Suk, 2006. "Technology advancement strategy on patronage decisions: the role of switching costs in high-technology markets," Omega, Elsevier, vol. 34(1), pages 19-27, January.
- Tsai, Wen-Hsien & Hung, Shih-Jieh, 2009. "Dynamic pricing and revenue management process in Internet retailing under uncertainty: An integrated real options approach," Omega, Elsevier, vol. 37(2), pages 471-481, April.
- Ian M. Dobbs, 2004. "Replacement Investment: Optimal Economic Life Under Uncertainty," Journal of Business Finance & Accounting, Wiley Blackwell, vol. 31(5‐6), pages 729-757, June.
- Ian M. Dobbs, 2004. "Replacement Investment: Optimal Economic Life Under Uncertainty," Journal of Business Finance & Accounting, Wiley Blackwell, vol. 31(5-6), pages 729-757.
- Malchow-Moller, Nikolaj & Thorsen, Bo Jellesmark, 2005. "Repeated real options: optimal investment behaviour and a good rule of thumb," Journal of Economic Dynamics and Control, Elsevier, vol. 29(6), pages 1025-1041, June.
- Mauer, David C. & Ott, Steven H., 1995. "Investment under Uncertainty: The Case of Replacement Investment Decisions," Journal of Financial and Quantitative Analysis, Cambridge University Press, vol. 30(4), pages 581-605, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yatsenko, Yuri & Hritonenko, Natali, 2020. "Optimal asset replacement: Profit maximization under varying technology," International Journal of Production Economics, Elsevier, vol. 228(C).
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V., 2017. "A study of postponed replacement in a delay time model," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 70-79.
- Adkins, Roger & Paxson, Dean, 2017. "Replacement decisions with multiple stochastic values and depreciation," European Journal of Operational Research, Elsevier, vol. 257(1), pages 174-184.
- Mørch, Ove & Fagerholt, Kjetil & Pantuso, Giovanni & Rakke, Jørgen, 2017. "Maximizing the rate of return on the capital employed in shipping capacity renewal," Omega, Elsevier, vol. 67(C), pages 42-53.
- Wang, Jingjing & Yang, Li & Ma, Xiaobing & Peng, Rui, 2021. "Joint optimization of multi-window maintenance and spare part provisioning policies for production systems," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Wu, Jun & Du, Gang & Jiao, Roger J., 2021. "Optimal postponement contracting decisions in crowdsourced manufacturing: A three-level game-theoretic model for product family architecting considering subcontracting," European Journal of Operational Research, Elsevier, vol. 291(2), pages 722-737.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Adkins, Roger & Paxson, Dean, 2017. "Replacement decisions with multiple stochastic values and depreciation," European Journal of Operational Research, Elsevier, vol. 257(1), pages 174-184.
- Yuri Yatsenko & Natali Hritonenko, 2016. "Asset replacement under improving operating and capital costs: a practical approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 2922-2933, May.
- Richardson, Steven & Kefford, Adrian & Hodkiewicz, Melinda, 2013. "Optimised asset replacement strategy in the presence of lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 141(2), pages 659-667.
- Adkins, Roger & Paxson, Dean, 2013. "The effect of tax depreciation on the stochastic replacement policy," European Journal of Operational Research, Elsevier, vol. 229(1), pages 155-164.
- Reindorp, Matthew J. & Fu, Michael C., 2011. "Capital renewal as a real option," European Journal of Operational Research, Elsevier, vol. 214(1), pages 109-117, October.
- Stutzman, Sarah & Weiland, Brandon & Preckel, Paul & Wetzstein, Michael, 2017. "Optimal replacement policies for an uncertain rejuvenated asset," International Journal of Production Economics, Elsevier, vol. 185(C), pages 21-33.
- Koch, Nicolas & Reuter, Wolf Heinrich & Fuss, Sabine & Grosjean, Godefroy, 2017. "Permits vs. offsets under investment uncertainty," Resource and Energy Economics, Elsevier, vol. 49(C), pages 33-47.
- Ben Abdallah, Skander & Lasserre, Pierre, 2016.
"Asset retirement with infinitely repeated alternative replacements: Harvest age and species choice in forestry,"
Journal of Economic Dynamics and Control, Elsevier, vol. 70(C), pages 144-164.
- Skander Ben Abdallah & Pierre Lasserre, 2016. "Asset Retirement with Infinitely Repeated Alternative Replacements: Harvest Age and Species Choice in Forestry," CIRANO Working Papers 2016s-37, CIRANO.
- Alcino Azevedo & Dean Paxson, 2018. "Rivalry and uncertainty in complementary investments with dynamic market sharing," Annals of Operations Research, Springer, vol. 271(2), pages 319-355, December.
- Sarkar, Sudipto, 2021. "The uncertainty-investment relationship with endogenous capacity," Omega, Elsevier, vol. 98(C).
- Roger Adkins & Dean Paxson, 2014. "Stochastic Equipment Capital Budgeting with Technological Progress," European Financial Management, European Financial Management Association, vol. 20(5), pages 1031-1049, November.
- Zambujal-Oliveira, João & Duque, João, 2011. "Operational asset replacement strategy: A real options approach," European Journal of Operational Research, Elsevier, vol. 210(2), pages 318-325, April.
- Arve, Malin & Zwart, Gijsbert, 2023. "Optimal procurement and investment in new technologies under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 147(C).
- Adkins, Roger & Paxson, Dean, 2019. "Rescaling-contraction with a lower cost technology when revenue declines," European Journal of Operational Research, Elsevier, vol. 277(2), pages 574-586.
- Lukas, Elmar & Welling, Andreas, 2017. "Efficient non-cooperative bargaining despite keeping strategic information private," Journal of Corporate Finance, Elsevier, vol. 42(C), pages 287-294.
- Nykamp, Stefan & Andor, Mark & Hurink, Johann L., 2012. "‘Standard’ incentive regulation hinders the integration of renewable energy generation," Energy Policy, Elsevier, vol. 47(C), pages 222-237.
- Sendstad, Lars Hegnes & Chronopoulos, Michail, 2017. "Strategic Technology Switching under Risk Aversion and Uncertainty," Discussion Papers 2017/10, Norwegian School of Economics, Department of Business and Management Science.
- Weiland, Brandon & Sesmero, Juan Pablo & Preckel, Paul & Wetzstein, Michael E., 2017.
"Can Wood Pellets Save Coal?,"
2017 Annual Meeting, July 30-August 1, Chicago, Illinois
258250, Agricultural and Applied Economics Association.
- Weiland, Brandon & Sesmero, Juan Pablo & Preckel, Paul & Wetzstein, Michael E., 2018. "Can Wood Pellets Save Coal?," 2018 Annual Meeting, August 5-7, Washington, D.C. 274315, Agricultural and Applied Economics Association.
- Wang, Congcong & Chen, Shanshan & Wang, Yuhan & Pansera, Bruno Antonio & Luckraz, Shravan, 2023. "On the welfare and policy implications of a two-period real option game," Socio-Economic Planning Sciences, Elsevier, vol. 90(C).
More about this item
Keywords
Replacement; Dynamic programming; Technological progress; Finance;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:41:y:2013:i:6:p:1008-1019. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.