IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v40y1992i1-supplement-1ps145-s156.html
   My bibliography  Save this item

Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  2. Hark‐Chin Hwang & Wilco van den Heuvel, 2012. "Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(3‐4), pages 244-253, April.
  3. Heuvel, Wilco van den & Borm, Peter & Hamers, Herbert, 2007. "Economic lot-sizing games," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1117-1130, January.
  4. Marshall Fisher & Kamalini Ramdas & Yu-Sheng Zheng, 2001. "Ending Inventory Valuation in Multiperiod Production Scheduling," Management Science, INFORMS, vol. 47(5), pages 679-692, May.
  5. A.P.M. Wagelmans & A.E. Gerodimos, 1999. "Improved Dynamic Programs for Some Batching Problems involving the Maximum Lateness Criterion," Tinbergen Institute Discussion Papers 99-036/4, Tinbergen Institute.
  6. Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
  7. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
  8. Karla E. Bourland & Candace Arai Yano, 1996. "Lot sizing when yields increase during the production run," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1035-1047, December.
  9. Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
  10. van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.
  11. Cunha, Jesus O. & Melo, Rafael A., 2021. "Valid inequalities, preprocessing, and an effective heuristic for the uncapacitated three-level lot-sizing and replenishment problem with a distribution structure," European Journal of Operational Research, Elsevier, vol. 295(3), pages 874-892.
  12. José M. Gutiérrez & Beatriz Abdul-Jalbar & Joaquín Sicilia & Inmaculada Rodríguez-Martín, 2021. "Effective Algorithms for the Economic Lot-Sizing Problem with Bounded Inventory and Linear Fixed-Charge Cost Structure," Mathematics, MDPI, vol. 9(6), pages 1-21, March.
  13. Martel, Alain & Gascon, Andre, 1998. "Dynamic lot-sizing with price changes and price-dependent holding costs," European Journal of Operational Research, Elsevier, vol. 111(1), pages 114-128, November.
  14. Okhrin, Irena & Richter, Knut, 2010. "The linear dynamic lot size problem with minimum order quantities," Discussion Papers 283, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
  15. Wilco van den Heuvel & Albert P.M. Wagelmans, 2002. "A Note on Ending Inventory Valuation in Multiperiod Production Scheduling," Tinbergen Institute Discussion Papers 02-067/4, Tinbergen Institute.
  16. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria & van den Heuvel, Wilco, 2020. "A single-item lot-sizing problem with a by-product and inventory capacities," European Journal of Operational Research, Elsevier, vol. 287(3), pages 844-855.
  17. Chung-Yee Lee & Sila Çetinkaya & Albert P. M. Wagelmans, 2001. "A Dynamic Lot-Sizing Model with Demand Time Windows," Management Science, INFORMS, vol. 47(10), pages 1384-1395, October.
  18. Awi Federgruen & Joern Meissner, 2009. "Competition under time‐varying demands and dynamic lot sizing costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 57-73, February.
  19. Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
  20. Hnaien, Faicel & Afsar, Hasan Murat, 2017. "Robust single-item lot-sizing problems with discrete-scenario lead time," International Journal of Production Economics, Elsevier, vol. 185(C), pages 223-229.
  21. Fink, Jiří & Hurink, Johann L., 2015. "Minimizing costs is easier than minimizing peaks when supplying the heat demand of a group of houses," European Journal of Operational Research, Elsevier, vol. 242(2), pages 644-650.
  22. Romeijn, H.E. & van den Heuvel, W.J. & Geunes, J., 2012. "Mitigating the Cost of Anarchy in Supply Chain Systems," Econometric Institute Research Papers EI 2012-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  23. Hartmut Stadtler, 2000. "Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem," Management Science, INFORMS, vol. 46(2), pages 318-326, February.
  24. Chung-Yee Lee & Sila Çetinkaya & Albert P.M. Wagelmans, 1999. "A Dynamic Lot-Sizing Model with Demand Time Windows," Tinbergen Institute Discussion Papers 99-095/4, Tinbergen Institute.
  25. H. Edwin Romeijn & Dolores Romero Morales & Wilco Van den Heuvel, 2014. "Computational complexity of finding Pareto efficient outcomes for biobjective lot‐sizing models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(5), pages 386-402, August.
  26. van Hoesel, S. & Romeijn, H.E. & Romero Morales, D. & Wagelmans, A.P.M., 2002. "Polynomial Time Algorithms For Some Multi-Level Lot-Sizing Problems With Production Capacities," ERIM Report Series Research in Management ERS-2002-59-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  27. Olivier Pereira & Laurence Wolsey, 2001. "On the Wagner-Whitin Lot-Sizing Polyhedron," Mathematics of Operations Research, INFORMS, vol. 26(3), pages 591-600, August.
  28. Önal, Mehmet & van den Heuvel, Wilco & Dereli, Meryem Merve & Albey, Erinç, 2023. "Economic lot sizing problem with tank scheduling," European Journal of Operational Research, Elsevier, vol. 308(1), pages 166-182.
  29. Vladimir Krasik & Joseph Leung & Michael Pinedo & Jiawei Zhang, 2008. "Scheduling multiple products on parallel machines with setup costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 654-669, October.
  30. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
  31. Wagelmans, A.P.M. & Gerodimos, A.E., 1998. "Improved dynamic programs for batching problems with maximum lateness criterion," Econometric Institute Research Papers EI 9857, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  32. Xiao Liu & Simge Küçükyavuz, 2018. "A polyhedral study of the static probabilistic lot-sizing problem," Annals of Operations Research, Springer, vol. 261(1), pages 233-254, February.
  33. Balachandran Vaidyanathan & Ravindra K. Ahuja, 2010. "Fast Algorithms for Specially Structured Minimum Cost Flow Problems with Applications," Operations Research, INFORMS, vol. 58(6), pages 1681-1696, December.
  34. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Geometric Algorithm to solve the NI/G/NI/ND Capacitated Lot-Sizing Problem in O(T^2) Time," ERIM Report Series Research in Management ERS-2003-066-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  35. Atamturk, Alper & Munoz, Juan Carlos, 2002. "A Study of the Lot-Sizing Polytope," University of California Transportation Center, Working Papers qt6zz2g0z4, University of California Transportation Center.
  36. Bian, Yuan & Lemoine, David & Yeung, Thomas G. & Bostel, Nathalie & Hovelaque, Vincent & Viviani, Jean-laurent & Gayraud, Fabrice, 2018. "A dynamic lot-sizing-based profit maximization discounted cash flow model considering working capital requirement financing cost with infinite production capacity," International Journal of Production Economics, Elsevier, vol. 196(C), pages 319-332.
  37. TELHA, Claudio & VAN VYVE, Matthieu, 2014. "Efficient approximation algorithms for the economic lot-sizing in continuous time," LIDAM Discussion Papers CORE 2014016, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  38. Farhat, Mlouka & Akbalik, Ayse & Hadj-Alouane, Atidel B. & Sauer, Nathalie, 2019. "Lot sizing problem with batch ordering under periodic buyback contract and lost sales," International Journal of Production Economics, Elsevier, vol. 208(C), pages 500-511.
  39. Passchyn, Ward & Coene, Sofie & Briskorn, Dirk & Hurink, Johann L. & Spieksma, Frits C.R. & Vanden Berghe, Greet, 2016. "The lockmaster’s problem," European Journal of Operational Research, Elsevier, vol. 251(2), pages 432-441.
  40. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
  41. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
  42. Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
  43. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  44. van den Heuvel, W., 2004. "On the complexity of the economic lot-sizing problem with remanufacturing options," Econometric Institute Research Papers EI 2004-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  45. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
  46. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  47. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W. & Wagelmans, A.P.M., 2012. "The Economic Lot-Sizing Problem with an Emission Constraint," Econometric Institute Research Papers EI 2011-41, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  48. Alper Atamtürk & Dorit S. Hochbaum, 2001. "Capacity Acquisition, Subcontracting, and Lot Sizing," Management Science, INFORMS, vol. 47(8), pages 1081-1100, August.
  49. Lap Mui Ann Chan & Ana Muriel & Zuo-Jun Shen & David Simchi-Levi, 2002. "On the Effectiveness of Zero-Inventory-Ordering Policies for the Economic Lot-Sizing Model with a Class of Piecewise Linear Cost Structures," Operations Research, INFORMS, vol. 50(6), pages 1058-1067, December.
  50. Zhili Zhou & Yongpei Guan, 2013. "Two-stage stochastic lot-sizing problem under cost uncertainty," Annals of Operations Research, Springer, vol. 209(1), pages 207-230, October.
  51. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
  52. Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
  53. Hwang, Hark-Chin & Kang, Jangha, 2021. "An improved algorithm for the lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 100(C).
  54. van den Heuvel, Wilco & Wagelmans, Albert P.M., 2006. "A polynomial time algorithm for a deterministic joint pricing and inventory model," European Journal of Operational Research, Elsevier, vol. 170(2), pages 463-480, April.
  55. Akbalik, Ayse & Rapine, Christophe, 2018. "Lot sizing problem with multi-mode replenishment and batch delivery," Omega, Elsevier, vol. 81(C), pages 123-133.
  56. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P.M. Wagelmans, 2002. "Polynomial Time Algorithms for Some Multi-Level Lot-Sizing Problems with Production Capacities," Tinbergen Institute Discussion Papers 02-066/4, Tinbergen Institute.
  57. Dziuba, Daryna & Almeder, Christian, 2023. "New construction heuristic for capacitated lot sizing problems," European Journal of Operational Research, Elsevier, vol. 311(3), pages 906-920.
  58. Akartunalı, Kerem & Dauzère-Pérès, Stéphane, 2022. "Dynamic lot sizing with stochastic demand timing," European Journal of Operational Research, Elsevier, vol. 302(1), pages 221-229.
  59. van Hoesel, C.P.M. & Wagelmans, A., 2006. "On the p-coverage problem on the real line," Research Memorandum 044, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
  60. Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
  61. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
  62. Eksioglu, Sandra Duni, 2009. "A primal-dual algorithm for the economic lot-sizing problem with multi-mode replenishment," European Journal of Operational Research, Elsevier, vol. 197(1), pages 93-101, August.
  63. Shiman Ding & Philip M. Kaminsky, 2020. "Centralized and Decentralized Warehouse Logistics Collaboration," Manufacturing & Service Operations Management, INFORMS, vol. 22(4), pages 812-831, July.
  64. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
  65. Yongpei Guan & Andrew J. Miller, 2008. "Polynomial-Time Algorithms for Stochastic Uncapacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 56(5), pages 1172-1183, October.
  66. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
  67. H-J Kim & D-H Lee & P Xirouchakis, 2006. "A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(10), pages 1231-1240, October.
  68. Jean-Philippe Gayon & Guillaume Massonnet & Christophe Rapine & Gautier Stauffer, 2017. "Fast Approximation Algorithms for the One-Warehouse Multi-Retailer Problem Under General Cost Structures and Capacity Constraints," Mathematics of Operations Research, INFORMS, vol. 42(3), pages 854-875, August.
  69. Yongpei Guan, 2011. "Stochastic lot-sizing with backlogging: computational complexity analysis," Journal of Global Optimization, Springer, vol. 49(4), pages 651-678, April.
  70. Alper Atamtürk & Simge Küçükyavuz, 2005. "Lot Sizing with Inventory Bounds and Fixed Costs: Polyhedral Study and Computation," Operations Research, INFORMS, vol. 53(4), pages 711-730, August.
  71. Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
  72. Hwang, H.C., 2009. "Economic Lot-Sizing Problem with Bounded Inventory and Lost-Sales," Econometric Institute Research Papers EI 2009-01, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  73. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
  74. Jian Yang & Boaz Golany & Gang Yu, 2005. "A concave‐cost production planning problem with remanufacturing options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 443-458, August.
  75. van Hoesel, C.P.M. & Romeijn, H.E. & Romero Morales, M.D. & Wagelmans, A., 2002. "Polynomial time algorithms for some multi-level lot-sizing problems with production capacities," Research Memorandum 018, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
  76. repec:ems:eureir:1796 is not listed on IDEAS
  77. Önal, Mehmet & van den Heuvel, Wilco & Liu, Tieming, 2012. "A note on “The economic lot sizing problem with inventory bounds”," European Journal of Operational Research, Elsevier, vol. 223(1), pages 290-294.
  78. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
  79. Hwang, Hark-Chin & Kang, Jangha, 2020. "The two-level lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 90(C).
  80. Chung-Lun Li & Vernon Ning Hsu & Wen-Qiang Xiao, 2004. "Dynamic Lot Sizing with Batch Ordering and Truckload Discounts," Operations Research, INFORMS, vol. 52(4), pages 639-654, August.
  81. van den Heuvel, W. & Kundakcioglu, O.E. & Geunes, J. & Romeijn, H.E. & Sharkey, T.C. & Wagelmans, A.P.M., 2007. "Integrated market selection and production planning: complexity and solution approaches," Econometric Institute Research Papers EI 2007-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  82. Lee, C.Y. & Cetinkaya, S. & Wagelmans, A.P.M., 1999. "A dynamic lot-sizing model with demand time windows," Econometric Institute Research Papers EI 9948-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  83. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
  84. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Four equivalent lot-sizing models," Econometric Institute Research Papers EI 2007-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  85. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
  86. Atamturk, Alper & Munoz, Juan Carlos, 2002. "A Study of the Lot-Sizing Polytope," University of California Transportation Center, Working Papers qt9gx170tx, University of California Transportation Center.
  87. H-J Kim & D-H Lee & P Xirouchakis & O K Kwon, 2009. "A branch and bound algorithm for disassembly scheduling with assembly product structure," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 419-430, March.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.